Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transit Habitat”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Notional Habitat Science Outfitting for a Lunar Surface Habitat or Mars Transit Habitat

Science outfitting is often given insufficient treatment in the development of early conceptual studies for lunar surface habitats. In some cases, only control masses and volumes are used as placeholders. In others, one science discipline may be given detailed treatment while others are largely ignored. It is not unheard of for science outfitting to be entirely forgotten in initial concept layouts. This is exacerbated by the reality that spacecraft design studies are often initiated long before science objectives have been established for any given human spaceflight destination. When those objectives later emerge, they can be difficult to accommodate if sizing studies did not allocate sufficient resources for them. A notional science outfitting can be created for virtually any human exploration habitat, however, utilizing data created by the International Space Station and Constellation programs. Biology, human research, physics, and geology science laboratories and a general-purpose work area for a lunar surface habitat will be derived using equipment identified by the Constellation-era Optimizing Science and Exploration Working Group (OSEWG) or flown on the International Space Station. Early science outfitting definition and inclusion in surface habitat sizing is critical for developing an exploration architecture that meets science needs. The mass, volume, power, and use cases associated with these notional laboratories impacts all of the habitat subsystems, habitat dimensions, hatch dimensions, logistics operations, launch vehicles and landers.

Lunar Habitat↗

Gateway Lunar Habitat Modules as the Basis for a Modular Mars Transit Habitat

This paper provides a summary of the results from a recent concept study of various configurations for a Mars Transit Habitat. The designs considered are composed of modules based on published contractor concepts proposed for the lunar Gateway through NASA’s NextSTEP program. Using these Gateway concepts as a starting point for the design of a Mars Transit Habitat has potential advantages. Both Gateway and Mars Transit Habitats will have similar requirements for long-term operations in deep space, autonomous and remote operations when the crew is not onboard, and similar requirements for transferring crew to and from a planetary surface—the Moon and Mars respectively. The contractor designs for Gateway were traded against a monolithic transit habitat previously proposed by NASA’s Mars Integration Group. In addition, these concepts were considered for a “shakedown” mission for the transit habitat hardware in cislunar space to build confidence in new systems, including the advanced environmental control and life support systems needed for Mars missions. The results presented include overall vehicle configurations, mass, and volume estimates for the selected design concepts. Two concepts using large expandable modules are identified as leading candidates for a Mars Transit Habitat and the remaining elements are identified as representative of the habitable pressure vessels needed for safe haven configurations, logistics modules, surface habitats, rovers, and descent and ascent crew cabins in the overall Mars Architecture.

Smitherman, David↗

Functional Volume Assessment of an Early Version of the Mars Transit Habitat

During the summer of 2020, NASA assessed the transit habitat concept that was being used in Mars human exploration architecture studies. This assessment had six primary objectives: (1) provide a sanity check to the transit habitat concept layout; (2) understand if we can fit the hardware and functional tasks in the volume; (3) provide a high-level assessment of how aggressive the layout is; (4) generate a list of challenges or assumptions necessary to make it work; (5) generate a list of future work to refine understanding; and (6) identify proposed requirements. The results of this evaluation are discussed, including methodological challenges and rating challenges. Acceptability results are discussed for functions that the participants were able to rate and participant comments for functions that could not be evaluated are also described. Final conclusions are described, including challenges or assumptions needed to make the transit habitat concept design acceptable, future work needed to refine understanding of the transit habitat concept, and proposed habitat requirements based on test data. While NASA has since moved away from this architecture, the assessment is still useful to inform the design of future transit habitats or other deep space crewed vehicles.

Transit Habitat↗

NASA’s Moon to Mars (M2M) Transit Habitat (TH) Refinement Point of Departure (PoD) Design

