Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technology readiness assessement Review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Demonstrating system for servicing satellites

NASA has initiated a program to demonstrate a Satellite Servicer System prototype in a series of flight tests with the Space Shuttle. When the commitment to an operational system has been demonstrated, it is anticipated that a variety of missions will develop that can productively use the servicing capability. Rendezvous and proximity operations contain key enabling technologies needed for an effective operational system. Guidance, navigation and control hardware and operational techniques must be integrated into the program. Supporting sensor technology may limit or enhance the capability of the system depending on its readiness. Requirements for docking the spacecraft in the system concept development and technology requirements are reviewed. Examples of the initial assessment of technology readiness and applications opportunities are discussed. The degree of autonomy is of particular interest.

Jenkins, Lyle M.↗

Autonomous System Operations for Lunar Safe Haven Establishment and Sustainment

To enable a sustainable, permanent human lunar presence, NASA must provide a safe haven shelter to protect astronauts and equipment from radiation, thermal extremes, and micro-meteoroids (MM). Planning and development for a robust Safe Haven includes an examination of NASA activities in site preparation, excavation, regolith transfer, surface operations, autonomous monitoring and maintenance, advanced manufacturing, and in-situ resource utilization (ISRU) for identifying the best approaches when implementing a safe haven shelter. These NASA activities were reviewed as a part of a trade study conducted at NASA Langley to assess technological needs and estimated technology readiness levels (TRL). This paper presents a thorough review of the role and level of autonomy in the establishment and sustainment operations of a Lunar Safe Haven.

Walter J Waltz↗

Autonomous System Operations for Lunar Safe Haven Establishment and Sustainment

To enable a sustainable, permanent human lunar presence, NASA must provide a safe haven shelter to protect astronauts and equipment from radiation, thermal extremes, and micro-meteoroids (MM). Planning and development for a robust Safe Haven includes an examination of NASA activities in site preparation, excavation, regolith transfer, surface operations, autonomous monitoring and maintenance, advanced manufacturing, and in-situ resource utilization (ISRU) for identifying the best approaches when implementing a safe haven shelter. These NASA activities were reviewed as a part of a trade study conducted at NASA Langley to assess technological needs and estimated technology readiness levels (TRL). This paper presents a thorough review of the role and level of autonomy in the establishment and sustainment operations of a Lunar Safe Haven.

Walter J Waltz↗

Managing Space Technology Development at NASA

NASA uses a structured process for managing projects that develop advanced space technologies and transition them into the designs of flight systems. The four-part process consists of formulation, approval, implementation, and transition. In the formulation phase, technology needs are derived from mission concept studies, various technical approaches for meeting the technology needs are identified, technical performance goals called Key Performance Parameters (KPPs) are established, and a project plan is developed. Prior to project approval, an Independent Formulation Review is conducted to ensure that the project objectives are aligned with the mission needs, and that the project is well planned to meet the objectives. In the implementation phase, the technology development project matures the technology, and progress towards the KPPs is evaluated in periodic status reviews. Technology Readiness Levels (TRLs) are used throughout the project lifecycle to assess the progress of technology maturation. In the transition phase, technologies that are successful in achieving the required level of maturity are transitioned to a customer for further development, are used in system designs, or are thoroughly documented for resumption of development at a later date. The customer or end-user of the technology is involved in all phases of the technology development process.

Moore, Christopher L.↗

[Component and System Level of the FASTRAC Engine]

The primary activities of Lee & Associates during the period 7/20/99 to 12/31/99 as specified in the referenced Purchase Order has been in direct support of the Advanced Space Technology Program OfFice's Core Propulsion Project. An independent review to assess the program readiness to conduct component and system level testing of the FASTRAC Engine and to proceed into Fabrication has been provided. This was accomplished through the identification of program weaknesses and potential failure areas and where applicable recommended solutions were suggested to the Program Office that would mitigate technical and program risk. The approach taken to satisfy the objectives has been for the contractor to provide a team of experts with relevant experience from past programs and a strong background of experience in the fields critical to the success of the program. The team participated in Test Planning, Test Readiness Reviews for system testing at Stennis Space Center, Anomaly Resolution Reviews, an Operations Audit, and data analysis. This approach worked well in satisfying the objectives and providing the Project Office with valuable information in real time and through monthly reports. During the month of December 1999 the primary effort involved the participation in anomaly resolution and the detailed review of the data from the final H3 and H4 test series performed on the FASTRAC engine in the b-2 Horizontal Test Facility at Stennis. The more significant findings and recommendations from this review are presented in this report.

