Search NASA⌕ Search

SEARCH · Search NASA

Results for “Thermal Power Dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Reduced-Order Model of a Nuclear Power Plant with Thermal Power Dispatch

This paper presents reduced-order modeling of thermal power dispatch (TPD) from a pressurized water reactor (PWR) for providing heat to nearby heat consuming industrial processes that seek to take advantage of nuclear heat to reduce carbon emissions. The reactor model includes the neutronics of the reactor core, thermal–hydraulics of the primary coolant cycle, and a three-lump model of the steam generator (SG). The secondary coolant cycle is represented with quasi-steady state mass and energy balance equations. The secondary cycle consists of a steam extraction system, high-pressure and low-pressure turbines, moisture separator and reheater, high-pressure and low-pressure feedwater heaters, deaerator, feedwater and condensate pumps, and a condenser. The steam produced by the SG is distributed between the turbines and the extraction steam line (XSL) that delivers steam to nearby industrial processes, such as production of clean hydrogen. The reduced-order simulator is verified by comparing predictions with results from separate validated steady-state and transient full-scope PWR simulators for TPD levels between 0% and 70% of the rated reactor power. All simulators indicate that the flow rate of steam in the main steam line and turbine systems decrease with increasing TPD, which causes a reduction in PWR electric power generation. The results are analyzed to assess the impact of TPD on system efficiency and feedwater flow control. Due to the simplicity of the proposed reduced-order model, it can be scaled to represent a PWR of any size with a few parametric changes. In the future, the proposed reduced-order model will be integrated into a power system model in a digital real-time simulator (DRTS) and physical hardware-in-the-loop simulations.

08 HYDROGEN↗

Early-stage Testing of Thermal Power Dispatch Simulator for Subjective Mental Workload and Evolution Time

The excess thermal energy produced by nuclear power plants (NPPs) during low electricity demands can be utilized in industrial processes, such as hydrogen production, through a thermal power dispatch (TPD) system. Initial testing of the first iteration of a single-train TPD design with a manual control mode at the Idaho National Lab (INL) revealed a high operator workload and degraded control capability. The current study evaluated the impact of an enhanced dual-train TPD design on operators’ subjective mental workload and evolution task-time while completing two operating scenarios in manual and automatic control modes. The results showed no statistically significant difference between participants’ mental workload using both control modes. Evolution time in automatic control mode took a shorter time than in manual control, with participants completing all evolutions in less than the 10-min set as the design specification limit. The shorter evolution time is discussed within the context of plant safety and operational efficiency.

Gideon, Olugbenga↗

System design and analysis of thermal power dispatch systems for boiling water reactors

Nuclear power plants are crucial to meeting net zero emission goals and achieving energy sustainability. Integrating these plants with clean energy technologies such as high-temperature steam electrolysis (HTSE) may improve the efficiency and economic competitiveness of these plants. Here, the current study investigates the design and operation of a thermal power dispatch (TPD) system for coupling boiling water reactors (BWRs) to HTSE plants. The TPD system extracts a portion of the steam from the reactor’s main steam line and transfers its thermal energy to an HTSE plant through a power transport loop. A TPD system for 5 % steam extraction has been designed and the system performance during steady and transient operations has been analyzed. The TPD system dispatched a total of 197 MW thermal energy to the HTSE plant under nominal design conditions. Saturated steam at 7.17 MPa from the BWR plant was condensed and subcooled to a temperature of 168 °C, while a mass flow rate of 91.1 kg/s of superheated steam was dispatched to the HTSE plant. Furthermore, the system performance during transient operation showed a continuous transition from the initial hot standby mode to the nominal power dispatch level. The transient simulation results emphasized the importance of investigating component level performance for the TPD system design. The current results will guide future works on the development of integrated energy systems for hydrogen production or process heat applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advancements in Development and Testing of Thermal Power Dispatch Simulators

