Search NASASearch

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC

The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Machine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS

Interconnection Timelines and Costs for Distributed Energy Projects in the United States (2000-2025)

These slides summarize and explain empirical data on interconnection timelines and costs for distributed energy projects connected to U.S. utility distribution systems. The study explores how interconnection metrics vary across states, project sizes, technology types, and over time to indicate progress toward simple, fast, and affordable interconnection. Data encompasses 188 utilities in 24 states. Project types include biomass/biofuels, coal, hydropower, natural gas/oil, solar, storage, wind, hybrid, and

Chelminski, Kathryn

Century-long timelines of herbarium genomes predict plant stomatal response to climate change

Abstract Dissecting plant responses to the environment is key to understanding whether and how plants adapt to anthropogenic climate change. Stomata, plants’ pores for gas exchange, are expected to decrease in density following increased CO 2 concentrations, a trend already observed in multiple plant species. However, it is unclear whether such responses are based on genetic changes and evolutionary adaptation. Here we make use of extensive knowledge of 43 genes in the stomatal development pathway and newly generated genome information of 191 Arabidopsis thaliana historical herbarium specimens collected over 193 years to directly link genetic variation with climate change. While we find that the essential transcription factors SPCH, MUTE and FAMA, central to stomatal development, are under strong evolutionary constraints, several regulators of stomatal development show signs of local adaptation in contemporary samples from different geographic regions. We then develop a functional score based on known effects of gene knock-out on stomatal development that recovers a classic pattern of stomatal density decrease over the past centuries, suggesting a genetic component contributing to this change. This approach combining historical genomics with functional experimental knowledge could allow further investigations of how different, even in historical samples unmeasurable, cellular plant phenotypes may have already responded to climate change through adaptive evolution.

Environmental Sciences & Ecology

A VSC-HVDC-Assisted Black-Start Strategy in Bulk Power Systems a Case Study in San Diego

With the worldwide growth in deploying high-voltage direct current (HVDC) transmission systems, their ability to facilitate black-start (BS) restoration has been a research topic of interest. In this context, voltage source converter (VSC)-HVDC is regarded as a BS resource, and this paper proposes a VSC-HVDC-assisted parallel BS restoration strategy in bulk power systems. The proposed strategy consists of two stages: 1) determination of the VSC and generator startup sequence and 2) load restoration simulation. In the first stage, the entire blackout system is sectionalized into multiple subsystems. Each subsystem includes a VSC-HVDC station or traditional BS unit, it independently determines its generator startup timeline and the energization timelines for buses and lines. The second stage involves load restoration, conceptualized as a modified unit commitment problem, with the timelines established in the first stage work as critical inputs. The proposed BS restoration strategy is tested on the San Diego power system to simulate the 2011 Southwest blackout. The simulation results validate the effectiveness of using VSC-HVDC links as a BS resource which not only speeds up the restoration process but also reduces both energy and economic losses.

24 POWER TRANSMISSION AND DISTRIBUTION

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY

The missing correlation between the potential rate impacts of rooftop solar and the timing of state net metering policy revisions

Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states—California and Hawaii—retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria

CWMD Nuclear Forensics Quarterly Report

Analysis and evaluation of nuclear debris is a key component to identify forensic signatures in a post-detonation environment. Currently, methods exist and are practiced in obtaining signatures from post-detonation debris. However, efforts to reduce the timeline in obtaining signatures is continuous within nuclear forensics research and will be forwarded by this research. This education and research project will explore combined material chemistry and separations of radionuclides to provide actionable signatures in less time than standard methods. The research will use the phase distribution of radionuclides in debris to develop targeted and rapid dissolution methods. These dissolution methods will be coupled with microfluidics to achieve samples suitable for analysis within reduced timelines.

and nuclear chemistry

Design Initiative for a 10 TeV pCM Wakefield Collider

This document outlines a community-driven Design Study for a 10 TeV pCM Wakefield Accelerator Collider. The 2020 ESPP Report emphasized the need for Advanced Accelerator R&D, and the 2023 P5 Report calls for the ``delivery of an end-to-end design concept, including cost scales, with self-consistent parameters throughout." This Design Study leverages recent experimental and theoretical progress resulting from a global R&D program in order to deliver a unified, 10 TeV Wakefield Collider concept. Wakefield Accelerators provide ultra-high accelerating gradients which enables an upgrade path that will extend the reach of Linear Colliders beyond the electroweak scale. Here, we describe the organization of the Design Study including timeline and deliverables, and we detail the requirements and challenges on the path to a 10 TeV Wakefield Collider.

