Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Managing uncertainty in data-driven simulation-based optimization

Optimization using data from complex simulations has become an attractive decision-making option, due to ability to embed high-fidelity, non-linear understanding of processes within the search for optimal values. Due to lack of tractable algebraic equations, the link between simulations and optimization is oftentimes a surrogate metamodel. However, several forms of uncertainty exist within the cycle that links simulation data, to metamodels, to optimization. Uncertainty may originate from parameters of the simulation, or the form and fitted parameters of the metamodel. This paper reviews different literatures that are relevant to surrogate-based optimization and proposes different strategies for handling uncertainty, by combining machine learning with stochastic programming, robust optimization, and discrepancy modeling. We show that incorporating uncertainty management within simulation-based optimization leads to more robust solutions, which protect the decision-maker from infeasible solutions. Here, we present the results of our proposed approaches through a case study for direct-air capture through temperature swing adsorption.

42 ENGINEERING↗

Decentralized wind uncertainty management: Alternating direction method of multipliers based distributionally-robust chance constrained optimal power flow

How to manage wind power uncertainty in system operation is an urgent and important issue, especially under substantially increasing penetration levels of wind generation in electric power systems. With increasing numbers of wind power plants (WPPs) integrated into power systems, their variability and uncertain power outputs become a challenge to maintaining system reliability. Traditional stochastic optimization-based models face the curse of dimensionality when the number of WPPs increases. This paper proposes a novel decentralized wind power uncertainty management model. In this model, conventional generators optimize their power capacity output and their participation to mitigate wind power uncertainty locally with only limited information exchange with the system operators. First, a distributionally-robust chance-constrained optimal power flow (DRCC-OPF) model is deployed to schedule the generation and reserve considering the wind power forecast uncertainty. Then, the alternating direction method of multipliers (ADMM) is used to reformulate the DRCC-OPF model into the distributed optimization model for each conventional generator and WPP. The tests on a small PJM 5-bus system and the IEEE 118-bus system demonstrate that the proposed decentralized model can increase the operation reliability without sacrificing system operating cost, especially when the wind power penetration levels are high. Using the proposed model, the optimal solutions can be obtained within one minute, for all studied cases, which verifies the computation efficiency of the proposed decentralized model. Furthermore, considering a large number of WPPs integrated into the system, the proposed decentralized method obtains a lower operating cost within one minute which demonstrates its efficiency to deal with high dimension of uncertainties.

17 WIND ENERGY↗

An Uncertainty Management Framework for Integrated Gas-Electric Energy Systems

In many parts of the world, electric power systems have seen a significant shift toward generation from renewable energy and natural gas. Because of their ability to flexibly adjust power generation in real time, gas-fired power plants are frequently seen as the perfect partner for variable renewable generation. However, this reliance on gas generation increases interdependence and propagates uncertainty between power grids and gas pipelines and brings coordination and uncertainty management challenges. To address these issues, we propose an uncertainty management framework for uncertain, but bounded gas consumption by gas-fired power plants. The admissible ranges are computed based on a joint optimization problem for the combined gas and electricity networks, which involves chance-constrained scheduling for the electric grid and a novel robust optimization formulation for the natural-gas network. This formulation ensures feasibility of the integrated system with a high probability, while providing a tractable numerical formulation. A key advance with respect to existing methods is that our method is based on a physically accurate, validated model for transient gas pipeline flows. Our case study benchmarks our proposed formulation against methods that ignore how reserve activation impacts the fuel use of gas power plants and only consider predetermined gas consumption. Here, the results demonstrate the importance of considering uncertainty to avoid operating constraint violations and curtailment of gas to the generators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Uncertainty management in intelligent design aiding systems

A novel approach to uncertainty management which is particularly effective in intelligent design aiding systems for large-scale systems is presented. The use of this approach in the materials handling system design domain is discussed. It is noted that, during any point in the design process, a point value can be obtained for the evaluation of feasible designs; however, the techniques described provide unique solutions for these point values using only the current information about the design environment.