Flexible plant operations and generation (FPOG) offer nuclear power plants (NPPs) the chance to leverage alternative, non-electric revenue streams while ensuring their continued role as reliable, clean, and constant sources of baseload electrical power. The excess thermal energy generated from NPPs during periods of low electricity demand can be channeled as raw materials to numerous industrial processes via a thermal power dispatch (TPD) system. Hydrogen production via high-temperature steam electrolysis (HTSE) is an optimal use case based on technical and economic feasibility. Researchers at Idaho National Laboratory (INL) have conducted previous works that developed and implemented TPD system models within the GSE Solutions Generic Pressurized Water Reactor (GPWR) simulator to support human-in-the-loop (HITL) scenario-based evaluations. The first part of this report documents modifications made to the GPWR TPD model and HMI from the previous iteration in line with a new Sargent and Lundy (S&L) TPD design with an automatic control system. The was done in collaboration with Westinghouse using their three-loop pressurizer water reactor (W3LPWR) simulator which contains an industrial grade automatic control system for the TPD. This was installed in the Human Systems Simulation Laboratory (HSSL) at INL. The second part of the report documents findings from an all-hands-on-deck integration and verification workshop that was conducted in the HSSL over several days. The research team comprised INL human factors and TPD experts, a nuclear engineer from GSE Solutions who implemented the revised TPD model for GPWR, the human-machine interface (HMI) prototyping and human factors team from the University of Idaho, and personnel with operations experience with pressurized water reactors. The workshop provided time and expertise to conduct the final activities to bring the operations, HMI, and simulator into a functional state. The goals of the integration and verification workshop were: 1. to install the revised GPWR TPD model into the HSSL 2. verify the TPD HMI prototype was functional 3. integrate the HTSE Simulink model to GPWR. 3. Issues were identified for resolution, but overall the workshop accomplished its goal to integrated and verify the majority of the intended functional. Future work will resolve the identified issues and use the integrated simulation to support an evaluation and demonstration in the next fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Tale of Two Simulators—A Comparative Human-in-the-Loop Nuclear Power Plant Operations Study on Thermal Power Dispatch for Hydrogen Production

A study was designed for a reconfigurable, full-scale, full-scope nuclear power plant control room simulator to compare two different thermal power dispatch systems, on separate simulator platforms, demonstrating a TPD concept of operation. A TPD system can provide a desirable alternative revenue source for utilities but requires addressing new and unique operational issues. The selection of representative scenarios and the scenario-based experimental design are presented as key elements to capture evidence for validating the developed TPD concept of operations overcome these operational issues.

Ulrich, Thomas A.↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

A Rapid Procedure Development Approach for Multi-stage Validation of Novel Nuclear Power Plant Systems

The integration of renewable energy sources into the modern grid introduces variability in generation, challenging nuclear reactors to remain economically viable amid low wholesale electricity prices. To address this, Idaho National Laboratory?s Flexible Plant Operation and Generation program explores alternative revenue streams, including commoditizing excess thermal energy. A Thermal Power Dispatch (TPD) system enables steam extraction from the secondary loop for industrial uses like hydrogen production via high-temperature steam electrolysis.

99 - GENERAL AND MISCELLANEOUS↗

Preliminary Evaluation of Joint Electricity-Hydrogen Concept of Operations

An initial thermal power dispatch (TPD) concept of operations was evaluated that couples a nuclear power plant to a nearby hydrogen production plant. GSE Systems’ generic pressurized water reactor full-scope simulator was modified with a TPD model comprised of a thermal power extraction and delivery system. A prototype human-system interface (HSI) was developed to interact with the TPD model and allow participants to execute the basic operating scenarios for normal operations. Four retired operators performed the evaluation, and due to COVID-19 travel restrictions, the original in-person experimental design was restructured to support a remote participator evaluation using a web meeting platform. Data from operator feedback, observations from the research team, and quantitative survey responses revealed that the initial TPD concept of operations is feasible. The operators were comfortable with the engineered system and HSI and could manage it without adverse impacts to reactor power, plant safety, or equipment. Findings are discussed in terms of both the TPD system design and HSI performance.

human factors↗

Demonstration of a multi-channel fluidized bed particle–supercritical carbon dioxide heat exchanger for concentrating solar applications

