Search NASA⌕ Search

SEARCH · Search NASA

Results for “UP2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Materials Data on UP2(PbO5)2 by Materials Project

UP2(PbO5)2 crystallizes in the triclinic P-1 space group. The structure is three-dimensional. U6+ is bonded in a 7-coordinate geometry to seven O2- atoms. There are a spread of U–O bond distances ranging from 1.82–2.60 Å. There are two inequivalent Pb2+ sites. In the first Pb2+ site, Pb2+ is bonded in a 6-coordinate geometry to six O2- atoms. There are a spread of Pb–O bond distances ranging from 2.34–3.20 Å. In the second Pb2+ site, Pb2+ is bonded in a 9-coordinate geometry to nine O2- atoms. There are a spread of Pb–O bond distances ranging from 2.39–3.21 Å. There are two inequivalent P5+ sites. In the first P5+ site, P5+ is bonded in a tetrahedral geometry to four O2- atoms. There is two shorter (1.55 Å) and two longer (1.56 Å) P–O bond length. In the second P5+ site, P5+ is bonded in a tetrahedral geometry to four O2- atoms. There is two shorter (1.54 Å) and two longer (1.57 Å) P–O bond length. There are ten inequivalent O2- sites. In the first O2- site, O2- is bonded in a distorted single-bond geometry to three Pb2+ and one P5+ atom. In the second O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one U6+ and one P5+ atom. In the third O2- site, O2- is bonded in a single-bond geometry to one U6+ and one Pb2+ atom. In the fourth O2- site, O2- is bonded in a 1-coordinate geometry to two equivalent U6+ and one P5+ atom. In the fifth O2- site, O2- is bonded in a distorted single-bond geometry to two Pb2+ and one P5+ atom. In the sixth O2- site, O2- is bonded in a distorted single-bond geometry to two Pb2+ and one P5+ atom. In the seventh O2- site, O2- is bonded in a distorted single-bond geometry to two equivalent Pb2+ and one P5+ atom. In the eighth O2- site, O2- is bonded in a single-bond geometry to one U6+ and two Pb2+ atoms. In the ninth O2- site, O2- is bonded in a distorted single-bond geometry to one U6+, two Pb2+, and one P5+ atom. In the tenth O2- site, O2- is bonded in a 1-coordinate geometry to one U6+, one Pb2+, and one P5+ atom.

36 MATERIALS SCIENCE↗

Materials Data on UP2 by Materials Project

UP2 crystallizes in the tetragonal P4/nmm space group. The structure is three-dimensional. U6+ is bonded in a 9-coordinate geometry to nine P3- atoms. There are a spread of U–P bond distances ranging from 2.73–2.88 Å. There are two inequivalent P3- sites. In the first P3- site, P3- is bonded to five equivalent U6+ atoms to form a mixture of distorted edge and corner-sharing PU5 square pyramids. In the second P3- site, P3- is bonded in a 8-coordinate geometry to four equivalent U6+ and four equivalent P3- atoms. All P–P bond lengths are 2.67 Å.

36 MATERIALS SCIENCE↗

Materials Data on UP2 by Materials Project

UP2 crystallizes in the tetragonal I4mm space group. The structure is three-dimensional. there are three inequivalent U6+ sites. In the first U6+ site, U6+ is bonded in a 9-coordinate geometry to nine P3- atoms. There are a spread of U–P bond distances ranging from 2.76–2.95 Å. In the second U6+ site, U6+ is bonded in a 9-coordinate geometry to nine P3- atoms. There are a spread of U–P bond distances ranging from 2.72–2.86 Å. In the third U6+ site, U6+ is bonded in a 9-coordinate geometry to nine P3- atoms. There are a spread of U–P bond distances ranging from 2.73–2.90 Å. There are four inequivalent P3- sites. In the first P3- site, P3- is bonded to five U6+ atoms to form a mixture of edge and corner-sharing PU5 trigonal bipyramids. In the second P3- site, P3- is bonded to five U6+ atoms to form a mixture of distorted edge and corner-sharing PU5 trigonal bipyramids. In the third P3- site, P3- is bonded to five U6+ atoms to form a mixture of edge and corner-sharing PU5 square pyramids. In the fourth P3- site, P3- is bonded in a 6-coordinate geometry to four U6+ and two equivalent P3- atoms. Both P–P bond lengths are 2.43 Å.