Brown, Donald E.↗

Uncertainty Management for Diagnostics and Prognostics of Batteries using Bayesian Techniques

Uncertainty management has always been the key hurdle faced by diagnostics and prognostics algorithms. A Bayesian treatment of this problem provides an elegant and theoretically sound approach to the modern Condition- Based Maintenance (CBM)/Prognostic Health Management (PHM) paradigm. The application of the Bayesian techniques to regression and classification in the form of Relevance Vector Machine (RVM), and to state estimation as in Particle Filters (PF), provides a powerful tool to integrate the diagnosis and prognosis of battery health. The RVM, which is a Bayesian treatment of the Support Vector Machine (SVM), is used for model identification, while the PF framework uses the learnt model, statistical estimates of noise and anticipated operational conditions to provide estimates of remaining useful life (RUL) in the form of a probability density function (PDF). This type of prognostics generates a significant value addition to the management of any operation involving electrical systems.

Saha, Bhaskar↗

Solar Uncertainty Management and Mitigation for Exceptional Reliability in Grid Operations (SUMMER-GO): Project Final Report

The Solar Uncertainty Management and Mitigation for Exceptional Reliability in Grid Operation (SUMMER-GO) project was recently completed through a collaboration among the National Renewable Energy Laboratory, Maxar, the Electric Reliability Council of Texas (ERCOT), the University of Texas at Dallas, the University of California Berkeley, and the University of Colorado Boulder. The project made significant advances in probabilistic solar power forecasting, both through the development of Bayesian model averaging methods for ensemble forecasting and in bringing these and other advancements into practice with Maxar's delivery of operational forecasts to ERCOT. In addition to creating more reliable solar power forecasts, the project developed methods for their utilization in power system operations. These include the development of risk-aware unit commitment and economic dispatch algorithms and methods to reformulate probabilistic forecasts to be used in these power system operational models. Dynamic power system reserve methods were also developed, which have been shown in silico to create economic savings and reliability improvements on an ERCOT-like system as well as financial savings in the ERCOT system through more granular consideration of the uncertainty associated with solar power forecasts. Finally, a situational awareness tool to help grid operators better understand solar power forecast uncertainty in daily operations was developed and extensively vetted.

14 SOLAR ENERGY↗

Prognostics Uncertainty Management with Application to Government and Industry

Predictions about the future are contingent on future usage, but also on the quality of the models employed and the assessment of the current health state. These factors, amongst others, need to be considered to arrive at a prediction that is conducted through a rigorous method but where the confidence bounds are not prohibitively large.

Prognostics↗

An overview of methods to identify and manage uncertainty for modelling problems in the water-environment-agriculture cross-sector

Uncertainty pervades the representation of systems in the water–environment–agriculture cross-sector. Successful methods to address uncertainties have largely focused on standard mathematical formulations of biophysical processes in a single sector, such as partial or ordinary differential equations. More attention to integrated models of such systems is warranted. Model components representing the different sectors of an integrated model can have less standard, and different, formulations to one another, as well as different levels of epistemic knowledge and data informativeness. Thus, uncertainty is not only pervasive but also crosses boundaries and propagates between system components. Uncertainty assessment (UA) cries out for more eclectic treatment in these circumstances, some of it being more qualitative and empirical. Here in this paper, we discuss the various sources of uncertainty in such a cross-sectoral setting and ways to assess and manage them. We have outlined a fast-growing set of methodologies, particularly in the computational mathematics literature on uncertainty quantification (UQ), that seem highly pertinent for uncertainty assessment. There appears to be considerable scope for advancing UA by integrating relevant UQ techniques into cross-sectoral problem applications. Of course this will entail considerable collaboration between domain specialists who often take first ownership of the problem and computational methods experts.

