Search NASA⌕ Search

SEARCH · Search NASA

Results for “Uplink Operations Element”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Mars surveyor operations project command generation process

The methods employed by the Mars surveyor operations project (MSOP) flight team to accelerate the command generation process are described. The approach adopted was to develop a ground system which could simultaneously support as many as three spacecraft in various phases of flight and two in development. The uplink element of the MSOP is discussed, including the control of the science instruments and the spacecraft bus using real-time commands as well as time-tagged stored sequences. The non-interactive payload command process, the express command process, the coordinated command process and the stored sequence process are described. The automation of these processes resulted in flight operations cost savings while maintaining a minimum of risk.

Brooks, Robert N., Jr.↗

Simulation and Flight Test Capability for Testing Prototype Sense and Avoid System Elements

NASA Langley Research Center (LaRC) and The MITRE Corporation (MITRE) have developed, and successfully demonstrated, an integrated simulation-to-flight capability for evaluating sense and avoid (SAA) system elements. This integrated capability consists of a MITRE developed fast-time computer simulation for evaluating SAA algorithms, and a NASA LaRC surrogate unmanned aircraft system (UAS) equipped to support hardware and software in-the-loop evaluation of SAA system elements (e.g., algorithms, sensors, architecture, communications, autonomous systems), concepts, and procedures. The fast-time computer simulation subjects algorithms to simulated flight encounters/ conditions and generates a fitness report that records strengths, weaknesses, and overall performance. Reviewed algorithms (and their fitness report) are then transferred to NASA LaRC where additional (joint) airworthiness evaluations are performed on the candidate SAA system-element configurations, concepts, and/or procedures of interest; software and hardware components are integrated into the Surrogate UAS research systems; and flight safety and mission planning activities are completed. Onboard the Surrogate UAS, candidate SAA system element configurations, concepts, and/or procedures are subjected to flight evaluations and in-flight performance is monitored. The Surrogate UAS, which can be controlled remotely via generic Ground Station uplink or automatically via onboard systems, operates with a NASA Safety Pilot/Pilot in Command onboard to permit safe operations in mixed airspace with manned aircraft. An end-to-end demonstration of a typical application of the capability was performed in non-exclusionary airspace in October 2011; additional research, development, flight testing, and evaluation efforts using this integrated capability are planned throughout fiscal year 2012 and 2013.

Howell, Charles T.↗

Concept of Operations for OSIRIS-REx Optical Navigation Image Planning

Optical navigation (OpNav) is a critical subsystem of the OSIRIS-REx asteroid sample return mission, which operated in the vicinity of near-Earth asteroid (101955) Bennu from August 2018 through April 2021. A substantial amount of mission resources across multiple subsystems and institutions is required to ensure that the OpNav data are successfully acquired. The KinetX OpNav team, part of the Flight Dynamics System (FDS), is responsible for performing required analysis to develop the OpNav operations plans; requesting, reviewing and verifying the plans; and ultimately using the image data for critical navigation operations. The FDS team, responsible for the mission navigation, is operated by KinetX Aerospace with management and operations support from NASA’s Goddard Space Flight Center. The Science Processing and Operations Center (SPOC), located at the University of Arizona’s Lunar and Planetary Laboratory, is responsible for generating the planning products for all science and most OpNav data. These plans are integrated into the spacecraft sequences, tested, and commanded by the Mission Support Area (MSA) at Lockheed Martin Space. To ensure mission-critical navigation image data are successfully acquired, the plan is developed through a waterfall of planning cycles over the course of 3 months prior to onboard plan execution. During the initial strategic planning for a mission phase, detailed analysis is performed by the OpNav team to conceptualize the concept of operations (ConOps) for image data collection. This phase OpNav Narrative is included along with other strategic planning documents for the key ground segment stakeholders to review and provide feedback. The detailed OpNav plans get defined in the tactical planning cycle, which spans 8 to 3 weeks before the week-long integrated sequence is executed on-board the spacecraft. During the tactical cycle, the initial OpNav Request is submitted along with the science requests, kicking off development of the science and OpNav plans. Once the initial plan is drafted, interfaces are exercised so that the plan can be reviewed and iterated, if necessary. A rigorous schedule is followed by the planning teams during the implementation cycle, spanning the last 18 days before uplink, to ensure all the necessary integration, testing, and reviewing can occur on time. The development of the OpNav planning ConOps, including responsibilities, interfaces, timelines, and procedures, took extensive collaboration across mission elements and institutions. The process was robust throughout the 137 weeks of continuous Optical Navigation Operations at Bennu, which concluded on April 9th, 2021.