As NASA prepares for the next human footsteps on the lunar surface, the Agency is already looking ahead to systems that will enable a sustained human presence on the lunar surface and mission to Mars, including a lunar Surface Habitat and Mars Transit Habitat (TH). This paper describes the latest NASA government reference design for the TH and how it will support NASA's Moon to Mars human exploration architecture. First, it will serve as a test and demonstration platform in lunar orbit, demonstrating capabilities required for long-duration microgravity human spaceflight as part of the lunar-Mars analog missions. Then, the TH will also serve as a major Mars habitation exploration element to support the crew during their transit from the lunar orbit to Mars and returning them safely to lunar orbit. This paper will cover several considerations contributing to the latest habitat design refinement, including data on the TH's concept of operations, system functional definition, subsystem assumptions, notional interior layouts, a detailed mass and volume breakdown, and trade studies and analyses required to close identified technology/ development/architecture gaps. In addition to a technical description of the TH, this paper describes how the current TH government reference design will achieve many of the current lunar and Mars mission goals. Additionally, there are many assumed technological advances needed to support the prescribed mission phases leading up to the crewed mission to Mars in the late 2030s. The paper will describe many of the TH systems requiring further technology development and identify architectural solutions to achieve these mass, reliability, autonomy, and crew health targets. As a whole, the data in the paper shows that a TH meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, re-purposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons, including staging of launch structure/packaging and alternate structural materials. The resulting design detail and data contained in this paper are intended to help teams across NASA and potential commercial, academic, or international partners understand the current performance targets of the Transit Habitat and vehicle interface considerations imposed by the latest Moon to Mars mission scope.

Habitation Systems↗

NASA’s Moon to Mars (M2M) Transit Habitat Refinement Point of Departure Design

As NASA prepares for the next human footsteps on the lunar surface, the Agency is already looking ahead to systems that will enable a sustained human presence on the lunar surface and mission to Mars, including a lunar Surface Habitat (SH) and Mars Transit Habitat (TH). This paper describes the latest NASA government reference design for the TH and how it will support NASA's Moon to Mars human exploration architecture. First, it will serve as a test and demonstration platform in lunar orbit, demonstrating capabilities required for long-duration microgravity human spaceflight as part of the lunar-Mars analog missions. Then, the TH will serve as a major Mars exploration element to support crew habitation during their transit from the Earth’s orbit to Mars and returning safely before TH’s return to a lunar orbit. This paper will cover several considerations contributing to the latest habitat design refinement, including the TH's concept of operations, system functional definition, subsystem assumptions, notional interior layouts, a detailed mass and volume breakdown, and identify future trade studies and analyses required to close identified technology/ development/architecture gaps. In addition to a technical description of the TH, this paper describes how the current TH government reference design will achieve many of the current lunar and Mars mission goals. Additionally, there are many assumed technological advances needed to support the prescribed mission phases leading up to the crewed mission to Mars in the late 2030s. The paper will describe many of the TH systems requiring further technology development and identify architectural solutions to achieve these mass, reliability, autonomy, and crew health targets. As a whole, the data shows the government reference TH design meeting the 26.4 metric ton launch /trans-Mars injection burn control mass limit outlined within NASA’s Moon to Mars Campaign. This is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, innovative structures configuration and materials, and system/ logistics packaging. The resulting design detail and data contained in this paper are intended to help teams across NASA and potential commercial, academic, or international partners understand the current performance targets of the Transit Habitat and vehicle interface considerations imposed by the latest Moon to Mars mission scope.

Habitation Systems↗

NASA's Advanced Exploration Systems Mars Transit Habitat Refinement Point of Departure Design

This paper describes the recently developed point of departure design for a long duration, reusable Mars Transit Habitat, which was established during a 2016 NASA habitat design refinement activity supporting the definition of NASA's Evolvable Mars Campaign. As part of its development of sustainable human Mars mission concepts achievable in the 2030s, the Evolvable Mars Campaign has identified desired durations and mass/dimensional limits for long duration Mars habitat designs to enable the currently assumed solar electric and chemical transportation architectures. The Advanced Exploration Systems Mars Transit Habitat Refinement Activity brought together habitat subsystem design expertise from across NASA to develop an increased fidelity, consensus design for a transit habitat within these constraints. The resulting design and data (including a mass equipment list) contained in this paper are intended to help teams across the agency and potential commercial, academic, or international partners understand: 1) the current architecture/habitat guidelines and assumptions, 2) performance targets of such a habitat (particularly in mass, volume, and power), 3) the driving technology/capability developments and architectural solutions which are necessary for achieving these targets, and 4) mass reduction opportunities and research/design needs to inform the development of future research and proposals. Data presented includes: an overview of the habitat refinement activity including motivation and process when informative; full documentation of the baseline design guidelines and assumptions; detailed mass and volume breakdowns; a moderately detailed concept of operations; a preliminary interior layout design with rationale; a list of the required capabilities necessary to enable the desired mass; and identification of any worthwhile trades/analyses which could inform future habitat design efforts. As a whole, the data in the paper show that a transit habitat meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, repurposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons including staging of launch structure/packaging and alternate structural materials.

