Ground Testing of a 10 K Sorption Cryocooler Flight Experiment (BETSCE)

The Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE) is a Space Shuttle side-wall-mounted flight experiment designed to demonstrate 10 K sorption cryocooler technology in a space environment. The BETSCE objectives are to: (1) provide a thorough end-to-end characterization and space performance validation of a complete, multistage, automated, closed-cycle hydride sorption cryocooler in the 10 to 30 K temperature range, (2) acquire the quantitative microgravity database required to provide confident engineering design, scaling, and optimization, (3) advance the enabling technologies and resolve integration issues, and (4) provide hardware qualification and safety verification heritage. BETSCE ground tests were the first-ever demonstration of a complete closed-cycle 10 K sorption cryocooler. Test results exceeded functional requirements. This paper summarizes functional and environmental ground test results, planned characterization tests, important development challenges that were overcome, and valuable lessons-learned.

flight experiment↗

Thermal systems design and analysis for a 10 K Sorption Cryocooler flight experiment

The design, analysis and predicted performance of the Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE) is described from a thermal perspective. BETSCE is a shuttle side-wall mounted cryogenic technology demonstration experiment planned for launch in November 1994. BETSCE uses a significant amount of power (about 500 W peak) and the resultant heat must be rejected passively with radiators, as BETSCE has no access to the active cooling capability of the shuttle. It was a major challenge to design and configure the individual hardware assemblies, with their relatively large radiators, to enable them to reject their heat while satisfying numerous severe shuttle-imposed constraints. This paper is a useful case study of a small shuttle payload that needs to reject relatively high heat loads passively in a highly constrained thermal environment. The design approach described is consistent with today's era of 'faster, better, cheaper' small-scale space missions.

Bhandari, Pradeep↗

STS-77 Space Shuttle Mission Report

The STS-77 Space Shuttle Program Mission Report summarizes the Payload activities as well as the: Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME) systems performance during the seventy-seventh flight of the Space Shuttle Program, the fifty-second flight since the return-to-flight, and the eleventh flight of the Orbiter Endeavour (OV-105). STS-77 was also the last flight of OV-105 prior to the vehicle being placed in the Orbiter Maintenance Down Period (OMDP). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-78; three SSME's that were designated as serial numbers 2037, 2040, and 2038 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-080. The RSRM's, designated RSRM-47, were installed in each SRB and the individual RSRM's were designated as 360TO47A for the left SRB, and 360TO47B for the right SRB. The STS-77 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume VII, Appendix E. The requirement stated in that document is that each organizational element supporting the Program will report the results of their hardware (and software) evaluation and mission performance plus identify all related in-flight anomalies. The primary objectives of this flight were to successfully perform the operations necessary to fulfill the requirements of Spacehab-4, the SPARTAN 207/inflatable Antenna Experiment (IAE), and the Technology Experiments Advancing Missions in Space (TEAMS) payload. Secondary objectives of this flight were to perform the experiments of the Aquatic Research Facility (ARF), Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE), Biological Research in Canisters (BRIC), Get-Away-Special (GAS), and GAS Bridge Assembly (GBA). The STS-77 mission was planned as a 9-day flight plus 1 day, plus 2 contingency days, which were available for weather avoidance or Orbiter contingency operations. The sequence of events for the STS-77 mission is shown in Table 1, and the Space Shuttle Vehicle Management Office Problem Tracking List is shown in Table 11. The Government Fumished Equipment/Flight Crew Equipment (GFE/FCE) Problem Tracking List is shown in Table II. Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (G.m.t.) and mission elapsed time (MET). The six-person crew for STS-77 consisted of John H. Casper, Col., U. S. Air Force, Commander; Curtis L. Brown, Jr., Lt. Col., U. S. Air Force, Pilot; Andrew S. W. Thomas, Civilian, Ph.D., Mission Specialist 1; Daniel W. Bursch, CDR., U. S. Navy, Mission Specialist 2; Mario Runco, Jr., Civilian, Mission Specialist 3; and Marc Gameau, Civilian, PhD, Mission Specialist 4.

Fricke, Robert W., Jr.↗

Post-Flight Analysis of a 10K Sorption Cryocooler

In May 1996, the Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE) was flown aboard the Space Shuttle flight STS-77 in the first space-flight demonstration of chemisorption cryocooler technology. While on orbit, BETSCE successfully met its science objectives of cooling from 70 K to 10 K in less than two minutes, sustaining a 100 mW heat load below 11 K for over then minutes, and demonstrating recycle times of approximately eleven hours.

sorption crycooler chemisorption cryocooler↗

Dynamic Simulation of a Periodic 10 K Sorption Cryocooler

A transient thermal simulation model has been developed to simulate the dynamic performance of a multiple-stage 10 K sorption cryocooler for spacecraft sensor cooling applications that require periodic quick-cooldown (under 2 minutes) , negligible vibration, low power consumption, and long life (5 to 10 years). The model was specifically designed to represent the Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE), but it can be adapted to represent other sorption cryocooler systems as well. The model simulates the heat transfer, mass transfer, and thermodynamic processes in the cryostat and the sorbent beds for the entire refrigeration cycle, and includes the transient effects of variable hydrogen supply pressures due to expansion and overflow of hydrogen during the cooldown operation. The paper describes model limitations and simplifying assumptions, with estimates of errors induced by them, and presents comparisons of performance predictions with ground experiments. An important benefit of the model is its ability to predict performance sensitivities to variations of key design and operational parameters. The insights thus obtained are expected to lead to higher efficiencies and lower weights for future designs.

cryocooler design performance sorption simulation ↗