Coralie D. Adam↗

Integrated command, control, communications and computation system functional architecture

The functional architecture for an integrated command, control, communications, and computation system applicable to the command and control portion of the NASA End-to-End Data. System is described including the downlink data processing and analysis functions required to support the uplink processes. The functional architecture is composed of four elements: (1) the functional hierarchy which provides the decomposition and allocation of the command and control functions to the system elements; (2) the key system features which summarize the major system capabilities; (3) the operational activity threads which illustrate the interrelationahip between the system elements; and (4) the interfaces which illustrate those elements that originate or generate data and those elements that use the data. The interfaces also provide a description of the data and the data utilization and access techniques.

Cooley, C. G.↗

Atmospheric Compensation for Uplink Arrays via Radiometry

Uplink arrays for communications applications are gaining increased visibility within the NASA and military community due to the enhanced flexibility and reliability they provide. When compared with the conventional large, single aperture antennas currently comprising the Deep Space Network (DSN), for example, smaller aperture antenna arrays have the benefits of providing fault tolerance (reduced single-point failure), reduced maintenance cost, and enhanced capabilities such as electronic beam-steering and multi-beam operation. However, signal combining of antenna array elements spaced many wavelengths apart becomes problematic due to the inherent instability of earth's turbulent atmosphere, particularly at the frequencies of interest to the DSN (i.e., Ka-band). Degradation in the power combining of the individual elements comprising the array arises due to uncorrelated phase errors introduced as the signals propagate through the troposphere. It is well known that the fundamental source of this error is due to the inhomogeneous distribution of water vapor in the atmosphere [1]. Several techniques have been proposed to circumvent this issue, including the use of phase calibration towers and a moon bounce to generate a feedback loop which would provide a means of intermittent calibration of the system phase errors (thermal drifts, atmosphere) [2,3]. However, these techniques require repositioning of the antenna elements to perform this operation which ultimately results in reduced system availability. And, though they are sufficient for compensating for slow varying phase drifts, they are insufficient to compensate for faster varying phase errors, such as those introduced by the atmosphere. In this paper, preliminary radiometry and interferometry measurements collected by the NASA Glenn Research Center are analyzed and indicate that the use of optimized water vapor radiometers as a feedback system in a communications platform could provide the necessary atmospheric compensation technique to enhance the beamforming of uplink arrays.

Nessel, James A.↗

The Mars Surveyor '01 Rover and Robotic Arm

The Mars Surveyor 2001 Lander will carry with it both a Robotic Arm and Rover to support various science and technology experiments. The Marie Curie Rover, the twin sister to Sojourner Truth, is expected to explore the surface of Mars in early 2002. Scientific investigations to determine the elemental composition of surface rocks and soil using the Alpha Proton X-Ray Spectrometer (APXS) will be conducted along with several technology experiments including the Mars Experiment on Electrostatic Charging (MEEC) and the Wheel Abrasion Experiment (WAE). The Rover will follow uplinked operational sequences each day, but will be capable of autonomous reactions to the unpredictable features of the Martian environment. The Mars Surveyor 2001 Robotic Arm will perform rover deployment, and support various positioning, digging, and sample acquiring functions for MECA (Mars Environmental Compatibility Assessment) and Mossbauer Spectrometer experiments. The Robotic Arm will also collect its own sensor data for engineering data analysis. The Robotic Arm Camera (RAC) mounted on the forearm of the Robotic Arm will capture various images with a wide range of focal length adjustment during scientific experiments and rover deployment