Simon, Matthew↗

The Effects of Reducing the Structural Mass of the Transit Habitat on the Cryogenic Propellant Required for a Human Phobos Mission

A technique for rapidly determining the relationship between the pressurized volume, structural mass and the cryogenic propellant required to be delivered to Earth orbit for a Mars Transit Habitat is provided. This technique is based on assumptions for the required delta-V's, the Exploration Upper Stage performance and the historical structural masses for human spacecraft from Mercury Program through the International Space Station. If the Mars Transit Habitat is constructed from aluminum, structural mass estimates based on the habitat pressurized volume are accurate to within 15%. Other structural material options for the Mars Transit Habitat are also evaluated. The results show that small, achievable reductions in the structural mass of the Transit Habitat can save tens of thousands of pounds of cryogenic propellant that need to be delivered to Earth orbit for a human Phobos Mission.

Zipay, John Joseph↗

The Effects of Reducing the Structural Mass of the Transit Habitat on the Cryogenic Propellant Required for a Human Phobos Mission

A technique for rapidly determining the relationship between the pressurized volume, structural mass and the cryogenic propellant required to be delivered to Earth orbit for a Mars Transit Habitat is provided. This technique is based on assumptions for the required delta-V's, the Exploration Upper Stage performance and the historical structural masses for human spacecraft from Mercury Program through the International Space Station. If the Mars Transit Habitat is constructed from aluminum, structural mass estimates based on the habitat pressurized volume are accurate to within 15 percent. Other structural material options for the Mars Transit Habitat are also evaluated. The results show that small, achievable reductions in the structural mass of the Transit Habitat can save tens of thousands of pounds of cryogenic propellant that need to be delivered to Earth orbit for a human Phobos Mission.

Zipay, John J.↗

Transit Habitat Government-Reference Conceptual Design Reaction Control System Propulsion Concept Design Data Book

The function of Transit Habitat (TH) Reaction Control System (RCS) propulsion is to provide free-flying spacecraft capabilities and to augment Gateway stack control when docked on Gateway. The requirements of multiple propellant replenishments and extensive life operation have significant impacts on selection of the propulsion system concept and components for the RCS. The intent of this document is to provide insight into the government-reference conceptual design of a propulsion system for TH element. A pressure-fed hypergolic bi-propellant system is the assumed propulsion approach for the RCS. Its architectural concept is being traded within the NASA Moon to Mars architecture. A pressure-regulated system is examined. The propellants under consideration are Monomethyl Hydrazine (MMH) and Mixed Oxides of Nitrogen with 3% Nitric Oxide (MON3). A peer review was conducted to assess the flow schematic design and propulsion component selection, compliant with a set of assumed requirements. Redundant components to satisfy one-fault tolerance for function and two-fault tolerance against catastrophic events are incorporated in the propulsion concept design. Instrumentation laid out on the schematic would be used to gather data to monitor the health of the propulsion system and to support quantity gauging of the propulsion system fluids. Venting propellant ullage gas overboard during the refilling operations poses a significant concern to the external surfaces of the TH. A liquid/gas separator would be required to eliminate, or at least reduce, the amount of liquid propellant expelled in the vent gas mixture. The technology readiness level of the phase separator for the TH must be advanced. Metal diaphragm and non-positive-expulsion PMD propellant tank systems were traded against each other, with the PMD architecture being selected. A blowdown concept is also considered for the TH RCS propulsion. Its fluid schematic is derived from the pressure-regulated schematic with removal of assemblies involving the helium pressurization and ullage venting. Its system wet mass is 10% heavier than the pressure-regulated due to thruster performance loss and larger propellant tanks. There is no firm constraint on the propulsion system mass at this phase of the design. The blowdown concept can offer reduction in component count and operation, that would lead to a more reliable propulsion system. The blowdown concept would also benefit avionics, thermal, power, and structures on the TH. Assessing these benefits will be carried as a future work. Drawbacks of thrust and minimum impulse bit (MIB) variations due to the blowdown operation would be acceptable to Guidance, Navigation, and Control (GNC). Although the blowdown concept has been selected as a current baseline, further evaluation of the concept will be the subject of future work to ensure that the blowdown propulsion operation is appropriate for the HT RCS propulsion. This document also highlights key trade studies and design decisions, including pros and cons of the selected concept. Other appropriate options for components are pointed out for future assessments. Additional background information and documents for further review are referenced in this report.