Source record↗

NASA Electrified Aircraft Propulsion Efforts

NASA's broad investments in Electrified Aircraft Propulsion (EAP) are reviewed in this paper. NASA investments are guided by an assessment of potential market impacts, technical key performance parameters, and technology readiness attained through a combination of studies, enabling fundamental research, and flight research. NASA has determined that the impact of EAP varies by market and NASA is considering three markets: national/international, on-demand mobility, and short haul regional air transport. Flight research is underway to demonstrate integrated solutions and inform standards and certification processes. This paper focuses on the vehicle related activities, however there are related NASA activities in air space management and vehicle autonomy activities as well as a breakthrough technology project called the Convergent Aeronautics Solutions Project. A key finding is that sufficient technical advances in key areas have been made which indicate EAP is a viable technology for aircraft. Significant progress has been made to reduce EAP adoption barriers and further work is needed to transition the technology to a commercial product and improve the technology so it is applicable to large transonic aircraft. This paper will review the activities of the Hybrid Gas Electric Subproject of the Advanced Air Transport Technology Project, the Revolutionary Vertical Lift Technology Project, and the X-57 Flight Demonstration Project, and discuss the potential EAP benefits for commercial and military applications.

Jansen, Ralph H.↗

Final Report of the NASA Technology Readiness Assessment (TRA) Study Team

The material in this report covers the results on the NASA-wide TRA team, who are responsible for ascertaining the full extent of issues and ambiguities pertaining to TRATRL and to provide recommendations for mitigation. The team worked for approximately 6 months to become knowledgeable on the current TRATRL process and guidance and to derive recommendations for improvement.The team reviewed the TRA processes of other government agencies (OGA), including international agencies, and found that while the high-level processes are similar, the NASA process has a greater level of detail. Finally, NASA’s HQ OCT continues to monitor the GAO’s efforts to produce a TRA Best Practices Guide, a draft of which was received in February 2016. This Guide could impact the recommendations of this report.

Technology readiness assessment↗

A Survey of Titan Balloon Concepts and Technology Status

This paper surveys the options for, and technology status of, balloon vehicles to explore Saturn's moon Titan. A significant amount of Titan balloon concept thinking and technology development has been performed in recent years, particularly following the spectacular results from the descent and landing of the Huygens probe and remote sensing observations by the Cassini spacecraft. There is widespread recognition that a balloon vehicle on the next Titan mission could provide an outstanding and unmatched capability for in situ exploration on a global scale. The rich variety of revealed science targets has combined with a highly favorable Titan flight environment to yield a wide diversity of proposed balloon concepts. The paper presents a conceptual framework for thinking about balloon vehicle design choices and uses it to analyze various Titan options. The result is a list of recommended Titan balloon vehicle concepts that could perform a variety of science missions, along with their projected performance metrics. Recent technology developments for these balloon concepts are discussed to provide context for an assessment of outstanding risk areas and technological maturity. The paper concludes with suggestions for technology investments needed to achieve flight readiness.

balloon↗

An Examination of Materials in Launch Vehicle Propulsion

The primary activities carried out for this effort used Mr. Glasgow's communication skills and materials expertise. He worked closely with both the Space Transportation Project Office and the Materials Division, preparing summaries of the weekly Space Transportation Project Office activities for use by the Materials and the Structures Divisions and for distribution to other portions of the GRC. Mr. Glasgow participated in systems analysis and planning sessions of the Program Office, serving as both a representative of the microtechnologists and as a reviewer of the macrotechnologies involved in proposed new launch vehicles. He helped define the technology readiness level of those new vehicle concepts and provided especially critical expertise to provide realistic technical assessments to various vehicle proponents. While a major portion of his work was performed at the GRC site, travel was required to Langley and to Nashville. In addition to the written contributions mentioned above, he presented summaries of Materials Division activities and interests in industry briefings. Mr. Glasgow continued his interest in the copper-chromium-niobium alloy system, a system originally identified by him as a potential rocket engine material and now chosen as baseline for two new rocket engine designs by the leading US builder of rocket engines.

