At least 19 records

Next Step for STEP (Siletz Tribal Energy Program)

The Siletz Tribal Energy Program (STEP), housed in the Tribe’s Planning Department, will hire a data entry coordinator to collect, enter, analyze and store all the current and future energy efficiency and renewable energy data pertaining to administrative structures the tribe owns and operates and for homes in which tribal members live. The proposed data entry coordinator will conduct an energy options analysis in collaboration with the rest of the Siletz Tribal Energy Program and Planning Department staff. An energy options analysis will result in a thorough understanding of tribal energy resources and consumption, if energy efficiency and conservation measures being implemented are having the desired effect, analysis of tribal energy loads (current and future energy consumption), and evaluation of local and commercial energy supply options. A literature search will also be conducted. In order to educate additional tribal members about renewable energy, we will send four tribal members to be trained to install and maintain solar panels, solar hot water heaters, wind turbines and/or micro-hydro.

14 SOLAR ENERGY↗

Tribal Energy Program, Assisting Tribes to Realize Their Energy Visions

This 12-page brochure provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's Tribal Energy Program and describes the financial, technical, and educational assistance it provides to help tribes develop their renewable energy resources and reduce their energy consumption.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Tribal Energy Program for California Indian Tribes

A strategic plan is needed to catalyze clean energy in the more than 100 California Indian tribal communities with varying needs and energy resources. We propose to conduct a scoping study to identify tribal lands with clean energy potential, as well as communities with lack of grid-tied energy and communications access. The research focus would evaluate the energy mixture and alternatives available to these tribal communities, and evaluate greenhouse gas emissions associated with accessing fossil fuel used for heat and power. Understanding the baseline of energy consumption and emissions of communities is needed to evaluate improvements and advances from technology. Based on this study, we will develop a strategic plan that assesses solutions to address high energy fuel costs due to lack of electricity access and inform actions to improve economic opportunities for tribes. This could include technical support for tribes to access clean energy technologies and supporting collaboration for on-site demonstrations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fort Yukon wood Energy Program Wood Boiler Deployment (Final Report)

The Fort Yukon Gwitchyaa Zhee Corporation (GZ) worked with partners on the development of an Integrated Biomass Energy Program for Fort Yukon. This integrated approach linked sustainable forest management with an in- village for -profit wood harvest and delivery business to displace diesel energy with wood energy for heat and power. The program was based on the concept of ecological, economic and social sustainability with a goal of displacing as much diesel and fuel oil as is technically feasible and sustainable; essentially systematically converting a village to significant amounts of wood use. Additionally, GZ worked with the Alaska Energy Authority (AEA) on the development of a rural power system upgrade (RPSU) project that replaced GZ’s existing antiquated diesel power plant and provided upgrades to the existing electrical distribution system. Due to the synergy of the two projects, the Biomass and RPSU projects were combined to provide improved operating efficiency, economy of scale and increased benefits to GZ, the Council of Athabascan Tribal Governments (CATG) and the community of Fort Yukon. The combined project is referred to as the Fort Yukon Combined heat and power (CHP) project. The purpose of the DOE Tribal Energy Program award was to support the preconstruction tasks and installation of wood boilers at the CATG clinic, and at the new GZ diesel power plant as part of an overall program to create a for- profit wood energy utility in Native Village of Fort Yukon. The CHP project provides biomass and diesel generation recovered heat via a new district heating system to the major commercial buildings in Fort Yukon. The CATG clinic will receive heat from a separate biomass boiler to their heating needs. The award from the Department of Energy (DOE) Tribal Energy Program was divided into two phases: Design/Permitting (phase 1) and Construction (phase 2). Phase 1 (Design & Permitting) is cost shared using State of Alaska Renewable Energy Funding (REF) funds through the Alaska Energy Authority (AEA). Phase 2 (Construction) was funded by DOE, AEA and US Department of Agriculture Rural Utility Service (USDA-RUS). Phase 1 of this grant, along with a separate grant from the Denali Commission provided funding for development of the wood delivery infrastructure necessary to support the CHP project. Under phase 2, This DOE grant supported final design of the boiler, bidding, purchase and transport of boilers, installation, technical support and engineering. The AEA and RUS grants supported permitting, final design, material and equipment purchase, and construction and installation of the new diesel power plant and district heating distribution system.