High-temperature thermal energy storage in oxide particles at temperatures above 600°C can couple concentrated solar energy with high-efficiency thermal power cycles to provide dispatchable solar-driven electricity. Challenges remain in developing cost-effective primary heat exchangers, which require expensive alloys, to extract the high-temperature thermal energy from the particles to power cycle fluids, such as supercritical CO 2 (sCO 2 ) in recuperated Brayton cycles. To explore one pathway for cost-effective, high-temperature particle heat exchangers, the current study demonstrates a shell-and-plate, particle–sCO 2 heat exchanger with narrow- channel fluidized beds coupled with micro-channel sCO 2 flows in the heat exchanger walls. This study evaluates the feasibility of multiple parallel, narrow-channel fluidized beds in shell-and-plate particle–sCO 2 HXs, to achieve high bed-wall heat fluxes at elevated temperatures. A reduced-order model simulates the narrow- channel, fluidized-bed particle–sCO 2 heat exchanger to design the fluidized bed geometry, in terms of depth, height, and number of channels,for a nominal 40-kWth heat exchanger at particle and sCO 2 inlet temperatures up to 600 °C and 400 °C respectively. The resulting shell-and-plate heat exchanger design operates with bubbling fluidization of the downward-flowing oxide particles to enhance bed-wall heat transfer. The heat exchanger core is fabricated with etched sCO 2 micro-channels in thin wall plates that are diffusion bonded to spacer frames to form the shell-and-plate structure with 12 parallel, fluidized bed channels, 10.4 mm deep. The heat exchanger is tested at the National Solar Thermal Test Facility at Sandia National Laboratories with CARBOBEAD HSP particles at design particle flow rates of 0.20 kg s –1 and inlet temperatures up to 525 °C. Results show that fluidization across multiple parallel channel beds can maintain uniform particle inventory with a common freeboard zone above the heat exchanger core. Bubbling fluidization improves particle–wall heat transfer coefficients but also increases axial dispersion of particle thermal energy, which lowers the log- mean temperature difference such that total heat transfer remains relatively constant to within ±10% over a broad range of fluidization gas velocities. The axial dispersion required particle and sCO 2 flow rates to be increased by 25% over model-designed conditions to achieve the targeted 40 kWth, which indicates the importance of incorporating axial dispersion into heat exchanger design models and of deploying bed structures to suppress it. Furthermore, this study demonstrates the feasibility and preferred fluidizing gas conditions for particle heat exchangers for releasing high-temperature thermal energy storage systems.

14 SOLAR ENERGY↗

Deep reinforcement learning based optimization for a tightly coupled nuclear renewable integrated energy system

New ways to integrate energy systems to maximize efficiency are being sought to meet carbon emissions goals. Nuclear-renewable integrated energy system (NR-IES) concepts are a leading solution that couples a nuclear power plant with renewable energy, hydrogen generation plants, and energy storage systems, such that thermal and electrical power are dispatchable to fulfill grid-flexibility requirements while also producing hydrogen and maximizing revenue. Here, this paper introduces a deep reinforcement learning (DRL)-based framework to address the complex decision-making tasks for NR-IES. The objective is to maximize revenue by generating and selling hydrogen and electricity simultaneously according to their time-varying prices while keeping the energy flow in the subsystems in balance. A Python-based simulator for a NR-IES concept has been developed to integrate with OpenAI Gym and Ray/RLlib to enable an efficient and flexible computational framework for DRL research and development. Three state-of-the-art DRL algorithms have been investigated, including two-delayed deep deterministic policy gradient (TD3), soft-actor critic (SAC), proximal policy optimization (PPO), to illustrate DRL’s superiority for controlling NR-IES by comparing it with a conventional control approach, particle swarm optimization (PSO). In this effort, PPO has shown more-stable performance and also better generalization capability than SAC and TD3. Comparisons with PSO have demonstrated that, on average, PPO can achieve 13.9% more mean episode returns from the training process and 29.4% more mean episode returns from the testing process when different hydrogen-production targets are applied.