36 MATERIALS SCIENCE↗

UP2 400 High Activity Oxide Legacy Waste Retrieval Project Scope and Progress-13048

The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to allow for construction which is scheduled to being during the first semester of 2013. The elaboration of the final waste package is still undergoing and expected to be completed by then end of 2013, following some final elements of R and D required to demonstrate the full compatibility of the package with deep geological repository. The HAO legacy waste retrieval project is so far the largest such project entering operational phase on the site of La Hague. It is on schedule, under budget, and in conformity with the delivery requirements set by the French Safety Authority, as well as other stakeholders. This project paves the way for the successful completion of AREVA La Hague other legacy waste retrieval projects, which are currently being drafted or already in active R and D phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of the 904 Cell at the HAO/Sud Facility - 13466

La Hague facility, in France, is the spent fuel recycling plant wherein a part of the fuel coming from some of the French, German, Belgian, Swiss, Dutch and Japanese nuclear reactors is reprocessed before being recycled in order to separate certain radioactive elements. The facility has been successively handled by the CEA (1962-1978), Cogema (1978-2006), and AREVA NC (since 2006). La Hague facility is composed of 3 production units: The UP2-400 production unit started to be operated in 1966 for the reprocessing of UNGG metal fuel. In 1976, following the dropout of the graphite-gas technology by EDF, an HAO workshop to reprocess the fuel from the light water reactors is affiliated and then stopped in 2003. - UP2-400 is partially stopped in 2002 and then definitely the 1 January 2004 and is being dismantled - UP2-800, with the same capacity than UP3, started to be operated in 1994 and is still in operation. And UP3 - UP3 was implemented in 1990 with an annual reprocessing capacity of 800 tons of fuel and is still in operation The combined licensed capacity of UP2-800 and UP3 is 1,700 tons of used fuel. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Materials Data on UP2H8C2NO8 by Materials Project

UP2(HO4)2N(CH3)2 crystallizes in the monoclinic P2_1/c space group. The structure is two-dimensional and consists of four dimethylamine molecules and one UP2(HO4)2 sheet oriented in the (1, 0, 0) direction. In the UP2(HO4)2 sheet, U3+ is bonded to seven O2- atoms to form distorted UO7 pentagonal bipyramids that share corners with five PHO3 tetrahedra. There are a spread of U–O bond distances ranging from 1.82–2.41 Å. There are two inequivalent P5+ sites. In the first P5+ site, P5+ is bonded to one H1+ and three O2- atoms to form distorted PHO3 tetrahedra that share corners with three equivalent UO7 pentagonal bipyramids. The P–H bond length is 1.41 Å. There is two shorter (1.53 Å) and one longer (1.54 Å) P–O bond length. In the second P5+ site, P5+ is bonded to one H1+ and three O2- atoms to form distorted PHO3 tetrahedra that share corners with two equivalent UO7 pentagonal bipyramids. The P–H bond length is 1.41 Å. There are a spread of P–O bond distances ranging from 1.53–1.55 Å. There are two inequivalent H1+ sites. In the first H1+ site, H1+ is bonded in a single-bond geometry to one P5+ atom. In the second H1+ site, H1+ is bonded in a single-bond geometry to one P5+ atom. There are eight inequivalent O2- sites. In the first O2- site, O2- is bonded in a 1-coordinate geometry to one U3+ and one P5+ atom. In the second O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one U3+ and one P5+ atom. In the third O2- site, O2- is bonded in a single-bond geometry to one U3+ atom. In the fourth O2- site, O2- is bonded in a single-bond geometry to one U3+ atom. In the fifth O2- site, O2- is bonded in a distorted linear geometry to one U3+ and one P5+ atom. In the sixth O2- site, O2- is bonded in a single-bond geometry to one P5+ atom. In the seventh O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one U3+ and one P5+ atom. In the eighth O2- site, O2- is bonded in a distorted single-bond geometry to one U3+ and one P5+ atom.

