Search NASA⌕ Search

SEARCH · Search NASA

Results for “UP3”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Materials Data on UP3 by Materials Project

UP3 crystallizes in the hexagonal P6_3/mmc space group. The structure is three-dimensional. U3+ is bonded to twelve equivalent P1- atoms to form a mixture of distorted face and corner-sharing UP12 cuboctahedra. There are six shorter (2.71 Å) and six longer (2.98 Å) U–P bond lengths. P1- is bonded in a 6-coordinate geometry to four equivalent U3+ and two equivalent P1- atoms. Both P–P bond lengths are 2.46 Å.

36 MATERIALS SCIENCE↗

Dismantling of the 904 Cell at the HAO/Sud Facility - 13466

La Hague facility, in France, is the spent fuel recycling plant wherein a part of the fuel coming from some of the French, German, Belgian, Swiss, Dutch and Japanese nuclear reactors is reprocessed before being recycled in order to separate certain radioactive elements. The facility has been successively handled by the CEA (1962-1978), Cogema (1978-2006), and AREVA NC (since 2006). La Hague facility is composed of 3 production units: The UP2-400 production unit started to be operated in 1966 for the reprocessing of UNGG metal fuel. In 1976, following the dropout of the graphite-gas technology by EDF, an HAO workshop to reprocess the fuel from the light water reactors is affiliated and then stopped in 2003. - UP2-400 is partially stopped in 2002 and then definitely the 1 January 2004 and is being dismantled - UP2-800, with the same capacity than UP3, started to be operated in 1994 and is still in operation. And UP3 - UP3 was implemented in 1990 with an annual reprocessing capacity of 800 tons of fuel and is still in operation The combined licensed capacity of UP2-800 and UP3 is 1,700 tons of used fuel. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Materials Data on UP3H10ClO8 by Materials Project

(UP3(H5O4)2)2Cl2 crystallizes in the orthorhombic Pbcm space group. The structure is two-dimensional and consists of four hydrochloric acid molecules and two UP3(H5O4)2 sheets oriented in the (0, 0, 1) direction. In each UP3(H5O4)2 sheet, U4+ is bonded in a 8-coordinate geometry to eight O2- atoms. There are a spread of U–O bond distances ranging from 2.29–2.50 Å. There are two inequivalent P+2.33+ sites. In the first P+2.33+ site, P+2.33+ is bonded in a distorted tetrahedral geometry to two equivalent H+0.60+ and two O2- atoms. Both P–H bond lengths are 1.41 Å. Both P–O bond lengths are 1.53 Å. In the second P+2.33+ site, P+2.33+ is bonded in a distorted tetrahedral geometry to two H+0.60+ and two O2- atoms. Both P–H bond lengths are 1.41 Å. There is one shorter (1.52 Å) and one longer (1.53 Å) P–O bond length. There are five inequivalent H+0.60+ sites. In the first H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one P+2.33+ atom. In the second H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one O2- atom. The H–O bond length is 0.98 Å. In the third H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one P+2.33+ atom. In the fourth H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one O2- atom. The H–O bond length is 0.99 Å. In the fifth H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one P+2.33+ atom. There are five inequivalent O2- sites. In the first O2- site, O2- is bonded in a distorted linear geometry to one U4+ and one P+2.33+ atom. In the second O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one U4+ and one P+2.33+ atom. In the third O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one U4+ and one P+2.33+ atom. In the fourth O2- site, O2- is bonded in a water-like geometry to one U4+ and two H+0.60+ atoms. In the fifth O2- site, O2- is bonded in a distorted linear geometry to one U4+ and one P+2.33+ atom.

36 MATERIALS SCIENCE↗

Materials Data on UP3H10BrO8 by Materials Project

UP3(H5O4)2Br crystallizes in the orthorhombic Pbcm space group. The structure is two-dimensional and consists of four hydrobromic acid molecules and two UP3(H5O4)2 sheets oriented in the (0, 0, 1) direction. In each UP3(H5O4)2 sheet, U4+ is bonded in a 8-coordinate geometry to eight O2- atoms. There are a spread of U–O bond distances ranging from 2.28–2.52 Å. There are two inequivalent P+2.33+ sites. In the first P+2.33+ site, P+2.33+ is bonded in a distorted tetrahedral geometry to two H+0.60+ and two O2- atoms. Both P–H bond lengths are 1.42 Å. There is one shorter (1.52 Å) and one longer (1.53 Å) P–O bond length. In the second P+2.33+ site, P+2.33+ is bonded in a distorted tetrahedral geometry to two equivalent H+0.60+ and two O2- atoms. Both P–H bond lengths are 1.41 Å. Both P–O bond lengths are 1.53 Å. There are five inequivalent H+0.60+ sites. In the first H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one P+2.33+ atom. In the second H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one P+2.33+ atom. In the third H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one O2- atom. The H–O bond length is 0.98 Å. In the fourth H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one P+2.33+ atom. In the fifth H+0.60+ site, H+0.60+ is bonded in a single-bond geometry to one O2- atom. The H–O bond length is 0.99 Å. There are five inequivalent O2- sites. In the first O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one U4+ and one P+2.33+ atom. In the second O2- site, O2- is bonded in a distorted linear geometry to one U4+ and one P+2.33+ atom. In the third O2- site, O2- is bonded in a distorted linear geometry to one U4+ and one P+2.33+ atom. In the fourth O2- site, O2- is bonded in a water-like geometry to one U4+ and two H+0.60+ atoms. In the fifth O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one U4+ and one P+2.33+ atom.