08 HYDROGEN↗

Advancing Concentrating Solar Thermal Modeling Using System Advisor Model (SAM)

Concentrating solar thermal (CST) technologies play a critical role in enabling dispatchable power and high-temperature industrial heat applications. Accurate and flexible modeling tools are essential for evaluating system performance, guiding technology research and development, and informing investment decisions. The National Laboratory of the Rockies's System Advisor Model (SAM) is a widely used techno-economic simulation platform for CST systems, providing detailed performance and financial modeling capabilities for multiple CST system configurations. SAM integrates physics-based performance models with financial analysis to simulate the behavior of complex energy systems under realistic operating conditions. For CST technologies (including tower, parabolic trough, and linear Fresnel), SAM enables hourly simulations using site-specific weather data that ensure feasible operating conditions and convergence of mass and energy between core system components (i.e., solar field, receiver, thermal energy storage, and power cycle). These capabilities allow researchers and developers to evaluate annual energy production, capacity factors, levelized cost of energy (LCOE), and system dispatch strategies. A key advantage of SAM lies in its flexibility for parametric analysis and large-scale computational studies. Users can vary system design parameters such as heliostat field layout, receiver dimensions, thermal energy storage capacity, power block sizing, and installation cost assumptions to investigate their impact on system performance and financial metrics. When combined with automated scripting through LK, SDKTool, or Python interfaces, SAM enables high-throughput simulation workflows that support sensitivity analysis, technology benchmarking, and optimization studies. These approaches are particularly valuable for next-generation CST concepts, where design spaces are large and system interactions are complex. Another important capability of SAM is its support for dispatch optimization and thermal energy storage modeling, which are central to the value proposition of CST technologies. The ability to simulate integrated storage and flexible power generation allows researchers to explore strategies that maximize grid value, improve capacity utilization, and enhance integration with variable resources such as photovoltaic and wind generation. This poster will present an overview of SAM's thermal system modeling capabilities including concentrating solar. Additionally, we will highlight new feature developments including: 1) implementing Google's OR-Tools optimization platform for faster and more robust dispatch optimization, 2) developing a new power load following controller for modeling behind-the-meter applications, 3) enabling direct modeling of CSP-PV hybrid systems with the inclusion of battery storage, and 4) developing a multi-receiver falling particle Gen3 system model.

14 SOLAR ENERGY↗

Research Highlight - Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

We highlight our work from our previous publication titled "Dispatch Optimization, System Design, and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage" published in MDPI Energies 2022 (doi.org/10.3390/en15103599). Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

97 MATHEMATICS AND COMPUTING↗

Preconceptual Designs of Coupled Power Delivery between a 4-Loop PWR and 100-500 MWe HTSE Plants

This study develops a preconceptual design for the integration between a large-scale high-temperature electrolysis facility and a NPP. Two hydrogen facility sizes are considered: 100 MWnom and 500 MWnom. Both steam supply designs use cold reheat steam extraction as a heat source. A reboiler inside the protected area of the power plant transfers steam heat to the demineralized water supply for the hydrogen plant. After the heat transfer, the extracted steam condenses and returns to the condenser while the process steam routes out of the protected area to the electrolyzers. Electrical power is tapped off from the high voltage side of the GSU transformer, where it is then transported via a 345-kV transmission line to the hydrogen facility. Circuit breakers and disconnects are located at both ends of the transmission line. Step down transformers and miscellaneous switchgear/buses are located at the end of the transmission line inside the HTEF boundary. Control capabilities for the steam interfacing equipment and electrical dispatch are accessible from the Main Control Room, and protective relays for the transmission line are located inside the Relay Room. Computer modeling was performed for the thermal and electrical designs. PEPSE analysis provided the steady-state parameters for thermal extraction from the turbine cycle. These parameters were used to inform transients and size equipment in combination with Applied Flow Technology (AFT) Arrow and AFT Fathom modeling for steam and water piping, respectively. Electrical transients were analyzed using PSCAD. An ETAP model was used to evaluate power flow and short circuit, which enabled the sizing of transformers and protective equipment. A cost estimate was developed for both integration designs when considering plant separation distances of 250 m and 500 m. From these estimates, the modifications for thermal and electrical interfacing of a first-of-a-kind nuclear-integrated hydrogen facility are anticipated to cost between $60–250/kWnom., where the subscript “nom” refers to the nominal size of the hydrogen plant. On a thermal power basis, the thermal power has a cost of approximately $8/MWth for a 500 MWnom high temperature electrolysis plant located 500 m distant from the NPP. That value decreases to approximately $7.5/MWth for a 250 m separation distance between the hydrogen plant and the NPP. This value is lower than previous estimates of the cost of heat extracted from NPPs primarily because in this work the steam is extracted from cold reheat instead of the main steam line, which reduces the cost of the dispatched steam by approximately $3.5/MWth. Nuclear steam extraction can provide a profit avenue for many plants and is not restricted to hydrogen production. Ammonia production, oil refining, and paper production, among other industrial processes all require thermal energy, which can be provided by NPPs. Future work should look further at the details of thermal extraction for a variety of use cases. This can include increased levels of extraction and multiple simultaneous users. Additionally, site-specific studies should be performed to develop industry experience and improve cost accuracy.