43 PARTICLE ACCELERATORS

The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions

Data supporting the article “The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions” (https://www.nlr.gov/docs/fy25osti/93543.pdf). Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states-California and Hawaii-retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY

Policy Reforms to Unleash Domestic Critical Minerals Mining and Processing

The United States faces growing strategic and economic risks due to its limited ability to mine, process, and refine the minerals required for national defense, energy systems, advanced manufacturing, and emerging technologies. Although the country possesses significant geological resources, development has been slowed by long and unpredictable permitting timelines, fragmented regulatory responsibilities, limited midstream processing capacity, and a shrinking technical workforce. These structural barriers have created supply chain vulnerabilities that constrain industrial growth and reduce national resilience. This report presents a comprehensive set of reforms intended to modernize the nation’s approach to critical minerals. The recommendations address federal permitting, environmental review processes, the legal framework governing mining activities, interagency coordination, domestic processing and refining capacity, and the education and workforce systems needed to support long term industry development. The analysis emphasizes practical steps to shorten project timelines, improve regulatory clarity, expand processing infrastructure, enable recovery from both conventional and nontraditional sources, and update outdated requirements that hinder the development of essential materials. Taken together, the recommended reforms would strengthen domestic supply chains, improve investment certainty, and reduce dependence on external minerals and processing infrastructure. By aligning policy, regulatory frameworks, and workforce capabilities with national needs, the United States can build a more resilient and secure critical minerals ecosystem that supports long term economic competitiveness and technological leadership.

29 - ENERGY PLANNING, POLICY AND ECONOMY

Affordable and Scalable Modular Multifamily Housing: A Case Study on Cost, Construction Time Savings, and Waste Reduction in California: Preprint

Modular construction can significantly reduce waste when compared to traditional methods. This case study evaluates cost, construction time, and waste metrics for a 195-unit stick-built project and for a 66-unit modular project both based in Los Angeles, CA. We partner with SoLa Impact (real estate developer) and Model/Z (modular manufacturer) to evaluate the impact of Model/Z's 1-bedroom modular unit which is produced in a 160,000 sq ft local factory in South Los Angeles. We compare them to similar stick-built/site-built multifamily construction by the same developer in Los Angeles. This study finds that modular production reduced construction waste through precise prefabrication, concentrated workforce expertise, and streamlined logistics while cutting transportation needs, improving project efficiency and lowering associated timelines and costs. Economies of scale are being realized as Model/Z has produced over 500 affordable housing units and supplied for projects up to 188 units, shortening schedules and lowering per-unit costs and supporting affordable housing goals in income-challenged South Los Angeles. Modular methods offer a scalable, resource-efficient pathway to increasing affordable housing supply while reducing total development costs by 10-15% and project timelines by 50%, while simultaneously creating local jobs and training opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

The U.S. Fusion Materials Community Roadmap: Near-term research priorities for the development of plasma-facing and structural materials for fusion power plants

In response to the needs of a rapidly growing private fusion industry, the U.S. Fusion Materials Coordinating Committee (FMCC) and the broader U.S. fusion materials research community undertook an extensive effort to create a comprehensive roadmap for fusion materials development. The result of this effort was the U.S. Fusion Materials Community Roadmap (US-FMCR), which describes the steps needed to advance the technical maturity of leading candidates for plasma-facing materials and structural materials for fusion power plants from laboratory-scale experiments to a point of sufficient technological readiness for industrial adoption and implementation. However, researchers face significant resource constraints as well as very aggressive pilot plant development timelines. Thus, the research strategies detailed in the US-FMCR require further assessment to downselect the specific tasks that must be prioritized within the next two to three years, in order to make the most efficient use of funding, human resources, and experimental facilities. This paper presents an overview of the US-FMCR and its development process. We also present the subset of research objectives that the FMCC identified as the most urgent research priorities for the U.S. fusion materials research community. The state-of-the-art of materials research is also highlighted for each class of materials considered in the US-FMCR. The recommendations presented here integrate an extensive evaluation of the current status of fusion materials research with a broad cross-section of opinion from the wider U.S. fusion community.

Ferry, Sara [Massachusetts Institute of Technology