Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Ultracapacitor-Based Uninterrupted Power Supply System

The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less downtime for applications and labor involved in replacing an ultracapacitor versus batteries. Also, the lengthy lifespan of this design would greatly reduce the disposal problems posed by lead acid, nickel cadmium, lithium, and nickel metal hydride batteries. This innovation is recyclable by nature, which further reduces system costs. The disposal of ultracapacitors is simple, as they are constructed of non-hazardous components. They are also safer than batteries in that they can be easily discharged, and left indefinitely in a safe, discharged state where batteries cannot.

Eichenberg, Dennis J.↗

Mobile Uninterruptible Power Supply

Proposed mobile unit provides 20 kVA of uninterruptible power. Used with mobile secondary power-distribution centers to provide power to test equipment with minimal cabling, hazards, and obstacles. Wheeled close to test equipment and system being tested so only short cable connections needed. Quickly moved and set up in new location. Uninterruptible power supply intended for tests which data lost or equipment damaged during even transient power failure.

Mears, Robert L.↗

Uninterruptible Power Supply Systems, UTrain Course 58423 [Slides]

Identify the principles of operation of uninterruptible power supply (UPS) systems, focusing on double conversion and offline/standby/backup types. The traditional UPS is now referred to as a “double conversion” UPS. The AC input power is rectified into DC. The DC feeds an inverter which provides the AC output. The DC bus is also connected to batteries. It is called double conversion because the first conversion is from AC to DC and the second conversion is from DC to AC. The inverter creates the output waveform to match the bypass input. Because of this, the static bypass switch may be switched between inverter and bypass seamlessly.

42 ENGINEERING↗

Operation of Dual-T-Type Modular Multilevel Converter for Uninterrupted Power Supply Under Bridge Failures

Dual-T-type modular multilevel converter (DTMMC) is an alternative to the existing uninterrupted power supply (UPS) due to its advantage in flexible leg reusing, multiple power ports, and high operating efficiency. Here, in this article, a DTMMC-UPS, which has series configurations on both input/output ac sides, obtains high-voltage grid/load accessing interfaces is presented. In the described system, the fact that copies of T-type legs are employed makes semiconductor failure common to happen. Moreover, both the coupling between rectifier and inverter conversions and the confliction between intercell and inner-cell voltage balancing make fault-tolerant control a tough issue. In this article, the switch fault types are first clarified and diagnosed by the different impacts on normal operation. An improved voltage vector modulation is then deduced to facilitate the planning of proper primary switching patterns, to achieve rectifier side normal operation. The secondary alternated level-shifted pulsed-width modulation (LS-PWM) is also modified to achieve inverter side normal operation. The experiment results are supplied to verify the validity of the modulation-coordinated fault toleration strategy.

42 ENGINEERING↗

Development and Testing of an Ultracapacitor Based Uninterruptible Power Supply (UPS) System

The NASA Glenn Research Center (GRC) initiated the development and testing of an ultracapacitor based uninterruptible power supply (UPS) system as a means to provide backup power for the many critical NASA applications. A UPS system typically utilizes batteries for energy storage. The battery is the most vulnerable part of the UPS system, requiring regular maintenance and replacement. Battery performance is also extremely temperature dependent. Ultracapacitors are ideal for UPS systems where long life, maintenance free operation, and excellent low temperature performance is essential. State of the art symmetric ultracapacitors were used for these tests. The ultracapacitors were interconnected in an innovative configuration to minimize interconnection impedance, and to provide voltage balancing. Ultracapacitors can be charged extremely rapidly and supply high current, which are essential characteristics for an effective UPS system. Charging ultracapacitors is significantly less complex than charging batteries since there is no chemical reaction occurring while charging ultracapacitors. The report concludes that the implementation of symmetric ultracapacitors in a UPS system can provide significant improvements in power system performance and reliability.

Eichenberg, Dennis J.↗

Reduced Common-Mode Voltage PWM Scheme for Full-SiC Three-Level Uninterruptible Power Supply With Small DC-Link Capacitors

In this article, a pulsewidth modulation (PWM) scheme for three-level full-SiC uninterruptible power supplies is developed to achieve a high power density. Two key passive components are selected for size reduction of the ac-ac stage: common-mode (CM) EMI filter, and dc-link capacitors. To reduce the CM noise, a new vector combination is proposed based on synchronous switching among three-phases. The proposed combinations align CM voltage (CMV) to be a single pulse per switching period. Owing to the simple shape, CMV cancellation between a three-level rectifier and inverter can be maximally utilized. A transition between the three combinations can control the drift of neutral point voltage. An equivalent carrier-based implementation is developed. Second, a simple algorithm to compensate neutral point voltage fluctuation is proposed both for differential mode (DM) and CM output voltage. Low-order harmonics on three-phase currents and an additional high-frequency CM noise by misaligned switching instant can be eliminated. The proposed compensation can be implemented by a simple correction on carrier slopes and injected zero-sequence voltage. The proposed PWM scheme is verified with 20-kW full-SiC UPS switching at 60 kHz with 140 μF dc-link capacitors.

