At least 19 records

Exploration of Potential Application of Distributed Ledger Technology for Managing Transactions Under Joint Technology Development and Transfer Agreements

This document summarizes the findings from the team’s evaluation of applying DLT to transactions taking place inside and outside of a joint technology development and transfer agreement. As part of this examination, PNNL focused on addressing whether DLT could be used to promote civil nuclear cooperation without raising proliferation concerns.

97 MATHEMATICS AND COMPUTING↗

Power Grid Simulation Testbed for Transactive Energy Management Systems

To effectively engage demand-side and distributed energy resources (DERs) for dynamically maintaining the electric power balance, the challenges of controlling and coordinating building equipment and DERs on a large scale must be overcome. Although several control techniques have been proposed in the literature, a significant obstacle to applying these techniques in practice is having access to an effective testing platform. Performing tests at scale using real equipment is impractical, so simulation offers the only viable route to developmental testing at scales of practical interest. Existing power-grid testbeds are unable to model individual residential end-use devices for developing detailed control formulations for responsive loads and DERs. Furthermore, they cannot simulate the control and communications at subminute timescales. To address these issues, this paper presents a novel power-grid simulation testbed for transactive energy management systems. Detailed models of primary home appliances (e.g., heating and cooling systems, water heaters, photovoltaic panels, energy storage systems) are provided to simulate realistic load behaviors in response to environmental parameters and control commands. The proposed testbed incorporates software as it will be deployed, and enables deployable software to interact with various building equipment models for end-to-end performance evaluation at scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transactive Campus Energy Systems: An R&D Testbed for Renewalables Integration, Efficiency, and Grid Services - CRADA 356 (Abstract)

Under this Cooperative Research and Development Agreement (CRADA), the project team consisting of Pacific Northwest National Laboratory (PNNL), acting on behalf of the U.S. Department of Energy, and the University of Washington (UW) and Washington State University (WSU), acting under the purview of the State of Washington’s Department of Commerce (the “industrial” partner), will connect the PNNL, UW, and WSU campuses to form a multi-campus test bed for transaction-based energy management – transactive – solutions (see sidebar). Building on the foundational transactive system established by the Pacific Northwest Smart Grid Demonstration (PNWSGD), it is proposing to construct the test bed as both a regional flexibility resource and as a platform for R&D on buildings/grid integration and information-based energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation and Demonstration of Blockchain Applicability Framework

Blockchain technology has been gaining great interest from a variety of industry sectors, including financial, food processing, and power and energy markets. Realizing the strength of blockchain technology beyond the successful application in the cryptocurrency arena, researchers have been evaluating and using blockchain for applications such as supply chain management, transactive industry (both financial and energy), system integrity, device cybersecurity, identity management, and much more. One of the unique elements of the blockchain technology that made it such a captivating technology to researchers is its plethora of features. Some of the features include smart contracts, cryptocurrency and tokenizing, immutable distributed ledger, cryptographic hashing, and digital signature. In addition, there are multiple types of blockchains, such as permissioned/private and permissionless/public, and various consensus models, such as proof-of-work, proof-of-authority, proof-of-burn, and proof-of-stake. Therefore, it is often non-trivial to determine if an application requires a blockchain. If so, what kind of blockchain and consensus is most appropriate? This paper discusses the blockchain applicability framework (BAF), which was specifically designed with the purpose to answer those questions. BAF is divided into five domains, 18 subdomains, and about 100 controls. It is designed to ingest detailed user requirements to perform a weighted evaluation that is built on mathematical constructs to determine the ideal combination of blockchain that is appropriate for an application. Along with the core logical formulation of BAF, this paper depicts the efficacy of BAF through two use cases

Gourisetti, Sri Nikhil G.↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Introduction to the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS)

Deployment and capability of distributed energy resources (DER) in power systems is growing rapidly. These resources present an opportunity for low-cost provision of energy and grid services. The Federal Energy Regulatory Commission recently provided rulings to enable market participation of these distribution-connected resources, but the prevailing strategies for their management may not scale well to meet future needs. This paper introduces the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS) which was designed to address this need. In it we describe the architectural features of the approach, and a reference controls implementation employing a hierarchical coordination that includes stochastic optimization, model predictive control, and a simple real-time management scheme. Sample results from simulation show firm transmission-level service provision measured at the distribution substation.

grid architecture↗

An Introduction to the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS): Preprint

Deployment and capability of distributed energy resources (DER) in power systems is growing rapidly. These resources present an opportunity for low-cost provision of energy and grid services. The Federal Energy Regulatory Commission recently provided rulings to enable market participation of these distribution-connected resources, but the prevailing strategies for their management may not scale well to meet future needs. This paper introduces the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FASTDERMS) which was designed to address this need. In it we describe the architectural features of the approach, and a reference controls implementation employing a hierarchical coordination that includes stochastic optimization, model predictive control, and a simple real-time management scheme. Sample results from simulation show firm transmission-level service provision measured at the distribution substation.

