Guidance for Developing and Implementing Long-Term Surveillance Plans for UMTRCA Title I and Title II Disposal Sites
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)
This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov
This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.
The DOE Office of Legacy Management (LM) Canonsburg, Pennsylvania, Disposal Site is a former uranium ore-processing site located in the borough of Canonsburg and an important part of US history. For 46 years (1911-1957), the site processed ore, for vanadium, radium and then uranium. Soils and groundwater beneath the site were contaminated by the milling operations. The 15-hectare (37-acre) site is owned by the US government and managed by LM, which serves as the federal land manager and steward of cultural, historical, and natural resources at Cold War legacy sites that have been successfully cleaned up to remedial standards. In 1978 Congress directed DOE to remediate 22 inactive uranium-ore processing sites under the Uranium Mill Tailings Radiation Control Act (UMTRCA), in accordance with standards promulgated by the US Environmental Protection Agency in Title 40 CFR Part 192 (40 (CFR 192). Subpart B of 40 CFR 192 regulates the cleanup of contaminated groundwater at the processing sites. The radioactive materials were encapsulated in US Nuclear Regulatory Commission (NRC)-approved disposal cells, and the NRC general license for UMTRCA Title I sites is established in 10 CFR 40.27. Canonsburg was the first site to be remediated under UMTRCA. From 1983 to 1985, the Canonsburg site underwent cleanup under this US law that provides for the safe and environmentally sound disposal, long-term stabilization, and control of uranium mill tailings in a manner that minimizes or eliminates radiation health hazards to the public. The site is unique in that it is one of only two UMTRCA Title I sites in the eastern half of the United States, the other site being the Burrell, Pennsylvania, Title I Disposal Site, a vicinity property to the Canonsburg site. It has been 35 years since the disposal cell at the Canonsburg site was completed. This paper discusses the many efforts that have been taken to maintain the site and presents some of the lessons learned concerning the long-term care of the site. The discussion includes but is not limited to the following: (1) Preserving site history so the community can better appreciate and understand the site. (2) Community outreach efforts, and the importance of maintaining transparency of environmental monitoring results with the community. (3) Pursuing reuse opportunities that offer the potential for improving the community. (4) Remaining engaged with the local community. (5) Remaining proactive in the long-term care of the site. (authors)
Minimum outdoor air ventilation rates (VRs) for buildings are specified in standards, including California?s Title 24 standards. The ASHRAE ventilation standard includes two options for mechanically-ventilated buildings ? a prescriptive ventilation rate procedure (VRP) that specifies minimum VRs that vary among occupancy classes, and a performance-based indoor air quality procedure (IAQP) that may result in lower VRs than the VRP, with associated energy savings, if IAQ meeting specified criteria can be demonstrated. The California Energy Commission has been considering the addition of an IAQP to the Title 24 standards. This paper, based on a review of prior data and new analyses of the IAQP, evaluates four future options for Title 24: no IAQP; adding an alternate VRP, adding an equivalent indoor air quality procedure (EIAQP), and adding an improved ASHRAE-like IAQP. Criteria were established for selecting among options, and feedback was obtained in a workshop of stakeholders. Based on this review, the addition of an alternate VRP is recommended. This procedure would allow lower minimum VRs if a specified set of actions were taken to maintain acceptable IAQ. An alternate VRP could also be a valuable supplement to ASHRAE?s ventilation standard.