spacecraft propulsion↗

Metallic Vs Inflatable Primary Structure: A Comprehensive Trade for a Mars Transit Habitat

Large diameter inflatable habitat solutions are hypothesized to have an advantage over traditional metallic habitats of equal volume and functional requirements in terms of minimizing mass. A fair and comprehensive trade of metallic primary structure versus inflatable softgoods primary structure for a Mars Transit Habitat was conducted by The Boeing Company under the NASA Next Space Technologies for Exploration Partnerships-2 (NextSTEP-2)Appendix A contract in order to determine the minimum mass option from a system level. A Mars Transit Habitat is a major system mass driver because small increases in the mass can create large mass changes in the propulsive stage, adding complexity and cost to the mission. Three different vehicle configurations were traded using a fixed volume constraint and the same Ground Rules and Assumptions(GR&A)provided by NASA. The configurations were 1) 5.5 m diameter metallic habitat, 2) 7.0 m diameter metallic habitat, and 3) 7.63 m diameter inflatable habitat. In order to complete the trade, each configuration was analyzed and sized, but a system level approach had to be taken to ensure other aspects and subsystems besides the structure were captured. The primary functions (i.e. restraint layer, bladder, multilayer insulation [MLI], micro-meteoroid orbital debris [MMOD]) and strength advantages of softgoods are well understood, but there were other system level impacts that were discovered or addressed that are unique to softgoods. For the metallic structure, a modern and mass optimal material and manufacturing process was adopted to ensure the lightest weight options were evaluated. Two different aluminium lithium structures were evaluated, a longer length 5.5 m diameter and a shorter length 7 m diameter structure. The trade demonstrates that each configuration is feasible and close to the target dry mass for the Mars Transit Habitat Trans-Martian Injection burn. System level mass was the primary consideration, but since the three concepts were close in total mass, a clear winner did not arise. Secondary factors were evaluated such as architecture habitability (human factors), development considerations, on-orbit activation and outfitting, extensibility to other applications, and configuration flexibility. The aggregation of the lowest mass, most benefits, and fewest challenges resulted in the 5.5m diameter metallic configuration being the most favorable.

Matthew Ziglar↗

Transit Habitat Concept and Mars Analog in Cislunar Orbit

- Transit Habitat Overview - Supports 4-crew during Lunar-Mars Analog missions leading up to a 700-1110-day Mars mission - Hybrid inflatable-metallic habitat structure - Launched commercially and outfitted with logistics in cis-lunar orbit (NRHO) - Docks w/ an interim propulsion bus or Gateway for first ~5 years until Mars Propulsion System (MPS) elements available - Extends Gateway operations beyond 60 days - Contingency Airlock and EVA capability - Planned reuse for multiple missions over 15-year lifetime - Builds on ISS and commercial investment in deep space habitation - Mid-2030s launch with late 2030s Mars Departure