DERMS↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating the Feasibility of Transactive Approach for Voltage Management Using Inverters of a PV Plant

This article evaluates the feasibility of a double-auction-based Transactive Energy System (TES) for engaging the reactive power (Var) capability of inverters in a utility-scale pho¬tovoltaic (PV) plant for voltage management in distribution feed¬ers. In this approach, a PV plant owner (seller) provides Var supply curves in terms of price-quantity pairs consider¬ing the inverters’ P-Q capability, efficiency, opportunity cost for real power curtail¬ment, losses, etc. At the same time, the utility (buyer) proposes Var demand curves in price-quantity pairs exhibiting the marginal price of Var. Then, market clearing points are obtained from the intersection points of supply and demand curves which are then used to create Var dispatch sig-nals from the PV plant. To conduct a fea¬sibility study of this approach, an Australian distribution network with a utility-scale PV plant (capacity 3.275 MWP) is modeled in RSCAD and simu¬lated in real-time on MATLAB, RSCAD-RTDS co-simulation platform using real historical data. Consid¬ering a use case, namely, conservation voltage reduction (CVR), the operational feasibility along with cost-benefit analysis is demonstrated in software-in-the-loop (SIL) and hardware-in-the-loop (HIL) platform. Another use case, exploring the benefit from tap-change reduction of step-voltage-regulator, is investigated. These studies explore further use cases, e.g., PV hosting capacity, network reconfiguration, etc., to be incorporated in TES for experiencing substantial economic benefits.

Alam, Mollah Rezaul↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions

There are fewer conventional, dispatchable generation resources and more variable renewable energy (VRE) and distributed energy resources (DERs). There is more uncertainty from bulk-level VRE and net demand from distribution systems with high DER levels. FAST-DERMS aims to develop and demonstrate a scalable solution for managing uncertainties in supply and demand at the grid edge. We propose that distribution system operators (DSOs) provide firm net load forecasts to the bulk system operator's energy management system (EMS).

distributed energy resources↗

Blockchain Research and Development Activities Sponsored by the U.S. Department of Energy and Utility Sector

This article provides an in-depth analysis of blockchain research in the energy sector, focusing on projects funded by the U.S. Department of Energy (DOE) and comparing them with industry-funded initiatives. A total of 110 funded activities within the U.S. power industry were successfully tracked and mapped into a newly developed categorization framework. This framework is designed to help research agencies to systematically understand their funded portfolio. Such characterization is expected to help them make effective investments, identify research gaps, measure impact, and advance technological progress to meet national goals. In line with this need, the proposed framework proposes a 2-D categorization matrix to systematically classify blockchain efforts within the energy sector.Under the proposed framework, the Energy System Domain serves as the primary classification dimension, categorizing use cases into 30 distinct applications. The second dimension, Blockchain Properties, captures the specific needs and functionalities provided by Blockchain technology. The aim was to capture blockchain’s applicability and functionality: where and why blockchain? Principles behind the selection of the viewpoint dimensions were carefully defined based on consensus obtained through the Blockchain for Optimized Security and Energy Management (BLOSEM) project. The mapped results show that activities within the Grid Automation, Coordination, and Control (31.8%), Marketplaces and Trading (25.5%), Foundational Blockchain Research (19.1%), and Supply Chain Management (17.3%) domains have been actively pursued to date. The three leading specific use case applications were identified as Transactive Energy Management for Marketplaces and Trading, Asset Management for Supply Chain Management, and Fundamental Blockchain for Foundational Blockchain Research. The Marketplaces and Trading and Retail Services Enablement domains stood out as being favored by industry by a factor greater than 2 (2.3 and 2.6, respectively), yet there seemed to be little to zero investment from DOE. Approximately 76% of the total projects prioritized Immutability, Identity Management, and Decentralization and/or Disintermediation compared to Asset Digitization and/or Tokenization, Automation, and Privacy and/or Anonymity. The greatest discrepancies between DOE and industry were in Asset Digitization and/or Tokenization and Automation. The industry efforts (36% in Asset Digitization/Tokenization and 22% in Automation) was 14 times and 2.4 times, respectively, more intensive than the DOE-sponsored efforts, indicating a significant discrepancy in industry versus government priorities. Overall, quantifying DOE-sponsored projects and industry activities through mapping provides clarity on portfolio investments and opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interregional Transmission Operational Coordination

This presentation will discuss challenges and opportunities on interregional coordination in the areas of interchange transaction, congestion management, reserve sharing and deliverability across multi-stage operational processes. It will then provide an overview of the interregional transmission operational coordination (IRTOC) project that currently focuses on congestion management, including Inter-regional transmission coordination in real time operations and operational planning, HVDC optimization (intra- and interregional), ancillary service deliverability (intra- and interregional). In addition, it will discuss the Sienna-Decomposition tool development to systematically study interregional coordination methods.

congestion management↗