This environmental baseline survey (EBS) documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-792 Switchyard Complex, which includes the former K-792 Switchyard, the K-79 1-B building, the K-796-A building, and the K-792 Northern Expansion Area located in the northwestern portion of the East Tennessee Technology Park (ETTP). The total area of the property is approximately 19.91 acres. DOE is proposing to transfer the title of this land area and buildings to the Heritage Center, LLC (Heritage Center), a subsidiary corporation of the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the transfer of this government-owned facility at ETTP to a non-federal entity. The area proposed for title transfer includes the former K-792 Switchyard, the K-792 Northern Expansion Area, Bldg. K-791-B, Bldg. K-796-A, and the underlying property known as the underlying fee. Located within the K-792 Switchyard footprint but not included in the transfer are Bldg. K-131 0-MP and Bldg. K- 131 0-MQ, two buildings owned by a private company that leases space in the northern portion of the Switchyard. The transfer footprint is bounded by Perimeter Road to the north and west, the parking area for Portal 8 to the south, and primarily the former K-792 Powerhouse Complex and Avenue 'U' North to the east; however, the eastern boundary along the Northern Expansion area has no physical features associated with it. Zone 2 remedial action objectives were developed by the DVS to support the future use of ETTP as a mixed-use commercial and industrial park. Therefore, remediation criteria were designed for the protection of the future industrial worker under the assumption the worker normally would not have the potential for exposure to soils at depths below 10 ft below ground surface (bgs). Accordingly, land use controls (LUCs) have been established to restrict disturbance of soils below 10 ft deep and to limit future land use to industriallcornmercial activities. Where the need for LUCs below 10 ft bgs is not warranted, this is so stated and explained. Once all actions associated with the DVS for Zone 1 and Zone 2 are completed and the data support it, there will be a re-evaluation with EPA and TDEC for the restriction on excavation below 10 ft. The DVS process and the preparation of this report included visual and physical inspections of the property and adjacent properties, a detailed records search, sampling and analysis of soils, radiological walkover surveys, and a risk evaluation. Resources evaluated as part of the records search included Federal Government records, title documents, aerial photographs that may reflect prior uses, and interviews with current and former employees 1 involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes were stored for one year or more, known to have been released, or disposed of. In addition, radiological surveys of Bldgs. K-791-B and K-796-A were conducted to assess the buildings radiological condition. Soil vapor sampling and polychlorinated biphenyl (PCB) swipe sampling also were conducted within the buildings. Based on the U. S. Department of Energy's (DOE's) review of the existing information, including discussions and interviews referenced herein, and evaluation of the data gathered in preparation of the environmental baseline survey (EBS) for the K-792 Switchyard Complex, DOE recommends the following: Due to the uncertainty associated with the nature of the on-site groundwater and the need to evaluate and possibly address groundwater in the future, DOE recommends that the transfer of the K-792 Switchyard Complex be achieved by a covenant deferral per the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Sect. 120(h)(3)(c). Land use restrictions associated with the covenant deferral are described.
This is the Final Technical Report for the DoE Measurement Innovation (previously Diagnostic Development) grant DE-SC0006077 titled HIBP Applications to Advance Understanding of Plasma Transport Physics (2011-2017), and subsequently titled Development of Beam Measurements to Advance Understanding of Transients and Improve Validation (2017-2020). The grant was funded by the Office of Fusion Energy Sciences (FES) for the period 1 May 2011–17 July 2020. Work performed through the grant has resulted in diagnostic innovations and new measurement capabilities that will improve understanding of transport, magnetic equilibrium, and electric fields in magnetically confined plasmas. We have developed novel hardware and advanced techniques to expand beam-based diagnostic capabilities, and extend measurements to new operating regimes. Some have been realized using a Heavy Ion Beam Probe (HIBP) having traditional features, while other applications have joined our innovations with subsets of advantageous HIBP features. This work has established smaller, more economical detection systems and, in doing so, may enable substantial extension of scenarios in which beam-based diagnostics are deployed. Key Measurement Innovations include: Computer Models and Simulations of HIBP Applications-Computer modeling and simulating of HIBP applications is central to predicting interaction of beam particles with plasmas, designing diagnostic systems, and anticipating measurement characteristics. We have extended the capability and improved measurement fidelity of the HIBP diagnostic on the Madison Symmetric Torus (MST) reversed field pinch (RFP); simulated feasibility of HIBP operation in the Helically Symmetric eXperiment (HSX) optimized stellarator; and investigated the plausibility of HIBP measurements in the ASDEX Upgrade tokamak. We have also developed a new technique that uses ion optics to model a finite phase-space beam. It yields more realistic (than traditional method) estimates of sample volume characteristics, which influence measurement resolution and sensitivity. Extension of Diagnostic Capabilities and Measurements on the MST RFP-Capabilities have been extended using the first and only HIBP installation on an RFP. Challenges associated with operation of the diagnostic on MST include the three-dimensional nature of particle trajectories, temporal topology and amplitude changes in the plasma equilibrium, and strong particle and radiative emission from the plasma. We have addressed these challenges through development of detailed and higher precision diagnostic simulations, calibrated subtraction of noise to resolve secondary ion signals, and implementation of hardware that enables higher fidelity measurement of plasma fluctuations. Development of New Hardware and Measurement Techniques - We have advanced beam-based measurement capabilities via development of new detectors and techniques to determine the poloidal magnetic flux ψ in the plasma, and enable placement of detectors close to the plasma and thus allow a smaller and less expensive diagnostic. We have demonstrated measurement of ψ, an ability that was made possible by development of highly effective noise reduction techniques. We also modeled the effect of non-ideal and instrumentation effects by developing a virtual (simulated) diagnostic. Application of beam-based diagnostics on various devices and multiple magnetic configurations (e.g. stellarator, tokamak, and reversed field pinch) enables investigation of critical physics issues and measurements resulting in the broad parameter space data needed to test and validate theory & modeling.
