Search NASASearch

SEARCH · Search NASA

Results for “Testing and Performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Bias and spread in EVT performance tests.

Performance tests (error probability measurements) of communications systems characterized by low bit rates and high reliability requirements frequently utilize classical extreme value theory (EVT) to avoid the excessive test times encountered with bit error rate (BER) tests. If the underlying noise is Gaussian or perturbed Gaussian, the EVT error estimates have either excessive bias or excessive variance if an insufficient number of test samples is used. EVT is examined to explain the cause of this bias and spread. Experimental verification is made by testing a known Gaussian source, and procedures that minimize these effects are described. It seems apparent that even under the best of conditions the EVT test results are not particularly better than those of BER tests.

Smith, J. G.

Study of NSI and related cable performance during tests performed in the NASA Hot Gas Facility

Some seven different configurations of the NSI and other cables were tested in the NASA-MSFC Hot Gas Facility (HGF). The tests were conducted to study what happens to the cables when they are exposed to hot flow as was the case in the first two Shuttle flights, the STS-1 and STS-2. Protection of these components is vital for various functions especially to attain proper nozzle separation. The tests in the HGF demonstrated the severity of the aerodynamic forces combined with aero heating environment on the test cables and helped, in general, to evaluate the cable wrap materials and cable mounting hardware and technique. Blastape 2 cable wrap which is adequate for thermal protection of the cables must be properly clamped at its ends. The nylon clamps (or ties) used to secure cables to metal components inside the skirt could not withstand the heating. K5NA closeout material used on the outboard surface of the aft skirt when troweled over the cables performed excellently in protecting the cables and mounting hardware.

Karu, Z. S.

Performance testing of a Transit generator at JPL.

A Transit type thermoelectric generator, serial number QM-III, assembled with lightweight Isotec type thermoelectric panels, has been placed on test at the Jet Propulsion Laboratory. In its exterior appearance and main constructive features, generator QM-III is similar to the generator which was flown on the Transit satellite, launched into circular polar orbit on Sept. 2, 1972. The main difference between the flight generator and QM-III is that the flight hardware is heated by radioisotope decay, while QM-III is an ETG and is assembled with three different types of thermoelectric panels. The paper describes the generator and test equipment used and presents the results of the tests performed to date.

Rouklove, P.

Life sciences passive GN2 freezer thermal performance test

Thermal performance tests that were conducted on the life sciences passive GN2 freezer project are summarized as well as the improvements to the freezers to improve the thermal performance of the containers. Procedures were developed, based upon these tests, to initially charge the freezers with LN2 and verify that the freezer performance is adequate for the mission duration. Improvements were made to the corvac sample tube to limit the amount of breakage due to thermal expansion of the liquid during freezing. A method of verifying the freezer vacuum insulative integrity was defined as well as a procedure for refurbishment of the internal vacuum level. Freezer modifications were made to ease the reevacuation of the containers. The orientation of the freezer in a 1-G environment, after being charged, had to remain in a vertical position. The LN2 boiloff rate increased significantly in a horizontal position. This resulted in a stowage definition in the spacecraft prior to launch. Functional testing, using the SL-1 mission timeline showed that the freezer will maintain samples in the frozen state for the duration of the mission.

Belshaw, G. W.

Performance Testing of Lithium Li-ion Cells and Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(super 0)C to +40(super 0)C), withstand long storage periods (e.g., including pre-launch and cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the inability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The primary focus of this paper is to communicate the latest results regarding Mars surface operation mission simulation testing, as well as, the corresponding performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by Yardney Technical Products, Inc.) have been demonstrated to far exceed the requirements defined by the mission, being able to support the operation of the rovers for over three years, and are projected to support an even further extended mission.

low temperature electrolytes

Fabrication and test of a space power boiler feed electromagnetic pump. Part 2: Test facility and performance test

A three-phase helical induction electromagnetic pump, designed for the boiler-feed pump of a potassium Rankine-cycle space power system, was built and tested. The pump was tested over a range of potassium temperatures from 900 to 1400 F, flow rates from 0.75 to 4.85 lb/sec, developed pressures up to 340 psi, net positive suction heads (NPSH) from 1 to 22 psi, and NaK coolant temperatures from 800 to 950 F. The maximum efficiency at the pump design point of 3.25 lb/sec flow rate, 240 psi developed pressure, 1000 F potassium inlet temperature, and 800 F NaK coolant temperature was 16.3 percent. The tests also showed successful operation of the pump at an NPSH as low as 1.5 psi without cavitating.