09 BIOMASS FUELS↗

Pascua Yaqui Tribe Renewable Energy Development and Deployment Solar Feasibility Study

In 2012, PYT was awarded a grant from the Department of Energy Tribal Energy Program to conduct a Renewable Energy Development and Deployment Feasibility Study that would define the technical and economic viability of renewable energy on tribal lands. Red Mountain Energy Partners (RMEP) was hired by PYT to complete the study. Through this study, Red Mountain concluded that there are viable opportunities for solar at Tortuga Ranch, the Casino del Sol and a third site near the Justice Center on Camino de Oeste.

14 SOLAR ENERGY↗

Energy Paths for the Yurok People

This Yurok Tribe energy strategic planning study examined electricity usage, costs and infrastructure, as well as electricity needs on the Reservation. It also assessed the Tribe’s energy resources. Equipped with this information, the project team conducted an energy options analysis that examined different project opportunities and identified key projects that are both feasible to implement and will help the Tribe reach its stated Energy Vision. A key finding of the energy needs assessment is that there are still numerous households that are without grid electric power, and it is likely that most of them will remain disconnected from the grid because of their remoteness. To provide these community members with reliable, affordable, modern energy services their homes will need to be electrified via a robust off-grid energy services program that installs and maintains off-grid energy systems. This is the key need that is explored and addressed in this plan. The approach taken is to establish a new business entity, a Tribal Energy Authority or Utility, that will operate a Tribal Energy Program. The Energy Strategic Plan identifies a number of potential funding sources that could be used to support both the On-grid and Off-grid Energy Programs. This plan also promotes continued efforts to reduce electricity consumption through the implementation of energy efficiency measures in existing facilities and the enforcement of a strong energy-efficient building code for all new construction on the Reservation. Finally, the plan promotes added resilience at critical Tribal facilities on the Reservation by recommending that battery energy storage systems and microgrid controls be coupled with rooftop solar PV systems to create cutting edge microgrid facilities that can provide critical power services to Tribal facilities when the main electric grid is shutdown.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Assist for Administration Building and Community Gym/Pool (Final Report)

Tonto Apache Tribe applied to the Department of Energy’s “Tribal Energy Program” for the “Community Scale Clean Energy Projects” in Indian Country in 2013 to implement a solar project to reduce energy use in two tribal buildings. Total estimated project cost was $804,140, with the Department and Tribe each providing 50% of the project costs. Photovoltaic systems totaling 75 kW on the Administration Building and 192 kW on the Gymnasium were installed. We used roof tops and installed canopies in adjacent parking areas for mounting the systems. The installed systems were designed to offset 65% of the facilities electric load.

14 SOLAR ENERGY↗

Tonto Apache Solar, Phase II

The Tonto Apache Tribe decided to apply for a second Grant opportunity within the Department of Energy’s “Tribal Energy Program” for the “Community Scale Clean Energy Projects” in Indian Country in 2015. The plan was to create a solar energy project with Photovoltaics that would offset the energy footprint of the tribal hotel on the reservation.

14 SOLAR ENERGY↗

A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation

The project, A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation, is funded under a solicitation issued by the U.S. Department of Energy Tribal Energy Program. Funding provided by the grant allowed the Navajo Nation to measure wind potential at two sites, one located within the boundaries of the Navajo Nation and the other off-reservation during the project period (September 5, 2005 - September 30, 2009). The recipient for the grant award is the Navajo Tribal Utility Authority (NTUA). The grant allowed the Navajo Nation and NTUA manage the wind feasibility from initial site selection through the decision-making process to commit to a site for wind generation development. The grant activities help to develop human capacity at NTUA and help NTUA to engage in renewable energy generation activities, including not only wind but also solar and biomass. The final report also includes information about development activities regarding the sited included in the grant-funded feasibility study.