This is the Final Technical Report for the DOE Measurement Innovation grant DE-SC0017998 titled Neutral Atomic Beam Techniques for Diagnosis of Edge and Scrape-Off Layer Plasmas (2017-2019) and subsequently titled Neutral Atomic Beam Techniques for Diagnosis of Interior and Scrape-Off Layer Plasmas (2019-2022). The grant was funded by the Office of Fusion Energy Sciences (FES) for the period 1 September 2017 – 31 May 2022. Work performed through the grant has resulted in diagnostic innovations and new measurement capabilities that could improve understanding of magnetic equilibrium, edge localized modes in tokamaks, and bootstrap and Pfirsch-Schlüter currents in stellarators. We have performed simulations of a novel non-hydrogen beam-based diagnostic that would determine a local value (in the plasma) of the poloidal flux function by measuring the toroidal angle of the beam particles' velocity at a detector external to the plasma. The approach is similar to that of a Heavy Ion Beam Probe (HIBP), but would be able to operate with a smaller, more economical detection systems and, in doing so, may enable substantial extension of scenarios in which beam-based diagnostics are deployed. Key results include: Identification of the neutral and singly charged atoms that are most appropriate for use in the beam based diagnostic and the ionization cross-sections that are important for studying the plasma edge of a large device; Development of a promising geometry for operation in which the beam is injected horizontally near the torus midplane; Implementation of simulations using banana orbit trajectories of secondary beam ions to access plasma regions that are commonly in-accessible to an HIBP diagnostic, including sample volumes near the X-point of a diverted tokamak; Assessment of the ability of the diagnostic concept (originally developed under the assumption of, and reliant on, symmetry) to work in stellarators by performing simulations with both quasi-symmetric fields and non-quasi-symmetric fields; Measurement of noise levels with a prototype detector on a stellarator and exploration of techniques to minimize effects of noise on a diagnostic.
This report, in fulfillment of a U.S. Nuclear Regulatory Commission (NRC) license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2024. These activities occurred at the 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) and verify that the UMTRCA Title I disposal sites remain in compliance with license requirements and Long-Term Surveillance Plans (LTSPs). Individual chapters for each site are available on the LM public website at https://energy.gov/lm/sites/lm-sites.
By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM’s primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE “full administrative jurisdiction” and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites’ radiological safety and long-term public and environmental protection. This “shared-jurisdiction approach” will meet LM’s strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to “manage and conserve the lands under the mandate of multiple-use and sustained yield.” In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets.
By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM's primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE 'full administrative jurisdiction' and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites' radiological safety and long-term public and environmental protection. This 'shared-jurisdiction approach' will meet LM's strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to 'manage and conserve the lands under the mandate of multiple-use and sustained yield'. In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets. The portions of the sites where LM will ask for full jurisdiction are those that contain the disposal cell and any adjacent lands and minerals required to maintain and protect it. It is anticipated that the shared jurisdiction portion of the withdrawal would largely coincide with land where known or projected contaminated groundwater from the past ore processing exists or will migrate over time. Examples of BLM-authorized activities on the shared jurisdiction portions of the withdrawals may include livestock grazing, wildlife habitat improvement projects, recreation, and rights of ways for roads, pipelines, utilities, and communication sites. In addition, BLM could authorize subsurface uses such as oil and gas, coal, or geothermal development or groundwater pumping from deeper aquifers if the proposal would not disturb groundwater contamination. For areas of the withdrawal where the agencies will share jurisdictional authority, DOE LM and BLM will develop an interagency agreement (IA) to define acceptable uses and associated roles and responsibilities. To ensure maximum protection of human health and the environment, each site's IA will include a provision allowing DOE LM the right of first refusal against any action it believes might affect radiological safety at the site. (authors)
This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.