Powell, A. H.

GPM Avionics Module Heat Pipes Design and Performance Test Results

The Global Precipitation Measurement (GPM) mission is an international network of satellites that provide the next-generation global observations of rain and snow. The GPM core satellite carries an advanced radar / radiometer system to measure precipitation from space and serve as a reference standard to unify precipitation measurements from a constellation of research and operational satellites. Through improved measurements of precipitation globally, the GPM mission will help to advance our understanding of Earth's water and energy cycle, improve forecasting of extreme events that cause natural hazards and disasters, and extend current capabilities in using accurate and timely information of precipitation to directly benefit society. The avionics module on the core satellite contains a number of electronics boxes which are cooled by a network of aluminum/ammonia heat pipes and a honeycomb radiator which contains thirteen embedded aluminum/ammonia heat pipes. All heat pipes were individually tested by the vendor (Advanced Cooling Technologies, Inc.) prior to delivery. Following delivery to NASA, the flight avionics radiator and the flight spare transport heat pipes were mounted to flight-like test structure and a system level thermal vacuum test was performed. This test, which used simulators in place of all electronics boxes, was done to verify the operation of the thermal control system as a whole. This presentation will discuss the design of the avionics module heat pipes, and then discuss performance tests results for the individual heat pipes prior to delivery and for the system level thermal vacuum test. All heat pipes met their performance requirements. However, it was found that the power was too low in some instances to start all of the smaller radiator spreader heat pipes when they were tested in a reflux configuration (which is the nominal test configuration). Although this lowered the efficiency of the radiator somewhat, it did not impact the operating temperatures of the electronics boxes.

Ottenstein, Laura

The DOE ETV-1 Electric Test Vehicle. Phase 3: Performance Testing and system evaluation

Engineering tests were conducted in order to characterize overall system performance and component efficiencies within the system environment. A dynamometer was used in order to minimize the ambient effects and large uncertainties present in track testing. Extensive test requirements were defined and procedures were carefully controlled in order to maintain a high degree of credibility. Limited track testing was performed in order to corroborate the dynamometer results. Test results include an energy flow analysis through the major subsystems and incorporate the aerodynamic and rolling losses under cyclic and various steady speed conditions. The major output from all relevant dynamometer and track tests is also included.

Kurtz, D.

Liquid solar collector-performance tests

Report describes comprehensive performances test on commercially-available modular nonmetallic single-glazed liquid solar collector to verify compliance with U. S. Housing and Urban Development Department standards for thermal stability. Program includes tests of initial thermal performance, 30 day stagnation, and final external performance.

Source record

A review of cryogenic testing performed by the thermochemical test branch, Manned Spacecraft Center in support of Apollo 13 and14

The Apollo 13 anomaly provided considerable impetus for a variety of types of cryogenic and ignition tests. The logic of the various test program designs, the test techniques, and their final impact upon the investigation findings are described. In addition, several test programs initiated to determine the thermal performance and general performance characteristics of the redesigned Apollo 14 cryogenic storage system are presented.

Propp, C. E.

Advanced Stirling Convertor (ASC-E2) Performance Testing at NASA Glenn Research Center

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG Project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, four pairs of ASCs capable of operating to 850 C and designated with the model number ASC-E2, were delivered by Sunpower of Athens, OH, to GRC in 2010. The ASC-E2s underwent a series of tests that included workmanship vibration testing, performance mapping, and extended operation. Workmanship vibration testing was performed following fabrication of each convertor to verify proper hardware build. Performance mapping consisted of operating each convertor at various conditions representing the range expected during a mission. Included were conditions representing beginning-of-mission (BOM), end-of-mission (EOM), and fueling. This same series of tests was performed by Sunpower prior to ASC-E2 delivery. The data generated during the GRC test were compared to performance before delivery. Extended operation consisted of a 500-hour period of operation with conditions maintained at the BOM point. This was performed to demonstrate steady convertor performance following performance mapping. Following this initial 500-hour period, the ASC-E2s will continue extended operation, controller development and special durability testing, during which the goal is to accumulate tens of thousands of hours of operation. Data collected during extended operation will support reliability analysis. Performance data from these tests is summarized in this paper.