Bonitz, Robert G.↗

Maximizing TDRS Command Load Lifetime

The GNC software onboard ISS utilizes TORS command loads, and a simplistic model of TORS orbital motion to generate onboard TORS state vectors. Each TORS command load contains five "invariant" orbital elements which serve as inputs to the onboard propagation algorithm. These elements include semi-major axis, inclination, time of last ascending node crossing, right ascension of ascending node, and mean motion. Running parallel to the onboard software is the TORS Command Builder Tool application, located in the JSC Mission Control Center. The TORS Command Builder Tool is responsible for building the TORS command loads using a ground TORS state vector, mirroring the onboard propagation algorithm, and assessing the fidelity of current TORS command loads onboard ISS. The tool works by extracting a ground state vector at a given time from a current TORS ephemeris, and then calculating the corresponding "onboard" TORS state vector at the same time using the current onboard TORS command load. The tool then performs a comparison between these two vectors and displays the relative differences in the command builder tool GUI. If the RSS position difference between these two vectors exceeds the tolerable lim its, a new command load is built using the ground state vector and uplinked to ISS. A command load's lifetime is therefore defined as the time from when a command load is built to the time the RSS position difference exceeds the tolerable limit. From the outset of TORS command load operations (STS-98), command load lifetime was limited to approximately one week due to the simplicity of both the onboard propagation algorithm, and the algorithm used by the command builder tool to generate the invariant orbital elements. It was soon desired to extend command load lifetime in order to minimize potential risk due to frequent ISS commanding. Initial studies indicated that command load lifetime was most sensitive to changes in mean motion. Finding a suitable value for mean motion was therefore the key to achieving this goal. This goal was eventually realized through development of an Excel spreadsheet tool called EMMIE (Excel Mean Motion Interactive Estimation). EMMIE utilizes ground ephemeris nodal data to perform a least-squares fit to inferred mean anomaly as a function of time, thus generating an initial estimate for mean motion. This mean motion in turn drives a plot of estimated downtrack position difference versus time. The user can then manually iterate the mean motion, and determine an optimal value that will maximize command load lifetime. Once this optimal value is determined, the mean motion initially calculated by the command builder tool is overwritten with the new optimal value, and the command load is built for uplink to ISS. EMMIE also provides the capability for command load lifetime to be tracked through multiple TORS ephemeris updates. Using EMMIE, TORS command load lifetimes of approximately 30 days have been achieved.

Brown, Aaron J.↗

Dual frequency dichroic feed performance

The NASA Deep Space Net (DSN) in support of the Viking Mars Project in 1976, and for science and technology demonstrations during the Mariner-Venus-Mercury mission in 1974, has developed and implemented a dual (S- and X-band) feed for large ground microwave antennas. This feed provides for a multiplicity of functions; very low listening capability at each downlink (spacecraft-to-earth) band as well as simultaneous diplexed very high cw power uplink (earth-to-spacecraft) at the S-band frequency. Total 64-m antenna system performance, is considered in terms of gain, operating noise temperature and dual beam pointing or boresight coincidence. Because of the unique ability to fold or stow the dual band feed elements for single band operations, the performance definition between single and dual band operations will be reliable and accurate.