Mars↗

Functional Volume Assessment of an Early Version of the Mars Transit Habitat

During the summer of 2020, the NASA Mars Architecture Team (MAT) conducted a functional volume assessment of the Transit Habitat (TH). The TH has evolved substantially since that time and the current TH does not share the same internal configuration, but the insights gained from the assessment remain relevant. In virtually all architectures involving chemical, electric, or nuclear propulsion, the majority of the crew mission is spent aboard the TH. The Earth to Mars transit durations may vary from architecture to architecture, but all are on the order of hundreds of days, regardless of whether an opposition or conjunction class trajectory is selected, and regardless of whether the propulsion system is chemical, electric, or nuclear. Thus, the TH must provide capabilities appropriate to a very long duration. So, despite significant changes in the current Mars architecture over the past few years, this evaluation still provides useful recommendations in the form of habitability guidance that can be applied to current and future TH concepts. This assessment had six primary objectives: provide a sanity check to the BOC-derived TH layout; understand if we can fit the hardware and functional tasks in the volume; provide a high-level assessment of how aggressive the layout is; generate a list of challenges or assumptions necessary to make it work; generate a list of future work to refine understanding; and identify proposed requirements. All of this information is critical to drive habitat sizing studies and key architecture decisions. It was clear that a human-in-the-loop (HITL) evaluation of some kind would be necessary, but several challenges were immediately identified. The most information could be gleaned from a Desert Research and Technology Studies (DRATS) type of mission operations test (MOT), but the TH concept was too low fidelity to construct the type of prototype necessary to conduct a MOT, nor were their financial resources to do so. The next best option – and really the one most appropriate for the BOC’s stage of maturity – is a Virtual Reality (VR) walk-through evaluation. However, NASA was in a shutdown state due to the COVID-19 pandemic and the VR labs were inaccessible. As a result, a tabletop evaluation was created, using .jpg imagery from the ECM CAD model along with Excel-based datasheets. High-level crew living and working functions within the habitat were identified for evaluation. Questionnaires using Likert scales assessed acceptability of habitat functions and sim quality – the degree to which the function was represented in CAD. This enabled the evaluation to be conducted by personnel working remotely. Each function was evaluated individually along with several overarching habitability parameters and vehicle subsystems. The results of this evaluation are discussed, including methodological challenges and rating challenges. Acceptability results are discussed for functions that the participants were able to rate and participant comments for functions that could not be related are also described. Final conclusions are described, including challenges or assumptions needed to make the TH design acceptable, future work needed to refine understanding of the TH, and proposed habitat requirements based on test data.

Transit Habitat↗

Propulsion System Architecture Refueling Capability Assessment for A Mars Transit Habitat Concept

A pressure-fed hypergolic bi-propellant system is the assumed propulsion approach for the Reaction Control System (RCS) used by the Mars Transit Habitat (TH), an architectural concept being traded within the NASA Moon to Mars architecture. The propellants under consideration are Monomethyl Hydrazine (MMH) and Mixed Oxides of Nitrogen with 3% Nitric Oxide (MON3), with helium pressurant.

Propulsion Architecture↗

Capability Gaps Assessment and Identification of Critical Technology Elements for Mars Transit Habitat

The Habitation Systems Development Office (HP40) at NASA Marshall Space Flight Center supports systems engineering, integration, and project management for next generation space habitats. For in space operations and eventual transport of humans to Mars, NASA will rely on a Mars Transit Habitat (TH). The TH will be designed for an up to 1,200-day Mars mission and will carry all food and supplies needed to support four crew for this duration. In the current concept of operations, Mars TH transfers to near rectilinear halo orbit (NRHO) following launch and docks at Gateway as a visiting vehicle. While there, the TH will complete system shakedown testing and a series of analog missions which will grow from 3 to 6+ months in duration TH also augments Gateway’s habitation capabilities beyond 60-days. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. These shakedown missions will also be the first operational readiness tests of Mars TH’s long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Once shakedown missions are complete, Mars TH departs Gateway to aggregate with the Mars propulsion system in NRHO before onboarding the crew and final supplies in Earth orbit via a co-manifested Orion-logistics module. Orion and the LM return to Earth prior to the now aggregated Deep Space Transport vehicle’s journey to Mars. Development of the Mars TH requires significant technology development and maturation. Each year the agency performs a capability gaps assessment, where gaps developed by subject matter experts (SMEs) in various engineering/science disciplines are linked to architectural elements in formulation and prioritized. A gap captures the difference between the current state-of-the-art and the maturity of the capability that is needed to enable or enhance a mission as it is currently envisioned in the government reference architecture. HP40 conducted a gap analysis for Mars TH which will be summarized in this poster. Gaps classified as enabling (which means the mission cannot achieve success without gap closure) were subsequently used to identify critical technology elements (CTEs) for Mars TH. This identification of CTEs was also informed by an examination of the product breakdown structure for Mars TH and focused conversations with SMEs in specific technology areas. CTEs identified for Mars TH to date include the following (note this is not a comprehensive list – CTEs listed represent those in MSFC’s capability areas): inflatable softgoods for habitation; enhanced CO2 recovery; life support systems with greater levels of reliability and maintainability; autonomous guidance, navigation, command and control; and radiators for the Mars TH application. The habitation systems development team is currently delving deeper into each CTE to assess technology approaches being pursued, their maturity, and the degree of difficulty in maturation to meet projected Mars TH timelines. This poster will summarize work to date on the identification of enabling capability gaps linked to Mars TH and provide insight into the associated CTEs and technology maturation efforts.