42 ENGINEERING↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗

Safety-Class Uninterruptable Power Supply Integrator for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-001 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the detailed design and installation of a Safety-Class, Class 1E Uninterruptable Power Supply (UPS) system in accordance with ASME NQA-1 2008 and 2009 addenda and IEEE Std. 344, respectively. This scope includes all activities from detailed design of the UPS through procurement, installation, post installation testing, and dedication (as required) at Technical Area (TA)-55. Design, procurement, installation and testing of all safety-related components must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1 a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the UPS system as described herein. LANL intends to issue a separate RFP (excluding work specified herein) for work to be performed by a General Contractor supporting the UPS Project including procurement and installation of the new UPS building, pre-stressed concrete, structural steel, HVAC, fire protection, site utilities, and other ancillary equipment and components required for the facility.

42 ENGINEERING↗

Economic and Physical Linkages of the Information and Communication Technology (ICT) Service Industry to Key Industries of the Economy: An Ad Hoc Report

This report examines the information and communications technology (ICT) services industry in response to an inquiry by the Department of Energy’s (DOE’s) Office of Energy Policy and Systems Analysis. The report answers several key questions: •How has the reliance on ICT services evolved in recent years for key infrastructure services such as air travel, freight transport, electricity and natural gas distribution, financial services, and critical health care, and for the household sector? •What ICT industry trends explain continued strong linkage to and reliance upon ICT? •What is the ICT industry’s reliance on grid-supplied power, uninterruptible power supplies, emergency generators and back-up energy storage technologies? •What are the observed direct effects of ICT disruptions induced by electrical system failures in recent history and how resilient are the components of the ICT industry?

99 GENERAL AND MISCELLANEOUS↗

Electromagnetic Transient Modeling of Data Centers

This report serves as a user manual for the accompanying EMT model library developed by the National Laboratory of the Rockies (NLR) for various equipment in large data centers. The EMT model library enables detailed modeling of large data center loads for conducting grid stability studies. The EMT model library for data centers include detailed models of a 5.5 kW power supply unit (PSU), a 2.5 uninterruptible power supply (UPS), a 260 MW gas turbine-generator, a 500 kW motor load, and a 33 kW IT rack. These components represent all major equipment in data centers that need to be modeled for performing grid stability studies for data centers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mission Applicability and Benefits of Thin-Film Integrated Power Generation and Energy Storage

This paper discusses the space mission applicability and benefits of a thin-film integrated power generation and energy storage device, i.e., an "Integrated Power Source" or IPS. The characteristics of an IPS that combines thin-film photovoltaic power generation with thin-film energy storage are described. Mission concepts for a thin-film IPS as a spacecraft main electrical power system, as a decentralized or distributed power source and as an uninterruptible power supply are discussed. For two specific missions, preliminary sizing of an IPS as a main power system is performed and benefits are assessed. IPS developmental challenges that need to be overcome in order to realize the benefits of an IPS are examined. Based on this preliminary assessment, it is concluded that the most likely and beneficial application of an IPS will be as the main power system on a very small "nanosatellite," or in specialized applications serving as a decentralized or distributed power source or uninterruptible power supply.

Hoffman, David J.↗

Mission Applicability and Benefits of Thin-Film Integrated Power Generation and Energy Storage

This paper discusses the space mission applicability and benefits of a thin-film integrated power generation and energy storage device, i.e., an "Integrated Power Source" or IPS. The characteristics of an IPS that combines thin-film photo-voltaic power generation with thin-film energy storage are described. Mission concepts for a thin-film IPS as a spacecraft main electrical power system, as a decentralized or distributed power source and as an uninterruptible power supply are discussed. For two specific missions, preliminary sizing of an IPS as a main power system is performed and benefits are assessed. IPS developmental challenges that need to be overcome in order to realize the benefits of an IPS are examined. Based on this preliminary assessment, it is concluded that the most likely and beneficial application of an IPS will be as the main power system on a very small "nanosatellite," or in specialized applications serving as a decentralized or distributed power source or uninterruptible power supply.