36 MATERIALS SCIENCE↗

ORNL Pre-test Analyses of A Large-scale Experiment in STYLE

Oak Ridge National Laboratory (ORNL) is conducting a series of numerical analyses to simulate a large scale mock-up experiment planned within the European Network for Structural Integrity for Lifetime Management non-RPV Components (STYLE). STYLE is a European cooperative effort to assess the structural integrity of (non-reactor pressure vessel) reactor coolant pressure boundary components relevant to ageing and life-time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. ORNL contributes work-in-kind support to STYLE Work Package 2 (Numerical Analysis/Advanced Tools) and Work Package 3 (Engineering Assessment Methods/LBB Analyses). This paper summarizes the current status of ORNL analyses of the STYLE Mock-Up3 large-scale experiment to simulate and evaluate crack growth in a cladded ferritic pipe. The analyses are being performed in two parts. In the first part, advanced fracture mechanics models are being developed and performed to evaluate several experiment designs taking into account the capabilities of the test facility while satisfying the test objectives. Then these advanced fracture mechanics models will be utilized to simulate the crack growth in the large scale mock-up test. For the second part, the recently developed ORNL SIAM-PFM open-source, cross-platform, probabilistic computational tool will be used to generate an alternative assessment for comparison with the advanced fracture mechanics model results. The SIAM-PFM probabilistic analysis of the Mock-Up3 experiment will utilize fracture modules that are installed into a general probabilistic framework. The probabilistic results of the Mock-Up3 experiment obtained from SIAM-PFM will be compared to those results generated using the deterministic 3D nonlinear finite-element modeling approach. The objective of the probabilistic analysis is to provide uncertainty bounds that will assist in assessing the more detailed 3D finite-element solutions and to also assess the level of confidence that can be placed in the best-estimate finiteelement solutions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis Of Ductile Crack Growth In Pipe Test In STYLE Project

The Oak Ridge National Laboratory (ORNL) is conducting structural analyses, both deterministic and probabilistic, to simulate a large scale mock-up experiment planned within the European Network for Structural Integrity for Lifetime Management non-RPV Components (STYLE). The paper summarizes current ORNL analyses of STYLE s Mock-up3 experiment to simulate/evaluate ductile crack growth in a cladded ferritic pipe. Deterministic analyses of the large-scale bending test of ferritic surge pipe, with an internal circumferential crack, are simulated with a number of local micromechanical approaches, such as Gurson-Tvergaard-Needleman (GTN) model and cohesive-zone model. Both WARP 3D and ABAQUS general purpose finite element programs are being used to predict the failure load and the failure mode, i.e. ductile tearing or net-section collapse, as part of the pre-test phase of the project. Companion probabilistic analyses of the experiment are utilizing the ORNL developed open-source Structural Integrity Assessment Modular - Probabilistic Fracture Mechanics (SIAM-PFM) framework. SIAM-PFM contains engineering assessment methodology such as the tearing instability (J-T analysis) module developed for inner surface cracks under bending load. The driving force J-integral estimations are based on the SC.ENG1 or SC.ENG2 models. The J-A2 methodology is used to transfer (constraint-adjust) J-R curve material data from standard test specimens to the Mock-up3 experiment configuration. The probabilistic results of the Mock-Up3 experiment obtained from SIAM-PFM will be compared to those generated using the deterministic finite element modeling approach. The objective of the probabilistic analysis is to provide uncertainty bounds that will assist in assessing the more detailed 3D finite-element solutions and to also assess the level of confidence that can be placed in the best-estimate finite-element solutions.

99 GENERAL AND MISCELLANEOUS↗

COEX - process: cross-breeding between innovation and industrial experience

Recycling used nuclear fuel at an industrial scale has been a reality for over 40 years. Since it was founded in 1976, AREVA has designed and built two used fuel treatment plants in La Hague, France. These plants, named UP2-800 and UP3, use the PUREX process. UP3 began operations at the end of the 80's and UP2-800 in the mid 90's. The plutonium extracted in UP2-800 and UP3 is then processed in MELOX plant which started operation in 1995, to be recycled under the form of MOX fuel in LWR. This technology has been selected by JNFL for its reprocessing and recycling plants. Rokkasho-Mura reprocessing plant incorporates also some Japanese technologies and is being commissioned soon. Over 23,000 tons of LWR used fuels have been treated in La Hague plants and over 1200 tons of MOX fuels have been produced by MELOX plant. Innovations have been constantly incorporated to these plants to improve process efficiency and to reduce the activity and volume of waste. During these years, AREVA has acquired an invaluable experience in industrializing processes and technologies developed in the laboratory. In the frame of its continuous improvement policy, AREVA has developed jointly with CEA (French Atomic Energy Agency) a new process, COEX{sup TM} process, offering significant improvement in term of proliferation resistance, process performance and investment and operating cost. The present paper recalls the process principles applied in French and Japanese recycling plants. Then it describes the main steps of COEX{sup TM} process, the status of its development and the improvements compared to PUREX process. The possible evolution of COEX{sup TM} process to cope with needs of future nuclear fuel cycles using fast reactors and possible recycling of minor actinides is presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Recycling facility periodic safety review: Application of a methodology used for the nuclear criticality safety review of geometrically safe or favorable equipment - 14610

