Panel Session 2: Hot Topics in US DOE Environmental Management

The well-attended Panel Session was chaired by Martin Schneider. The four panelists did not provide presentations. Rather the session was a discussion focusing on pressing issues facing US DOE Environmental Management (EM) sites and how the program is moving forward. The session began by momentarily reflecting on a success: the three Tank Waste Treatment Facilities will soon be coming online. These three facilities will treat as much waste in two years as was treated in the past 30 years. That is a significant milestone in progress. Also, safety enhancements at WIPP are a big success. The panelists noted that there will be challenges with the victories of the startup of the Waste Treatment Facilities. Treating tank waste is the last EM mission and will help with the relationships with the stakeholders, regulators and Congress. One of the biggest challenges will be moving back to full operation mode. Although the operation will increase productivity of reducing/managing the tank waste, it will decrease life cycle cost and lessen years of cleanup. The challenge will be having people understand that EM will be operating 24/7 and that maintenance will be key in keeping the operations. EM will be working together with the regulators to show tangible progress that will be effective and efficient. By working together, they can find opportunities/technologies for streamlining and accelerating cleanup. Recent changes to the regulatory framework between DOE-EM Los Alamos Field Office and New Mexico Environmental Department have helped cleanup in Los Alamos. Every year EM and the agencies review progress and come to agreements on the next work priorities. At Savannah River Site, the Federal Facility Agreement among EM, South Carolina Department of Health and Environmental Control, and Environmental Protection Agency (EPA) has developed a small core team that work are shared by together in resolving issues that come up. The discussion moved on to how progress can be made by sharing lessons learned among the contractors. An example of how these learned lessons can be shared is that key representatives from projects across the EM sites participate in various forums to review/contribute to the work planned. Other opportunities can be by temporary assignments of DOE staff to gain experience and by monthly EM Headquarters report that provide the lessons learned across the EM sites. The panelists discussed how skyline changes are the best examples of tangible progress. Decontamination and Demolition (D and D) of structures are the easiest tangible progress that can be seen. Whereas tank waste cleanup is the hardest to see. Disposal of waste onsite versus offsite is another challenge, and timely discussions are necessary to get to the best value to the government.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 12: Effective Aspects of the 2016 Consent Order between DOE-EM-LA Field Office - NM Environment Department and Identifying Comparable Approaches

This panel focused on the extremely effective 2016 Compliance Order on Consent executed between the US Department of Energy (DOE) Office of Environmental Management - Los Alamos Field Office (EM-LA) and the New Mexico Environment Department (NMED) and highlights practices and concepts toward developing an environmental compliance agreement that is mutually productive to both the NMED and the DOE. To further demonstrate successful practices, the panel also highlighted another very effective compliance agreement with comparable approaches - the 1993 Savannah River Site (SRS) Federal Facility Agreement (FFA) executed between DOE, the South Carolina Department of Health and Environmental Control (SCDHEC), and the Environmental Protection Agency (EPA). EM-LA, NMED, SRS, and SCDHEC representatives provided attendees an opportunity to understand and compare extremely effective approaches to regulatory compliance across the complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Immobilized Low-Activity Waste Transportation System Testing Results - 20043

The immobilized low-activity waste (ILAW) transportation system is a first-of-a-kind system that is being designed and tested to transport ILAW glass-filled containers from Hanford's Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility to the Integrated Disposal Facility (IDF) burial trench for permanent disposal. A prototype design and fabrication of one transport trailer and four engineered ILAW pallets was completed in mid-2018. Prototype qualification testing to verify adequacy of the design was completed in 2019 by Washington River Protection Solutions (WRPS) and affiliate ATKINS SNC-Lavalin Group. Prototype testing was completed to advance design maturation across all operational and facility interfaces, and under adverse environmental and operating conditions, including thermal assessment of the system at peak projected temperatures. Test design, observation, and feedback was well represented and supported by all ILAW Transportation System interfacing organizations: WTP constructor Bechtel National, Inc.; IDF operator CH2M (CHPRC); transportation contractor Mission Support Alliance (MSA); the U. S. Department of Energy Richland Operations Office (DOE/RL) and Office of River Protection (DOE/ORP); and Washington State Department of Ecology. This paper presents the results of prototype qualification testing and opportunities for design improvements based on testing. Changes to the final design as a result of prototype testing include improvements in safety, ergonomics, operational flexibility, and As-Low-As-Reasonably-Achievable (ALARA) applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 55: US DOE Savannah River Operations Office: Liquid Waste Progress

This panel provided an overview of the SRS HLW Liquid Waste Program (history, challenges, opportunities, and future) including discussions of the Defense Waste Processing Facility (DWPF), Tank Closures, Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit, Tank Closure Cesium Removal, and the Salt Waste Processing Facility (SWPF). Panelists with presentations: SRS Liquid Waste Program (James Folk); SRS Liquid Waste Progress (Mark Schmitz); Salt Waste Processing Facility (Frank Sheppard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos national Laboratory - 20395