36 MATERIALS SCIENCE↗

COEX - process: cross-breeding between innovation and industrial experience

Recycling used nuclear fuel at an industrial scale has been a reality for over 40 years. Since it was founded in 1976, AREVA has designed and built two used fuel treatment plants in La Hague, France. These plants, named UP2-800 and UP3, use the PUREX process. UP3 began operations at the end of the 80's and UP2-800 in the mid 90's. The plutonium extracted in UP2-800 and UP3 is then processed in MELOX plant which started operation in 1995, to be recycled under the form of MOX fuel in LWR. This technology has been selected by JNFL for its reprocessing and recycling plants. Rokkasho-Mura reprocessing plant incorporates also some Japanese technologies and is being commissioned soon. Over 23,000 tons of LWR used fuels have been treated in La Hague plants and over 1200 tons of MOX fuels have been produced by MELOX plant. Innovations have been constantly incorporated to these plants to improve process efficiency and to reduce the activity and volume of waste. During these years, AREVA has acquired an invaluable experience in industrializing processes and technologies developed in the laboratory. In the frame of its continuous improvement policy, AREVA has developed jointly with CEA (French Atomic Energy Agency) a new process, COEX{sup TM} process, offering significant improvement in term of proliferation resistance, process performance and investment and operating cost. The present paper recalls the process principles applied in French and Japanese recycling plants. Then it describes the main steps of COEX{sup TM} process, the status of its development and the improvements compared to PUREX process. The possible evolution of COEX{sup TM} process to cope with needs of future nuclear fuel cycles using fast reactors and possible recycling of minor actinides is presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sharing Experiences within AREVA D and D Project Portfolio: Four Illustrations - 13049

Over the past ten years, AREVA has performed D and D operations on a wide range of nuclear sites, such as Marcoule and La Hague recycling plants, to Cadarache MOX fuel fabrication plant or Veurey and Annecy metallic Uranium machining plants. Each site is different from the other but some lessons can be shared through this D and D portfolio. In that respect, knowledge management is one of AREVA D and D Technical Department main missions. Four illustrations demonstrate the interest of knowledge share. Waste management is one of the key activities in D and D; It requires a specific characterization methodology, adapted logistics, and optimized waste channels, all of which have been developed over the years by AREVA teams on the site of Marcoule while they are rather new to La Hague, whose main activity remains fuel reprocessing despite the launch of UP2 400 D and D program. The transfer of know how has thus been organized over the past two years. Plasma cutting has been used extensively in Marcoule for years, while prohibited on the site of La Hague following questions raised about the risks associated wit Ruthenium sublimation. La Hague Technical Department has thus developed an experimental protocol to quantify and contain the Ruthenium risk, the result of which will then be applied to Marcoule where the Ruthenium issue has appeared in recent operations. Commissioning and operating fission products evaporators is a rather standard activity on UP2 800 and UP3, while the associated experience has been decreasing in Marcoule following final shutdown in 1998. When the French atomic Energy commission decided to build and operate a new evaporator to concentrate rinsing effluents prior to vitrification in 2009, AREVA La Hague operators were mobilized to test and commission the new equipment, and train local operators. Concrete scabbling is the final stage prior to the free release of a nuclear facility. In the context of Veurey and Annecy final cleanup and declassification, large scale concrete scabbling operations were conducted, and lead to the industrialization of the process and qualification of a new process, NiThrow{sup TM} scabbling technology, developed by AREVA. This experience has now been injected into La Hague D and D scenario and has allowed a significant gain in time and cost for scabbling operations. In short, the variety of experiences and sites under the responsibility of AREVA D and D teams present significant challenges, and yet provide a unique opportunity to innovate and qualify new tools and methods which can then be shared throughout the sites. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Groundwater table elevation and temperature from 2015 to 2024 at the Lower Montane site in the East River Watershed, Colorado.