Source record↗

The Habitable Worlds Observatory Technology Development Plan

The Habitable Worlds Observatory (HWO) is NASA’s next large space telescope, selected by the 2020 Decadal Survey in Astronomy and Astrophysics to search for and characterize habitable exoplanets while enabling a broad range of transformative astrophysics. In August 2024, the HWO Technology Maturation Project Office (TMPO) was formed to begin exploring the HWO science, technology, and mission architectures toward a Mission Concept Review (MCR) at the end of the decade. A primary deliverable of this effort is this technology development plan that identifies critical technologies that enable the mission, defines a process for assessing the readiness of those technologies, and outlines a strategy for developing those technologies to a Technology Readiness Level (TRL) of 5 before the MCR. This document covers technologies organized along three “tracks”: Coronagraph System technologies, Ultra-stable Telescope System technologies, and High-sensitivity Ultraviolet and Visible Instrumentation technologies. Additional emerging and enhancing technologies are also discussed.

technology development↗

The Habitable Worlds Observatory Technology Development Plan

The Habitable Worlds Observatory (HWO) is NASA’s next large space telescope, selected by the 2020 Decadal Survey in Astronomy and Astrophysics to search for and characterize habitable exoplanets while enabling a broad range of transformative astrophysics. In August 2024, the HWO Technology Maturation Project Office (TMPO) was formed to begin exploring the HWO science, technology, and mission architectures toward a Mission Concept Review (MCR) at the end of the decade. A primary deliverable of this effort is a technology development plan that identifies critical technologies that enable the mission, defines a process for assessing the readiness of those technologies, and outlines a strategy for developing those technologies to a Technology Readiness Level (TRL) of 5 before the MCR. In this paper we summarize the HWO technology development plan which comprises three “tracks”: Coronagraph System technologies, Ultra-stable Telescope System technologies, and High-sensitivity Ultraviolet and Visible Instrumentation technologies. Each track has completed an initial assessment of technology gaps, prioritized the gaps for investment, and laid out development roadmaps to mature candidate technologies to close those gaps.

Matthew R Bolcar↗

Independent Reliability Assessment and Progress Review of the NASA GSFC Laser Transmitter for the LISA Program

NASA Goddard Space Flight Center (GSFC) has been actively developing the laser transmitter for the Laser Interferometer Space Antenna (LISA) program since the late 2017. In 2021 we delivered a prototype laser transmitter to the LISA program for performance evaluation as well as performed an independent technology assessment on the laser design supported by the NASA Engineering and Safety Center (NESC). We continued to further develop the LISA laser with a goal of advancing the technology readiness level (TRL) of the laser to 6 by the end of 2023. In this paper, we report on the progress we made on the laser development for the LISA program as well as the technology assessment findings by the NESC.

Independent Reliability Assessment↗

Outer planet atmospheric entry probes - An overview of technology readiness

Entry probe systems for characterizing, by in situ measurements, the atmospheric properties, chemical composition, and cloud structure of the planets Saturn, Uranus, and Jupiter are examined from the standpoint of unique mission requirements, associated subsystem performance, and degree of commonality of design. Past earth entry vehicles (PAET) and current planetary spacecraft (Pioneer Venus probes and Viking lander) are assessed to identify the extent of potential subsystem inheritance, as well as to establish the significant differences, in both form and function, relative to outer planet requirements. Recent research results are presented and reviewed for the most critical probe technology areas, including: science accommodation, telecommunication, and entry heating and thermal protection. Finally presented is a brief discussion of the use of decision analysis techniques for quantifying various probe heat-shield test alternatives and performance risk.