TiTl(VS2)4 is Orthorhombic Perovskite-derived structured and crystallizes in the monoclinic C2/m space group. The structure is three-dimensional. Ti4+ is bonded to six S2- atoms to form TiS6 octahedra that share corners with four equivalent VS6 octahedra, edges with four equivalent TlS10 cuboctahedra, edges with two equivalent TiS6 octahedra, and edges with four equivalent VS6 octahedra. The corner-sharing octahedral tilt angles are 46°. There are four shorter (2.44 Å) and two longer (2.46 Å) Ti–S bond lengths. There are two inequivalent V+2.75+ sites. In the first V+2.75+ site, V+2.75+ is bonded to six S2- atoms to form VS6 octahedra that share corners with four equivalent TlS10 cuboctahedra, corners with two equivalent TiS6 octahedra, corners with four equivalent VS6 octahedra, edges with four equivalent VS6 octahedra, a faceface with one TlS10 cuboctahedra, and a faceface with one VS6 octahedra. The corner-sharing octahedra tilt angles range from 46–52°. There are a spread of V–S bond distances ranging from 2.29–2.51 Å. In the second V+2.75+ site, V+2.75+ is bonded to six S2- atoms to form VS6 octahedra that share corners with three equivalent TlS10 cuboctahedra, corners with four equivalent VS6 octahedra, an edgeedge with one TlS10 cuboctahedra, edges with two equivalent TiS6 octahedra, edges with four equivalent VS6 octahedra, and a faceface with one VS6 octahedra. The corner-sharing octahedra tilt angles range from 49–52°. There are a spread of V–S bond distances ranging from 2.32–2.56 Å. Tl1+ is bonded to ten S2- atoms to form distorted TlS10 cuboctahedra that share corners with fourteen VS6 octahedra, edges with two equivalent VS6 octahedra, edges with four equivalent TiS6 octahedra, faces with two equivalent TlS10 cuboctahedra, and faces with two equivalent VS6 octahedra. The corner-sharing octahedra tilt angles range from 11–41°. There are a spread of Tl–S bond distances ranging from 3.25–3.39 Å. There are four inequivalent S2- sites. In the first S2- site, S2- is bonded in a 3-coordinate geometry to three equivalent V+2.75+ and two equivalent Tl1+ atoms. In the second S2- site, S2- is bonded to five V+2.75+ atoms to form distorted edge-sharing SV5 trigonal bipyramids. In the third S2- site, S2- is bonded in a 3-coordinate geometry to one Ti4+, two equivalent V+2.75+, and two equivalent Tl1+ atoms. In the fourth S2- site, S2- is bonded in a 4-coordinate geometry to two equivalent Ti4+, two V+2.75+, and one Tl1+ atom.
This environmental baseline survey (EBS) report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) Parcel ED-9 at the East Tennessee Technology Park (ETTP). Parcel ED-9 consists of about 13 acres that DOE proposes to transfer to Heritage Center, LLC (hereafter referred to as 'Heritage Center'), a subsidiary of the Community Reuse Organization of East Tennessee (CROET). The 13 acres include two tracts of land, referred to as ED-9A (7.06 acres) and ED-9B (5.02 acres), and a third tract consisting of about 900 linear feet of paved road and adjacent right-of-way, referred to as ED-9C (0.98 acres). Transfer of the title to ED-9 will be by deed under a Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report provides a summary of information to support the transfer of this government-owned property at ETTP to a non-federal entity.
This dataset includes outputs generated for the journal publication titled: "Investigating the relationship between bolide entry angle and apparent direction of infrasound signal arrivals". The outputs include .csv files with model-generated synthetic trajectories of asteroids entering Earth at a variety of impact and approach (azimuthal) angles. All outputs are based on hypothetical but realistic scenarios.
This data package contains the model inputs and outputs used in the manuscript titled "The Importance of Explicitly Representing the Streambed in Watershed Models" (Shuai et al., 2023 HP). The data.zip file contains the data used to drive the Advanced Terrestrial Simulator (ATS) model simulations. The model.zip file contains the XML input file for ATS. The notebook.zip file contains the Jupyter notebooks for pre- and post- processing model results. The figures.zip file contains the raw figures associated with the manuscript. We generated this data package in support of the manuscript and research reproducibility. The background of this study is that the streambed itself has not been explicitly represented in watershed models, although the streambed characteristics are significantly different from those of its surrounding soil. We aim to answer the following questions: 1) How do streambed properties including hydraulic conductivity, thickness and resolution impact the groundwater-surface water exchange fluxes across the streambed? 2) Is an explicit representation of streambed important in watershed modeling?; 3) Is a high-resolution streambed needed for watershed simulations?