Decommissioning at AWE

AWE (A) has been at the heart of the UK Nuclear deterrent since it was established in the early 1950's. It is a nuclear licensed site and is governed by the United Kingdoms Nuclear Installation Inspectorate (NII). AWE plc on behalf of the Ministry of Defence (MOD) manages the AWE (A) site and all undertakings including decommissioning. Therefore under NII license condition 35 'Decommissioning', AWE plc is accountable to make and implement adequate arrangements for the decommissioning of any plant or process, which may affect safety. The majority of decommissioning projects currently being undertaken are to do with Hazard category 3, 4 or 5 facilities, systems or plant that have reached the end of their operational span and have undergone Post-Operational Clean-Out (POCO). They were either built for the production of fissile components, for supporting the early reactor fuels programmes or for processing facility waste arisings. They either contain redundant contaminated gloveboxes associated process areas, process plant or systems or a combination of all. In parallel with decommissioning project AWE (A) are undertaking investigation into new technologies to aid decommissioning projects; to remove the operative from hands on operations; to develop and implement modifications to existing process and techniques used. AWE (A) is currently going thorough a sustained phase of upgrading its facilities to enhance its scientific capability, with older facilities, systems and plant being replaced, making decommissioning a growth area. It is therefore important to the company to reduce these hazards progressively and safety over the coming years, making decommissioning an important feature of the overall legacy management aspects of AWE PLC's business. This paper outlines the current undertakings and progress of Nuclear decommissioning on the AWE (A) site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparation for Retrievals from Sellafield Legacy Ponds Installation of the Gantry Refurbishment System

Retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond, and its safe long term storage is one of the NDA's top priorities in the UK clean up programme. The plant is currently undergoing a series of major modifications in preparation for the retrievals operations. The most visible example of these modifications is the Gantry Refurbishment System (GRS), a major work platform which has recently been lifted onto the pond long travel girders used by the Skip Handler. This paper describes the design, manufacture, works test, and site installation of this major piece of equipment. The installation lift, involving the use of an 800Te crane was one of the largest lifts undertaken at Sellafield. The GRS is a mobile platform structure which is designed to be pushed or pulled along the long travel girders by the Skip Handler. Its principle function is to provide a safe and shielded working platform from which to undertake refurbishment of the Skip Handler long travel girders and support structure. The potential hazards and consequences resulting from the modification were fully understood and controls were put in place to ensure that the risk of carrying out the work was as low as reasonably practicable. The work was authorised by the NII, Sellafield Nuclear Safety Committee and an independent readiness review panel. Despite less than perfect weather in the run up to the lift, the GRS was successfully and safely lifted onto the pond on 18 October 2006, the culmination of three years of planning, engineering and construction. (authors)

42 ENGINEERING↗