17 WIND ENERGY↗

Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska final report

The Aleutian Pribilof Islands Association was awarded a U.S. Department of Energy Tribal Energy Program grant (DE-EE0005624) for the Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (Project). The goal of the Project was to perform a feasibility study to determine if a tidal energy project would be a viable means to generate electricity and heat to meet long-term fossil fuel use reduction goals, specifically to produce at least 30% of the electrical and heating needs of the tribally-owned buildings in False Pass. The Project Team included the Aleut Region organizations comprised of the Aleutian Pribilof Island Association (APIA), and Aleutian Pribilof Island Community Development Association (APICDA); the University of Alaska Anchorage, ORPC Alaska a wholly-owned subsidiary of Ocean Renewable Power Company (ORPC), City of False Pass, Benthic GeoScience, and the National Renewable Energy Laboratory (NREL). The following Project objectives were completed: collected existing bathymetric, tidal, and ocean current data to develop a basic model of current circulation at False Pass, measured current velocities at two sites for a full lunar cycle to establish the viability of the current resource, collected data on transmission infrastructure, electrical loads, and electrical generation at False Pass, performed economic analysis based on current costs of energy and amount of energy anticipated from and costs associated with the tidal energy project conceptual design and scoped environmental issues. Utilizing circulation modeling, the Project Team identified two target sites with strong potential for robust tidal energy resources in Isanotski Strait and another nearer the City of False Pass. In addition, the Project Team completed a survey of the electrical infrastructure, which identified likely sites of interconnection and clarified required transmission distances from the tidal energy resources. Based on resource and electrical data, the Project Team developed a conceptual tidal energy project design utilizing ORPC’s TidGen® Power System. While the Project Team has not committed to ORPC technology for future development of a False Pass project, this conceptual design was critical to informing the Project’s economic analysis. The results showed that power from a tidal energy project could be provided to the City of False at a rate at or below the cost of diesel generated electricity and sold to commercial customers at rates competitive with current market rates, providing a stable, flat priced, environmentally sound alternative to the diesel generation currently utilized for energy in the community. The Project Team concluded that with additional grants and private investment a tidal energy project at False Pass is well-positioned to be the first tidal energy project to be developed in Alaska, and the first tidal energy project to be interconnected to an isolated micro grid in the world. A viable project will be a model for similar projects in coastal Alaska.

16 TIDAL AND WAVE POWER↗

Hualapai Wind Project Feasibility Report

The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

17 WIND ENERGY↗

Energy Efficiency Feasibility Study and Resulting Plan for the Bay Mills Indian Community

In 2011 the Inter-Tribal Council of Michigan, Inc. was awarded an Energy Efficiency Development and Deployment in Indian Country grant from the U.S. Department of Energy’s Tribal Energy Program. This grant aimed to study select Bay Mills Indian Community community/government buildings to determine what is required to reduce each building’s energy consumption by 30%. The Bay Mills Indian Community (BMIC) buildings with the largest expected energy use were selected for this study and included the Bay Mills Ellen Marshall Health Center building, Bay Mills Indian Community Administration Building, Bay Mills Community College main campus, Bay Mills Charter School and the Waishkey Community Center buildings. These five sites are the largest energy consuming Community buildings and comprised the study area of this project titled “Energy Efficiency Feasibility Study and Resulting Plan for the Bay Mills Indian Community”. The end objective of this study, plan and the Tribe is to reduce the energy consumption at the Community’s most energy intensive buildings that will, in turn, reduce emissions at the source of energy production, reduce energy expenditures, create long lasting energy conscious practices and positively affect the quality of the natural environment. This project’s feasibility study and resulting plan is intended to act as a guide to the Community’s first step towards planned energy management within its buildings/facilities. It aims to reduce energy consumption by 30% or greater within the subject facilities with an emphasis on energy conservation and efficiency. The energy audits and related power consumption analyses conducted for this study revealed numerous significant energy conservation and efficiency opportunities for all of the subject sites/buildings. In addition, many of the energy conservation measures require no cost and serve to help balance other measures requiring capital investment. Reoccurring deficiencies relating to heating, cooling, thermostat setting inefficiencies, powering computers, lighting, items linked to weatherization and numerous other items were encountered that can be mitigated with the energy conservation measures developed and specified during the course of this project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Efficiency Improvements to Wundar Hall, a Historic Building on the Concordia Campus, Milwaukee, Wisconsin