Hoffman, David↗

A Fast and Scalable Genetic Algorithm-Based Approach for Planning of Microgrids in Distribution Networks

As a result of climate change, extreme weather events are occurring more frequently and with increasing impact. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks; thus, the level of proactive preparation of the distribution system to be able to handle severe impacts of extreme weather events represents the system's resilience. One method that distribution system planners can use to prepare for future extreme events is to plan multiple microgrids which can use local generation as much as possible to supply critical loads. But partitioning an existing distribution system such that multiple feasible islands are planned and which are capable of supporting critical loads is still challenging for distribution systems - first, because of the size of the network graph partitioning problem and, second, because of the difficulty in properly formulating the desired attributes of such islands or microgrids. Therefore, this paper presents a genetic algorithm based approach that facilitates incorporating multiple objectives for grid partitioning by formulating two types of problems - node allocation and edge elimination - and it considers multiple topological and resilience-enhancing objectives. The performance of the proposed genetic algorithm-based approach is numerically evaluated on multiple test systems as well as on a real distribution feeder in Colorado, United States.

genetic algorithm↗

Efficiency and Reliability Analyses of AC and 380V DC Distribution in Data Centers

Modern data centers consume large amounts of electricity, resulting in high operational costs. The efficiency of a data center power distribution system can be increased, and the operational cost reduced, if the number of power conversion stages can be minimized and more efficient converters, such as wide bandgap (WBG) converters, are used. This can be achieved by using DC distribution voltage at the rack level by eliminating extra conversion stages. In this paper, benchmarks for both AC and 380V DC data centers were developed and efficiency analyses were performed for an entire year. The impact of integrating photovoltaic (PV) systems into the data centers has also been analyzed in both cases in terms of efficiency. The results show that 380V DC data centers are more efficient than AC data centers with and without PV integration. Furthermore, the reliability of an AC system was compared to a 380V DC architecture with Tier-IV standard. Monte-Carlo simulations were used to perform reliability analyses for different levels of redundancy in the Uninterruptible Power Supply (UPS) system for both cases. In conclusion, the simulation results showed that the 380V DC distribution system had a higher level of reliability than the AC distribution system in data centers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Security-informed safety: integrating security within the safety demonstration of a smart device - 157

Safety and security engineering have, over the years, developed their own regulations, standards, cultures, and practices. However, there's a growing realisation that security is closely connected to safety. Safety must be security-informed: if a safety-critical system isn't secure, it isn't safe. A safety demonstration is incomplete and unconvincing unless it considers security. In our work for government and industry, we have used the Claims, Arguments, Evidence (CAE) framework to analyse the impact of security on a safety justification or safety case and identified the significant changes needed to address security explicitly. This will impact the design and implementation process as well as the assurance and V and V approach. In this paper we discuss the impact of integrating security when developing a safety demonstration of a smart device. A smart device is an instrument, device or component that contains a microprocessor (and therefore contains both hardware and software) and is programmed to provide specialised capabilities, often measuring or controlling a process variable. Examples of smart devices include radiation monitors, relays, turbine governors, uninterruptible power supplies and heating ventilation, and air conditioning controllers. (authors)

42 ENGINEERING↗

Building 1090 Boil-Off Exhaust Modifications 90% Basis of Design

This document provides analysis and proposed modifications to correct current issues at Building 1090. Electrical modifications will add additional emergency Iighting in Labs 170, 174, 178, 182, 184, 186, and 190, and back-up power for the exhaust systems, fume hood lighting and exhaust system controls during a power outage. Mechanical modifications will address building pressurization between the lab and office areas, and replacement of corroded exhaust ductwork and fume hoods related to boil-off operations of corrosive chemicals. Mechanical modifications include the installation of a dedicated, chemical boil-off exhaust fan and ductwork to support corrosive boil-off operations in Lab 184. It should be noted that the proposed solution increases the overall building exhaust demand, also increasing the supply air needed. Electrical modifications include the installation of an uninterruptible power supply (UPS) to provide power to the exhaust fan, controls, and fume hoods to allow safe exit from Laboratory 186 during a power outage. The existing lighting inverter will also be replaced with a larger model to support additional emergency lighting within the labs. Architectural modifications include exterior doors on the east wall of the IDR room. An additional door in the corridor west of Lab 184 will provide direct access to Lab 186 without entering a common building corridor. Lab casework will be modified as-required to accommodate the new layout.