97 MATHEMATICS AND COMPUTING↗

Managing Uncertainty and Flexibility in Day-Ahead Electricity Markets

Net load imbalances from day ahead forecasts can lead to significant grid operations costs and are expected to increase as variable renewable energy adoption grows. We propose a new wholesale market product to manage the risk of net load imbalances called Flexibility Options. This product relies on probabilistic forecasts to estimate flexibility demand and would be co-optimized in the day-ahead market. We also propose stochastic methods that enable DER and flexible load aggregators to participate in flexibility markets while considering the uncertainty in weather and occupant behavior.

day-ahead market↗

Uncertainty management by relaxation of conflicting constraints in production process scheduling

Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

Dorn, Juergen↗

Managing Uncertainty Due to a Fundamental Error Source Arising from Scatterer Distribution Complexity in Radar Remote Sensing of Precipitation

The assumption that cloud and rain drops are spatially distributed according to a Poisson distribution within a scattering volume probed by a radar being used to estimate precipitation has represented bedrock theory in establishing 'rules of the game' for pulse averaging--the process needed to beat down noise to an acceptable level in the measurement of radar reflectivity factor. Based on relatively recent observations of 'realistic' spatial distributions of hydrometeor scatterers in a cloudy atmosphere motivates a renewed examination of the consequences of using a too simplified assumption underlying volume scattering--particularly in regards to the standard pulse averaging rule. Our investigation addresses two extremes, simple to complex, insofar as allowed for complexities in an underlying scatterer distribution. It is demonstrated that as the spatial distribution ranges from Poisson (a narrow distribution) to multi-fractal (much broader distribution), uncertainty in a measurement increases if the rule for pulse averaging goes unchanged from its Poisson distribution reference county. [A bounded cascade is used for the multi-fractal distribution, a regularly observed distribution vis-a-vis cloud liquid water content.] The resultant measurement uncertainty leads to a fundamental source of error in the estimation of rain rate from radar measurements, one that has been disregarded since the early 1950s when radar sets first began to be used for rainfall measuring. It is shown how this source of error can be 'managed'--under the assumption that number of data analysis experiments would be carried out, experiments involving pulse-by-pulse measurements obtained from a radar set modified to output individual pulses of reflectivity factor. For practical applications, a new parameter called normalized k-sample intensity invariance is developed to enable defining the required pulse average count according to a preferred degree of uncertainty.

Smith, Eric A.↗

Uncertainty Management in Remote Sensing of Climate Data. Summary of A Workshop

Great advances have been made in our understanding of the climate system over the past few decades, and remotely sensed data have played a key role in supporting many of these advances. Improvements in satellites and in computational and data-handling techniques have yielded high quality, readily accessible data. However, rapid increases in data volume have also led to large and complex datasets that pose significant challenges in data analysis (NRC, 2007). Uncertainty characterization is needed for every satellite mission and scientists continue to be challenged by the need to reduce the uncertainty in remotely sensed climate records and projections. The approaches currently used to quantify the uncertainty in remotely sensed data, including statistical methods used to calibrate and validate satellite instruments, lack an overall mathematically based framework.

Remote sensing↗

Human subjects concerns in ground based ECLSS testing - Managing uncertainty in closely recycled systems

U.S. space missions have to this point used water either made on board or carried from earth and discarded after use. For Space Station Freedom, long duration life support will include air and water recycling using a series of physical-chemical subsystems. The Environmental Control and Life Support System (ECLSS) designed for this application must be tested extensively at all stages of hardware maturity. Human test subjects are required to conduct some of these tests, and the risks associated with the use of development hardware must be addressed. Federal guidelines for protection of human subjects require careful consideration of risks and potential benefits by an Institutional Review Board (IRB) before and during testing. This paper reviews the ethical principles guiding this consideration, details the problems and uncertainties inherent in current hardware testing, and presents an incremental approach to risk assessment for ECLSS testing.

Crump, William J.↗

Managing Uncertainty in Preliminary Aeroshell Design Analysis

An analysis tool to aid in preliminary design of re-entry aeroshells for interplanetary exploration is presented. The computational tool addresses a common feature of design analysis, the need to make use of results from several analysis regimes and from several sources.

Design Methods and Models Design Representations C↗