Oriti, Salvatore

Advanced Stirling Convertor (ASC-E2) Performance Testing at NASA Glenn Research Center

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG Project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, four pairs of ASCs capable of operating to 850 C and designated with the model number ASC-E2, were delivered by Sunpower of Athens, Ohio, to GRC in 2010. The ASC-E2s underwent a series of tests that included workmanship vibration testing, performance mapping, and extended operation. Workmanship vibration testing was performed following fabrication of each convertor to verify proper hardware build. Performance mapping consisted of operating each convertor at various conditions representing the range expected during a mission. Included were conditions representing beginning-of-mission (BOM), end-of-mission (EOM), and fueling. This same series of tests was performed by Sunpower prior to ASC-E2 delivery. The data generated during the GRC test were compared to performance before delivery. Extended operation consisted of a 500-hr period of operation with conditions maintained at the BOM point. This was performed to demonstrate steady convertor performance following performance mapping. Following this initial 500-hr period, the ASC-E2s will continue extended operation, controller development and special durability testing, during which the goal is to accumulate tens of thousands of hours of operation. Data collected during extended operation will support reliability analysis. Performance data from these tests is summarized in this paper.

Oriti, Salvatore

On-Orbit Constraints Test - Performing Pre-Flight Tests with Flight Hardware, Astronauts and Ground Support Equipment to Assure On-Orbit Success

On-Orbit Constraints Test (OOCT's) refers to mating flight hardware together on the ground before they will be mated on-orbit. The concept seems simple but it can be difficult to perform operations like this on the ground when the flight hardware is being designed to be mated on-orbit in a zero-g and/or vacuum environment of space. Also some of the items are manufactured years apart so how are mating tasks performed on these components if one piece is on-orbit before its mating piece is planned to be built. Both the Internal Vehicular Activity (IVA) and Extra-Vehicular Activity (EVA) OOCT's performed at Kennedy Space Center will be presented in this paper. Details include how OOCT's should mimic on-orbit operational scenarios, a series of photographs will be shown that were taken during OOCT's performed on International Space Station (ISS) flight elements, lessons learned as a result of the OOCT's will be presented and the paper will conclude with possible applications to Moon and Mars Surface operations planned for the Constellation Program.

Haddad, Michael E.

Performance testing of the Galileo attitude control system

Performance testing plans, procedures, and initial results for the Galileo Attitude and Articulation Control Subsystem are described. The objectives of performance testing include test bed comparisons, examining the interactions between spacecraft dynamics and controllers, and verifying the ability to tune control algorithms in flight to meet specific performance requirements. Two primary test beds are described. One, the Integration Test Laboratory, drives actual flight hardware components and support equipment with a real time computer simulation of spacecraft dynamics. The other, the Functional Simulator, is a nonreal time computer simulation with high fidelity spacecraft dynamics, including flexible appendages, fuel slosh, and simulated hardware components. Initial Functional Simulator results are presented which illustrate spacecraft response to open loop spin-up and turn commands. A closed loop sun acquisition turn is also demonstrated. Future tests for verifying performance of attitude determination, spacecraft control, and scan platform pointing functions are outlined.

Bell, C. E.

Model-Scale Aerodynamic Performance Testing of Proposed Modifications to the NASA Langley Low Speed Aeroacoustic Wind Tunnel

Tests were performed on a 1/20th-scale model of the Low Speed Aeroacoustic Wind Tunnel to determine the performance effects of insertion of acoustic baffles in the tunnel inlet, replacement of the existing collector with a new collector design in the open jet test section, and addition of flow splitters to the acoustic baffle section downstream of the test section. As expected, the inlet baffles caused a reduction in facility performance. About half of the performance loss was recovered by addition the flow splitters to the downstream baffles. All collectors tested reduced facility performance. However, test chamber recirculation flow was reduced by the new collector designs and shielding of some of the microphones was reduced owing to the smaller size of the new collector. Overall performance loss in the facility is expected to be a 5 percent top flow speed reduction, but the facility will meet OSHA limits for external noise levels and recirculation in the test section will be reduced.

Booth, Earl R., Jr.

DSN system performance test software

The system performance test software is currently being modified to include additional capabilities and enhancements. Additional software programs are currently being developed for the Command Store and Forward System and the Automatic Total Recall System. The test executive is the main program. It controls the input and output of the individual test programs by routing data blocks and operator directives to those programs. It also processes data block dump requests from the operator.

Martin, M.

Solar-heating system-performance tests

Report describes comprehensive performance tests of complete solar powered space and hot water heating system to verify its suitability for field installation in small single family dwellings.

Source record