technology development↗

Functional Volume Assessment of an Early Version of the Mars Transit Habitat

During the summer of 2020, the NASA Mars Architecture Team (MAT) assessed the Enhanced Habitation Capability (EHC), the transit spacecraft that was part of what was then the current Mars human exploration architecture, the Basis of Comparison (BOC). This assessment had six primary objectives: provide a sanity check to the BOC-derived EHC layout; understand if we can fit the hardware and functional tasks in the volume; provide a high-level assessment of how aggressive the layout is; generate a list of challenges or assumptions necessary to make it work; generate a list of future work to refine understanding; and identify proposed requirements. The results of this evaluation are discussed, including methodological challenges and rating challenges. Acceptability results are discussed for functions that the participants were able to rate and participant comments for functions that could not be evaluated are also described. Final conclusions are described, including challenges or assumptions needed to make the EHC design acceptable, future work needed to refine understanding of the EHC, and proposed habitat requirements based on test data. While NASA has since moved away from the BOC architecture, this assessment is still useful to inform the design of future Transit Habitats.

Mars Transit Habitat↗

Safe Haven Configurations for Deep Space Transit Habitats

Throughout the human space flight program there have been instances where smoke, fire, and pressure loss have occurred onboard space vehicles, putting crews at risk for loss of mission and loss of life. In every instance the mission has been in Low-Earth-Orbit (LEO) with access to multiple volumes that could be used to quickly seal off the damaged module or escape vehicles for a quick return to Earth. For long duration space missions beyond LEO, including Mars transit missions of about 1000 days, the mass penalty for multiple volumes has been a concern as has operating in an environment where a quick return will not be possible. In 2016 a study was done to investigate a variety of dual pressure vessel configurations for habitats that could protect the crew from these hazards. It was found that for a modest increase in total mass it should be possible to provide significant protection for the crew. Several configurations were developed that either had a small safe haven to provide 30-days to recover, or a full duration safe haven using two equal size pressure vessel volumes. The 30-day safe haven was found to be the simplest, yielding the least total mass impact but still with some risk if recovery is not possible during that timeframe. The full duration safe haven was the most massive option but provided the most robust solution. This paper provides information on the various layouts considered in the study and provides a discussion of the findings for implementing a safe haven in future habitat designs.

Smitherman, David↗

Safe Haven Configurations for Deep Space Transit Habitats

Throughout the human space flight program there have been instances where systems failures resulting in smoke, fire, and pressure loss have occurred onboard space vehicles, putting crews at risk for loss of mission and loss of life. In most instances the missions have been in Low-Earth-Orbit (LEO) or Earth-Moon vicinity, with access to multiple volumes that could be used to quickly seal off the damaged module or access escape vehicles for return to Earth. For long duration missions beyond LEO, including Mars transit missions of about 1100 days, the mass penalty for multiple volumes and operating in an environment where a quick return will not be possible have been concerns. In 2016, a study was done to investigate a variety of dual pressure vessel configurations for habitats that could protect the crew from these hazards. It was found that with a modest increase in total mass it should be possible to provide significant protection for the crew. Several configurations were considered that either had a small safe haven to provide 30-days to recover, or a full duration safe haven using two equal size pressure vessel volumes. The 30-day safe haven was found to be the simplest, yielding the least total mass impact but still with some risk if recovery is not possible during that timeframe. The full duration safe haven was the most massive option but provided the most robust solution. This paper provides information on the various layouts developed during the study and provides a discussion of the findings for implementing a safe haven in future habitat designs.

Smitherman, David↗