Vojvodich, N. S.↗

Re-Engineering the Mission Operations System (MOS) for the Prime and Extended Mission

One of the most challenging tasks in a space science mission is designing the Mission Operations System (MOS). Whereas the focus of the project is getting the spacecraft built and tested for launch, the mission operations engineers must build a system to carry out the science objectives. The completed MOS design is then formally assessed in the many reviews. Once a mission has completed the reviews, the Mission Operation System (MOS) design has been validated to the Functional Requirements and is ready for operations. The design was built based on heritage processes, new technology, and lessons learned from past experience. Furthermore, our operational concepts must be properly mapped to the mission design and science objectives. However, during the course of implementing the science objective in the operations phase after launch, the MOS experiences an evolutional change to adapt for actual performance characteristics. This drives the re-engineering of the MOS, because the MOS includes the flight and ground segments. Using the Spitzer mission as an example we demonstrate how the MOS design evolved for both the prime and extended mission to enhance the overall efficiency for science return. In our re-engineering process, we ensured that no requirements were violated or mission objectives compromised. In most cases, optimized performance across the MOS, including gains in science return as well as savings in the budget profile was achieved. Finally, we suggest a need to better categorize the Operations Phase (Phase E) in the NASA Life-Cycle Phases of Formulation and Implementation

Extended Mission↗

Ares Project Technology Assessment: Approach and Tools

Technology assessments provide a status of the development maturity of specific technologies. Along with benefit analysis, the risks the project assumes can be quantified. Normally due to budget constraints, the competing technologies are prioritized and decisions are made which ones to fund. A detailed technology development plan is produced for the selected technologies to provide a roadmap to reach the desired maturity by the project s critical design review. Technology assessments can be conducted for both technology only tasks or for product development programs. This paper is primarily biased toward the product development programs. The paper discusses the Ares Project s approach to technology assessment. System benefit analysis, risk assessment, technology prioritization, and technology readiness assessment are addressed. A description of the technology readiness level tool being used is provided.

Hueter, Uwe↗

Assessment of Coated Particle Fuels for Space Nuclear Power and Propulsion Systems: A Report for the NESC Nuclear Power & Propulsion Technical Discipline Team

This study evaluates terrestrial reactor fuel forms, with an emphasis on the coated particle fuel capability under development by interagency reactor programs, for application to space reactor systems of interest to NASA. A comprehensive review of coated particle fuel readiness and qualification status has been performed. Possible derivative fuel forms based on coated particle fuel manufacture technologies are identified and assessed for fission surface power, nuclear electric propulsion, and nuclear thermal propulsion systems. Assessments for terrestrial coated particle and historic fuels were compared for each system allowing for relative risk and common fuel qualification needs to be identified.

Fission Surface Power↗

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously*; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details. * “Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems”, K.A. Polzin, et. al., International Electric Propulsion Conference IEPC 2022, IEPC-2022-155

Nuclear Electric Propulsion↗

Impact of chopping on image quality in the SIRTF telescope

The initial Phase-A concept for the Space Infrared Telescope Facility (SIRTF), which was established in 1981, is concerned with a cryogenically cooled, 85 cm diameter, f/24 Ritchey-Chretien telescope, followed by a Multiple Instrument Chamber (MIC), containing six scientific instruments. In 1982, the Phase-A concept was reviewed with the aim to assess the technical readiness for the next phase of development. Various areas of concern were subsequently investigated in three parallel studies by industry. Two of the arising questions are considered in the present paper, taking into account the system and technology implications of achieving diffraction-limited resolution at 2 microns, and the limitations on the size of the imaging field under this condition. The conducted study takes into account an evaluation of the different methods of chopping. Attention is given to the telescope parameters, symmetric chopping, asymmetrical chopping, focus and alignment errors, the wavefront-error budget, and image quality.

Bottema, M.↗