This groundwater level elevation and temperature data package is aimed at improving the predictive understanding of hydro-biogeochemical processes at the lower montane site in the East River Watershed, Colorado. The dataset is obtained using pressure transducers placed in shallow wells in the floodplain. This dataset contains data from wells with Location ID's ER-DOW (alias DO1West), ER-DOE (alias DO2East), ER-MBA1 (alias M1Bend1), ER-MBA2 (alias M1Bend2), ER-UPW (alias UP1West), ER-UPM (alias UP2), ER-UPE (alias UP3East). Another dataset contains the data from wells with Location ID's ER-CPA1 to ER-CPA6. Each file contains the water level elevation and the water temperature. Water level elevation has been obtained using the barometric pressure from the pressure transducer (Hobos sensor) in the well, barometric pressure from a sensor in air located at the same site (lower montane), depth from top-of-casing (TOC) to sensor measurement point, and TOC elevation. Data have been checked with a few measurements of water table depths. A real-time kinematic (RTK) global positioning system (GPS) has been used to survey the TOC (data in file Well_Location.csv). The water level elevation is given in UTM13N Geoid2012AB. While depth to water level is not present in the data files, it can be easily calculated with the TOC and distance to ground provided in the GPS coordinate file. The dataset quality is discussed in Collection/Analysis section of the methods. Time-series of measurements were initially added to the archive for the period 2015 to 2019, and later updated with time-series until 2024 (end of data collection). The dataset contains 8 *.csv data files, and 3 *.csv metadata files. Feel free to contact the author with any questions or collaboration interests. The publication year was updated from "2020" to "2025" to reflect the revised version of this dataset.

54 ENVIRONMENTAL SCIENCES↗

Comparison of Industrialized Late 20th Century Flowsheets for Reprocessing Used Nuclear Fuel

This study identified and compared three flowsheets for reprocessing used nuclear fuel (UNF) industrialized in plants in the United Kingdom (the Thermal Oxide Reprocessing Plant), France (UP2-800/UP3) and Japan (the Rokkasho Reprocessing Plant). The study also identified the major implications for a plant in the United States if it were initiated. All flowsheets employed the established Plutonium Uranium Reduction Extraction (PUREX) solvent extraction technology to separate uranium and plutonium from UNF dissolved in nitric acid. However, differences in the approaches to managing iodine-129, tritium and technetium were identified in the flowsheets. A US plant would also need to separate krypton-85 as well as iodine-129 and tritium for immobilization and disposal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Plutonium purification cycle in centrifugal extractors: from flowsheet design to industrial operation

The extension of the UP2 plant at La Hague includes a new plutonium purification cycle using multistage centrifugal extractors to replace the previous cycle that used mixer/settler banks. This type of extractor is suitable for the treatment of fuel containing a high proportion of plutonium-238, as its short residence time limits solvent degradation. This paper deals with the research done to devise its flowsheet, the centrifugal extractors in which it is operated, as well as the feedback of six years of industrial operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

World first in high level waste vitrification - A review of French vitrification industrial achievements

AREVA has more than 30 years experience in operating industrial HLW (High Level radioactive Waste) vitrification facilities (AVM - Marcoule Vitrification Facility, R7 and T7 facilities). This vitrification technology was based on borosilicate glasses and induction-heating. AVM was the world's first industrial HLW vitrification facility to operate in-line with a reprocessing plant. The glass formulation was adapted to commercial Light Water Reactor fission products solutions, including alkaline liquid waste concentrates as well as platinoid-rich clarification fines. The R7 and T7 facilities were designed on the basis of the industrial experience acquired in the AVM facility. The AVM vitrification process was implemented at a larger scale in order to operate the R7 and T7 facilities in-line with the UP2 and UP3 reprocessing plants. After more than 30 years of operation, outstanding record of operation has been established by the R7 and T7 facilities. The industrial startup of the CCIM (Cold Crucible Induction Melter) technology with enhanced glass formulation was possible thanks to the close cooperation between CEA and AREVA. CCIM is a water-cooled induction melter in which the glass frit and the waste are melted by direct high frequency induction. This technology allows the handling of highly corrosive solutions and high operating temperatures which permits new glass compositions and a higher glass production capacity. The CCIM technology has been implemented successfully at La Hague plant.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PAREX, A numerical Code for process design and integration

The modeling approach for process design is illustrated in this paper by the work done to qualify the PAREX code to design the flow sheet of a uranium/plutonium splitting operation in a pulsed column. The different flow sheet experimentations are presented along with the simulation results. The qualified code has been successfully used to design the flow sheet of this operation in the first purification cycle of UP2-800 plant at La Hague. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