In France, for all fuel cycle facilities, the reference safety frame is continuously adapted to take into account technical developments such as changes in process and/or maintenance operations. Every ten years according to French law, the facility operator is required to launch a process of Periodic Safety Review (PSR), whose conclusions are sent to the Nuclear Safety Authority (NSA). This PSR is split in two parts: first, a review of the facility to its safety documentation and authorization, second, a safety reassessment. Actually, this PSR takes account for topics (actual aging for instance) which require several years of feedback from experience to be integrated in safety evaluations, or which cannot be done on a daily basis (documentation reorganization). It also incorporates the new regulatory safety requirements. A specific methodology was developed for the first PSR of UP3-A since the publication of the law. UP3-A is a used fuel reprocessing facility of La Hague plant. This methodology, adapted for large plants with numerous process and fissile media, is based on a two-step approach intending to focus the analysis on the real hard spots. First, 'sensitive' systems are identified. Second, a specific review is performed on these systems. After a reminder of the methodology, this paper presents the results of its application on the UP3-A scope. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sharing Experiences within AREVA D and D Project Portfolio: Four Illustrations - 13049

Over the past ten years, AREVA has performed D and D operations on a wide range of nuclear sites, such as Marcoule and La Hague recycling plants, to Cadarache MOX fuel fabrication plant or Veurey and Annecy metallic Uranium machining plants. Each site is different from the other but some lessons can be shared through this D and D portfolio. In that respect, knowledge management is one of AREVA D and D Technical Department main missions. Four illustrations demonstrate the interest of knowledge share. Waste management is one of the key activities in D and D; It requires a specific characterization methodology, adapted logistics, and optimized waste channels, all of which have been developed over the years by AREVA teams on the site of Marcoule while they are rather new to La Hague, whose main activity remains fuel reprocessing despite the launch of UP2 400 D and D program. The transfer of know how has thus been organized over the past two years. Plasma cutting has been used extensively in Marcoule for years, while prohibited on the site of La Hague following questions raised about the risks associated wit Ruthenium sublimation. La Hague Technical Department has thus developed an experimental protocol to quantify and contain the Ruthenium risk, the result of which will then be applied to Marcoule where the Ruthenium issue has appeared in recent operations. Commissioning and operating fission products evaporators is a rather standard activity on UP2 800 and UP3, while the associated experience has been decreasing in Marcoule following final shutdown in 1998. When the French atomic Energy commission decided to build and operate a new evaporator to concentrate rinsing effluents prior to vitrification in 2009, AREVA La Hague operators were mobilized to test and commission the new equipment, and train local operators. Concrete scabbling is the final stage prior to the free release of a nuclear facility. In the context of Veurey and Annecy final cleanup and declassification, large scale concrete scabbling operations were conducted, and lead to the industrialization of the process and qualification of a new process, NiThrow{sup TM} scabbling technology, developed by AREVA. This experience has now been injected into La Hague D and D scenario and has allowed a significant gain in time and cost for scabbling operations. In short, the variety of experiences and sites under the responsibility of AREVA D and D teams present significant challenges, and yet provide a unique opportunity to innovate and qualify new tools and methods which can then be shared throughout the sites. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

World first in high level waste vitrification - A review of French vitrification industrial achievements

AREVA has more than 30 years experience in operating industrial HLW (High Level radioactive Waste) vitrification facilities (AVM - Marcoule Vitrification Facility, R7 and T7 facilities). This vitrification technology was based on borosilicate glasses and induction-heating. AVM was the world's first industrial HLW vitrification facility to operate in-line with a reprocessing plant. The glass formulation was adapted to commercial Light Water Reactor fission products solutions, including alkaline liquid waste concentrates as well as platinoid-rich clarification fines. The R7 and T7 facilities were designed on the basis of the industrial experience acquired in the AVM facility. The AVM vitrification process was implemented at a larger scale in order to operate the R7 and T7 facilities in-line with the UP2 and UP3 reprocessing plants. After more than 30 years of operation, outstanding record of operation has been established by the R7 and T7 facilities. The industrial startup of the CCIM (Cold Crucible Induction Melter) technology with enhanced glass formulation was possible thanks to the close cooperation between CEA and AREVA. CCIM is a water-cooled induction melter in which the glass frit and the waste are melted by direct high frequency induction. This technology allows the handling of highly corrosive solutions and high operating temperatures which permits new glass compositions and a higher glass production capacity. The CCIM technology has been implemented successfully at La Hague plant.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