08 HYDROGEN↗

Dispatch optimization of electric thermal energy storage within System Advisor Model

A stand-alone electric thermal energy storage (ETES) system converts low-value electricity into heat using resistance heating elements. During periods of high-value electricity, an ETES system uses a thermodynamic power cycle to convert stored thermal energy back to electricity. These dispatchable systems derive value from their ability to store energy when prices are low and generate electricity when prices are favorable, i.e., energy arbitrage. Consequently, dispatch optimization of system operations, through maximizing revenue subject to system constraints, is essential to evaluate the economic value of a particular system design. While stand-alone ETES systems offer potential advantages as dispatchable grid storage technologies, there is a lack of a neutral third-party, publicly available, open-source model to evaluate the performance, dispatch, and financial viability of these systems. To address this problem, we have developed a techno-economic model for stand-alone ETES systems, within National Renewable Energy Laboratory's (NREL's) System Advisor Model (SAM). We implement a mixed-integer linear program to determine an ETES optimal operating schedule that maximizes electricity sales less maintenance costs caused by operation and cycling given temporal-varying grid electricity prices. Our contributions include a mixed-integer linear program for energy arbitrage of an ETES system, an ETES performance model through a publicly-available software (i.e., SAM), and an exercise of our model through case studies that compare ETES operational strategies and annual financial metrics. With our dispatch optimization model, we were able to improve revenue by 20% compared to a myopic heuristic while reducing the operational cost of the ETES system through decreases in cycle starts, cycles per day, and heater starts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance analysis of integrated Nuclear-Solar Energy system sharing same molten salt thermal energy storage

Advanced nuclear reactors may be deployed with integrated thermal energy storage to improve flexibility and maximize revenue. This presents opportunities for thermal integration with concentrating solar power (CSP) to generate component synergies and/or improve performance. Here in this study, a computational model is developed for an integrated nuclear and CSP system that both share the same molten salt thermal energy storage (TES). Optimized dispatch schedules are developed subject to various market conditions, and the ratio of the nuclear to CSP thermal output is also varied. Performance of the combined system is compared to separate nuclear and solar plants, to determine if there is an overall benefit that can be derived from sharing the TES. Given sufficient volatility in electricity prices (e.g., under CAISO market conditions), synergies of up to 8% in net revenue are observed as a result of sharing the same TES, primarily due to improved revenue from enabling operation of the turbine closer to its design point, as well as being able to better take advantage of higher electricity prices. The synergy benefits are largest when the nuclear and solar plants have similar thermal output. However, when prices are less volatile the opposite behavior can be observed and it can be preferable to operate the nuclear plant as a baseload generator.

14 SOLAR ENERGY↗

System and Component Development of Particle-Based Pumped Thermal Energy Storage

Reliable power supply from variable renewable resources requires energy storage at various scales to overcome resource intermittency. Long-duration energy storage (LDES, 10-100 hours) can improve dispatchability and grid reliability with increasing levels of renewable power supply. Thermal energy storage (TES) has siting flexibility and the ability to store a large capacity of energy, and thus has the potential to meet the LDES need and provide charging and discharging durations beyond the economic capacity of conventional batteries. TES technology has evolved from concentrating solar thermal power (CSP) generation and is recognized as an economic large-scale energy storage method. A standalone electric-thermal energy storage system supporting renewable integration of wind and solar power without CSP solar field can firm renewable generation and boost overall grid resilience and security.

concentrating solar thermal power↗