La Hague Legacy Waste Recovery Program: Scope, Progress and Issues -12080

A significant inventory of process waste of varying natures and quantities has been generated during the thirty years of operation of UP2 400 facility on the site of La Hague, France. The retrieval, packaging and final storage of such an inventory has never been achieved before in France and thus requires the design and qualification of new processes, equipment, and waste packages. Following AREVA strategic decisions and French safety authority requirements, the legacy waste program has begun around the year 2000 and is scheduled to be completed around the year 2025. It is under the responsibility of AREVA Site Value Development Project teams. For each category of waste to be recovered, AREVA teams conducted detailed investigations, defined recovery modes, treatment processes, as well as final waste package forms, which they subsequently submitted to French safety and waste management authorities. A Task force initiative was subsequently launched to optimize the program cost and scenario, and lead to an optimization of about 15% of the entire program. The qualification of processes and waste packages required a significant amount of research and development which is now well under way for processes, and scheduled to be completed in 2015. Preparation work has begun on several installations to clear space for the construction of future retrieval facilities, scheduled to begin in the coming three years. La Hague Legacy waste retrieval program represents a significant challenge in the sense that it covers a significant variety and quantity of waste needing recovery and reconditioning, with tight financial objectives and a binding recovery schedule. During the past five years, AREVA SVD successfully conducted design, research, development, and qualification activities which lead to the definition of qualified processes and waste packages for each retrieval program. Preparation work and supplier consultations are now on-going, in order to meet our objectives of beginning retrieval operations in compliance with our commitments to the safety authorities, in 2015 and 2016. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

La Hague STE2 Sludge Retrieval and Conditioning Strategy - 19229

About 9000 m{sup 2} of Long-Lived Intermediate Level Waste LL-ILW STE2 sludges have been generated by the reprocessing operations of UNGG and later UOx fuel in La Hague (UP2-400) and subsequent liquid effluent treatment. They were placed into a set of adjoining tanks, called the STE2 silos. Today, the STE2 Sludges have to be retrieved and conditioned for final disposal in the deep geological repository under development in France (Cigeo). To this end, since the early 2000's, different retrieval and conditioning scenarios have been evaluated. This paper tracks the history of the technical and non-technical key factors having led to the choice of the baseline scenario developed until the end of 2016, describes the technical achievements and makes a state-of the art of the current scenario consisting in retrieving and temporarily storing STE2 sludges and, meanwhile, studying, researching and testing final conditioning processes and technologies in the aim of achieving a technical and economic optimum. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Plans for Treatment of Research Reactor Used Fuels at La Hague - 19507

Over the past decades, Orano (formerly AREVA) has been transporting, unloading, storing, and reprocessing research reactor spent fuel (RRSF) in its French facilities and with its equipment. This experience has resulted in the transportation and industrial-scale reprocessing of over 23 tons of RRSF (mainly of the Al type) at Orano's facilities in France, both in the Marcoule and the La Hague plants. In order to meet its customers growing needs in terms of RRSF management, Orano is developing new RRSF reprocessing capacities for the La Hague UP2-800 facility utilizing the lessons learned from the reprocessing of the current RRSF. This new facility is called the Traitement des Combustibles Particuliers or TCP and was introduced last year. The TCP is planned to reprocess several types of RRSF, including both Al and U{sub 3}Si{sub 2} RRSF, and in the future may also be useful in the support of reprocessing LWR and fast reactor MOX fuels. The focus of the TCP is on developing shearing and dissolution processes for these fuel types that can be incorporated into, and operated along with, the existing La Hague facilities. This paper will cover each of the stages of the current reprocessing of RRSF at La Hague from its transportation to La Hague to its post-reprocessing vitrified waste production, provide an update on its status, and identifying the areas where the TCP will better facilitate the reprocessing of the RRSF. Ultimately, this paper illustrates the innovative solutions available to modify existing recycling/reprocessing facilities to address pseudo-unique used nuclear fuel (UNF) forms to improve/simplify back-end UNF management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