With the establishment in 2018 of the Los Alamos Legacy Cleanup Contract, the Department of Energy's (DOE) Environmental Management Los Alamos Field Office (EM-LA) and its contractor Newport News Nuclear BWXT Los Alamos (N3B) embarked on an expansive program to engage a broad range of local and regional stakeholders in the decision-making process for cleanup of legacy wastes (pre-1999) at the Los Alamos National Laboratory (LANL). From the inception of LANL during the Manhattan Project until the issuance of the new cleanup contract, the site was managed by a single management and operations (M and O) contactor whose main focus was national security. Segmenting from laboratory operations a separate cleanup contract managed by DoE's Office of Environmental Management (EM) brought new opportunities for the cleanup of legacy waste. That change likewise has opened new opportunities for engaging the community on legacy cleanup decisions. The new legacy cleanup contract - an unclassified contract - emphasizes public outreach, marking a cultural shift in how stakeholders in Los Alamos and throughout northern New Mexico are engaged. Without the constraints of classified work, EM-LA and N3B have increased the level of transparency with the public regarding cleanup activities. EM-LA and N3B have crafted an approach that best meets the values, priorities and needs of the neighboring communities by adapting the model successfully employed at Rocky Flats. Through enhanced stakeholder involvement, EM-LA will implement decisions that have considered broad input and deliver a safe and efficient cleanup of the site. EM-LA and N3B began the expanded stakeholder outreach program in January 2019, leading up to four Environmental Management Cleanup Forums held in the summer of 2019. EM-LA and N3B are now in the process of initiating a series of meetings with various stakeholder groups to determine their 'values' as they relate to cleanup using a novel approach that elicits and records values. The entire process is documented, ensuring that should questions arise about how, when and why decisions were made, they can be easily addressed. In addition to other public meetings to present cleanup scenarios and solicit active public involvement in cleanup decisions, the EM-LA and N3B approach involves discussions with stakeholders who want to explore specific technical issues and cleanup discussions in depth. EM-LA and N3B are also evaluating and implementing a variety of communications tools to help ensure the engagement plan sets the gold standard for transparency in legacy cleanup and stakeholder involvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Mixed Waste Treatment Project Overcomes Challenges to Complete Treatment of Debris Waste - 20616

The Advanced Mixed Waste Treatment Project (AMWTP), operated by Fluor Idaho for the Department of Energy Idaho Operations Office, completed the last of its debris waste treatment in the fall of 2019. Concluding that work-scope was certainly not without its challenges. Fluor Idaho and its employees had to adapt to treating extremely challenging waste types, such as high-fissile gram materials and potentially pyrophoric and reactive wastes coming down the stretch. It also had to complete the sizing of large waste boxes from Mound Laboratories in inner-contamination enclosures designed to capture the extremely fine, 'flighty' plutonium-238 in its high-efficiency particulate air filters. Very few waste treatment facilities in the DOE Complex have completed their missions. In fact, most large-scale waste treatment facilities are still under construction with many months or years remaining before 'hot operations' begin. AMWTP is unique because it functioned as a 'one-stop shop.' Transuranic and low-level waste characterization, treatment, certification, and shipping all occurred there. AMWTP concluded the most challenging part of its mission and will continue to ship material out of the state of Idaho for the next decade. This paper will provide a background of the AMWTP mission, and the adaptations to its operating permit, equipment, or treatment processes to address challenging waste types. AMWTP will leave behind a legacy of being one of the most successful waste treatment facilities in the history of the DOE Complex. The facility was well-conceived, well-constructed, and well-executed; it was done right from start to finish. During the course of its waste treatment mission, the facility was required to adapt to changing conditions by treating extremely challenging waste types. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 34: US DOE Featured Site: Savannah River Operations Office: 70 Years of Service

The Savannah River Site celebrates its 70. anniversary on November 28, 2020. On this date in 1950, President Harry S. Truman requested the Dupont Company to design, build and operate what was then known as the Savannah River Plant in response to the Soviet Union's detonation of its first atomic weapon, which set the Cold War into motion. During the 1950's, six South Carolina towns were relocated for the construction of SRS and by 1953, the 310 square mile site was complete. Nearly 40,000 workers were employed t build five nuclear reactors and support facilities, two chemical separations plants, heavy water extraction plant, nuclear fuel and target fabrication facility tritium extraction facility and waste management facilities. SRS played a key role in winning the Cold War and for seven decades, SRS has been a leader within the DOE complex. Today, the site supports environmental stewardship and maintains the nation's nuclear deterrent while ensuring the safekeeping and disposal of domestic and international nuclear materials. The site continues to support the nation's nuclear defense as it explores new potential NNSA missions. SRS has a proud 70- year history and looks forward to a future of service as a national asset and strong community partner. The session was kicked off with a video message from Secretary of Energy, Dan Brouillette, who thanked employees past and current for their efforts. The video also provided an overview of the history and future of the Site. This panel provided an overview of the Savannah River Site's 70 years of service (history, challenges, opportunities, and future) presented by the SRS's Senior leadership and the local Aiken, South Carolina Mayor. Panelists with presentations: US DOE Secretary Dan Brouillette's Overview of DOE and SRS - A Legacy of 70 Years of Service (Amy Boyette); 70 Years of Service (Michael Budney); 70 Years of Service (Stuart MacVean); SRS Liquid Waste (Thomas Foster); National Nuclear Security Administration (Nicole Nelson-Jean)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposition of Newly Generated Transuranic Waste at ORNL - 20107