The Forest County Potawatomi Community (FCPC or Community) implemented energy efficiency improvements to revitalize Wundar Hall, a 34,000 square foot (SF) building that was formerly used as a dormitory and is listed on the National Registry of Historic Places, into an office building. Wundar Hall is the first of many architecturally and historically significant buildings that the Community hopes to renovate at the former Concordia College campus, property on the near west side of Milwaukee that was taken into trust for the Community by the United States on July 10, 1990 (collectively, the Concordia Trust Property). As part of this project, which was conducted with assistance from the Department of Energy's Tribal Energy Program (TEP), the Community updated and/or replaced the building envelope, mechanical systems, the plumbing system, the electrical infrastructure, and building control systems. The project is expected to reduce the building's natural gas consumption by 58% and the electricity consumption by 55%. In addition, the project was designed to act as a catalyst to further renovation of the Concordia Trust Property and the neighborhood. The City of Milwaukee has identified redevelopment of the Concordia Trust Property as a Catalytic Project for revitalizing the near west side. The Tribe envisions a revitalized, mixed-use campus of community services, education, and economic development—providing services to the Indian community and jobs to the neighborhood.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LRBOI Tribal Renewable Energy-Final Report

In 2011, a DOE Tribal energy Program first Steps Human Capacity was awarded to the Little River Band of Ottawa Indians (LRBOI). The main purpose of the grant was to increase human capacity of LRBOI, to understand the components of renewable energy and the importance of energy efficiency. This report summarizes the activities, the outcomes, and the lessons learned during this grant.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Feasibility Study for Paragon - Bisti Solar Ranch

The Navajo Hopi Land Commission Office (NHLCO) and Navajo Nation (NN) plan to develop renewable energy (RE) projects on the Paragon-Bisti Ranch (PBR) lands, set aside under the Navajo Hopi Land Settlement Act (NHLSA) for the benefit of Relocatees. This feasibility study (FS), which was funded under a grant from DOE’s Tribal Energy Program (TEP), was prepared in order to explore the development of the 22,000-acre PBR in northwestern New Mexico for solar energy facilities. Topics covered include: • Site Selection • Analysis of RE, and a Preliminary Design • Transmission, Interconnection Concerns and Export Markets • Financial and Economic Analysis • Environmental Study • Socioeconomic and Cultural Factors • Next Steps.

14 SOLAR ENERGY↗

Planning Brings Vision Into Focus (Brochure)

This case study/fact sheet highlights the strategic energy planning process for Tribes that was developed by the DOE Office of Indian Energy. This nine-step process, which is outlined in one of the foundational education courses offered by the Office, enables Tribes to pursue energy projects in a well-planned and strategic manner.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Weatherization Apprenticeship Program

Weatherization improvement services will be provided to Native people by Native people. The proposed project will recruit, train and hire two full-time weatherization technicians who will improve the energy efficiency of homes of Alaska Natives/American Indians residing in the Indian areas, within the Cook Inlet Region of Alaska. The Region includes Anchorage as well as 8 small tribal villages: The Native Villages of Eklutna, Knik, Chickaloon, Seldovia, Ninilchik, Kenaitze, Salamatof, and Tyonek. This project will be a partnership between three entities, with Cook Inlet Tribal Council (CITC) as the lead agency: CITCA's Employment and Training Services Department, Cook Inlet Housing Authority and Alaska Works Partnership. Additionally, six of the eight tribal villages within the Cook Inlet Region of Alaska have agreed to work with the project in order to improve the energy efficiency of their tribally owned buildings and homes. The remaining three villages will be invited to participate in the establishment of an intertribal consortium through this project. Tribal homes and buildings within Anchorage fall under Cook Inlet Region, Inc. (CIRI) tribal authority.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