ORNL operates the High Flux Isotope Reactor, which provides a high neutron source for production of isotopes for medical, industrial, and nuclear research programs and is the US DoE's center for production, storage, and distribution for TRU isotopes (plutonium through californium). Operation of these facilities results in the generation of CH-TRU and RH-TRU waste for disposal at the WIPP. This paper describes the program ORNL is implementing in collaboration with the Carlsbad Field Office National TRU Program Difficult Waste Team to disposition newly generated TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Atmospheric Radiation Measurement (ARM) airborne field campaign data products between 2013 and 2018

Airborne measurements are pivotal for providing detailed, spatiotemporally resolved information about atmospheric parameters and aerosol and cloud properties, thereby enhancing our understanding of dynamic atmospheric processes. For 30 years, the US Department of Energy (DOE) Office of Science supported an instrumented Gulfstream 1 (G-1) aircraft for atmospheric field campaigns. Data from the final decade of G-1 operations were archived by the Atmospheric Radiation Measurement (ARM) Data Center and made publicly available at no cost to all registered users. To ensure a consistent data format and to improve the accessibility of the ARM airborne data, an integrated dataset was recently developed covering the final 6 years of G-1 operations (2013 to 2018, https://doi.org/10.5439/1999133; Mei and Gaustad, 2024). The integrated dataset includes data collected from 236 flights (766.4 h), which covered the Arctic, the US Southern Great Plains (SGP), the US West Coast, the eastern North Atlantic (ENA), the Amazon Basin in Brazil, and the Sierras de Córdoba range in Argentina. These comprehensive data streams provide much-needed insight into spatiotemporal variability in the thermodynamic quantities and aerosol and cloud properties for addressing essential science questions in Earth system process studies. This paper describes the DOE ARM merged G-1 datasets, including information on the acquisition, data collection challenges and future potentials, and quality control processes. It further illustrates the usage of this merged dataset to evaluate the Energy Exascale Earth System Model (E3SM) with the Earth System Model Aerosol–Cloud Diagnostics (ESMAC Diags) package.

54 ENVIRONMENTAL SCIENCES↗

Status of the Top Plate and Anticryostat for High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. This facility will be located at Fermilab and will have a capability similar to EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15T in HFVMTF will be produced by a magnet pro-vided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences. As a primary use it will be superconducting cable test facility, in high magnetic fields and wide range of temperatures. Complementary, this facility will be used to test high-field super-conducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of Top Plates Assembly and Sample Insert Anticryostat, which will be a main interface component between cable test mode and magnet test mode at this facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of the High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. The background magnetic field of 15 T in the HFVMTF will be produced by a magnet provided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics (HEP), and Fusion Energy Sciences (FES), and will serve as a superconducting cable test facility in high magnetic fields and a wide range of temperatures for HEP and FES communities. This facility will also be used to test high-field superconducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of the facility, including construction, cryostat designs, top and lambda plates, and systems for powering, and quench protection and monitoring.

43 PARTICLE ACCELERATORS↗

Current Status of the High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are collaborating to construct a new High Field Vertical Magnet Test Facility (HFVMTF) designed for testing superconducting cables in high magnetic fields. This state-of-the-art facility will be situated at Fermilab and will provide capabilities comparable to EDIPO at PSI and FRESCA2 at CERN. The HFVMTF’s background magnetic field, reaching 15 T, will be generated by a magnet supplied by LBNL. The HFVMTF is a collaborative effort supported by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences. It will serve as a vital testbed for superconducting HTS cables, subjecting them to high magnetic fields and a wide range of temperatures, benefiting both scientific communities. Additionally, this facility will play a key role in testing high-field superconducting magnet models and demonstrators, including hybrid magnets, developed by the US Magnet Development Pro gram (MDP). These hybrid magnets, utilizing both LTS and HTS superconductors, are significant advancements toward achieving 18+ T dipoles for future hadron-hadron colliders. The presentation outlines the current status of the facility, covering aspects such as construction progress, cryostat designs, top and lambda plates, and systems for powering, quench protection, and monitoring.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Magnetic and electric field meters developed for the US Department of Energy

This report describes work done at the Jet Propulsion Laboratory for the Office of Energy Storage and Distribution of DOE on the measurement of power line fields. A magnetic field meter is discussed that uses fiber optics to couple a small measuring probe to a remote readout device. The use of fiber optics minimizes electric field perturbation due to the presence of the probe and provides electric isolation for the probe, so that it could be used in a high field or high voltage environment. Power to operate the sensor electronics is transferred via an optical fiber, and converted to electrical form by a small photodiode array. The fundamental, the second and third harmonics of the field are filtered and separately measured, as well as the broadband rms level of the field. The design of the meter is described in detail and data from laboratory tests are presented. The report also describes work done to improve the performance of a DC bushing in a Swedish factory, using the improved meter. The DC electric fields are measured with synchronous detection to provide field magnitude data in two component directions.