Bathker, D. A.↗

Flight Demonstration of the Tailored Arrival Manager

A flight demonstration of arrival traffic management automation was conducted in partnership between NASA, FAA and Boeing as an element of the latter’s ecoDemonstrator2020 flight program. For the demonstration, NASA’s prototype Tailored Arrival Manager(TAM) was used to compute efficient trajectory-based solutions to traffic management problems representing those encountered during time-based metering operations today. TAM solutions involving route modifications were uplinked to a Boeing 787 airplane using Controller Pilot Data Link Communications and seamlessly loaded into the airplane’s Flight Management System (FMS). The paper describes the concept and technology behind TAM along with the data exchanges and procedures involved with the demonstration. All TAM solutions were delivered in a timely manner and successfully integrated with the airplane’s FMS, thereby demonstrating the basic feasibility of trajectory-based arrival management using currently available data communications and avionics equipage. Although TAM solutions were not executed during this initial demonstration, a limited study of trajectory prediction accuracy was possible given that the airplane flew uninterrupted, automated descents with known route and speed intent. Analysis revealed that TAM meter-fix arrival time predictions were accurate to within ± 30 seconds for time horizons of 30 minutes or less, which matched closely with FMS predictions acquired through real-time data exchange. Top-of-descent predictions over similar time horizons were found accurate to within ± 5 nautical miles.

air traffic management↗

Flight Demonstration of the Tailored Arrival Manager

A flight demonstration of arrival traffic management automation was conducted in partnership between NASA, FAA and Boeing as an element of the latter’s ecoDemonstrator2020 flight program. For the demonstration, NASA’s prototype Tailored Arrival Manager(TAM) was used to compute efficient trajectory-based solutions to traffic management problems representing those encountered during time-based metering operations today. TAM solutions involving route modifications were uplinked to a Boeing 787 airplane using Controller Pilot Data Link Communications and seamlessly loaded into the airplane’s Flight Management System (FMS). The paper describes the concept and technology behind TAM along with the data exchanges and procedures involved with the demonstration. All TAM solutions were delivered in a timely manner and successfully integrated with the airplane’s FMS, thereby demonstrating the basic feasibility of trajectory-based arrival management using currently available data communications and avionics equipage. Although TAM solutions were not executed during this initial demonstration, a limited study of trajectory prediction accuracy was possible given that the airplane flew uninterrupted, automated descents with known route and speed intent. Analysis revealed that TAM meter-fix arrival time predictions were accurate to within ± 30 seconds for time horizons of 30 minutes or less, which matched closely with FMS predictions acquired through real-time data exchange. Top-of-descent predictions over similar time horizons were found accurate to within ± 5 nautical miles.

Air traffic managment↗

Deep Space Network Revitalization: Operations for the 21st Century

The National Aeronautics and Space Administration (NASA) supports unmanned space missions through a Deep Space Network (DSN) that is developed and operated by the Jet Propulsion Laboratory (JPL and its subcontractors. The DSN capabilities have been incrementally upgraded since its establishment in the late '50s and are delivered from three Deep Space Communications Complexes (DSCC's) near Goldstone, California, Madrid, Spain, and Canberra, Australia. At present each DSCC includes large antennas with diameters from 11 meters to 70 meters, that operate largely in S-band and X-band frequencies. In addition each DSCC includes all the associated electronics to receive and process the low-level telemetry signals, and radiate the necessary command with high-power transmitters. To accommodate support of the rapidly increasing number of missions by NASA and other space agencies, and to facilitate maintaining and increasing the level of service in a shrinking budget environment, JPL has initiated a bold road map with three key components: 1. A Network Simplification Project (NSP) to upgrade aging electronics, replacing them with modem commercially based components. NSP and related replacement tasks are projected to reduce the cost of operating the DSN by 50% relative to the 1997 levels. 2. Upgrade of all 34-m and 70-m antennas to provision of Ka-Band telemetry downlink capability, complemented by an existing X-band uplink capability. This will increase the effective telemetry downlink capacity by a factor of 4, without building any new antennas. 3. Establishment of an optical communications network to support for high data rate unmanned missions that cannot be accommodated with radiofrequency (RF) communications, as well as establish a path toward support of manned missions at Mars. In this paper we present the mission loading projected for 1998-2008 and the elements of the JPL road map that will enable supporting it with a reduced budget. Particular emphasis will be on streamlining the architecture and to reduce the DSN cost for operations, maintenance and sustaining engineering while at the same time also simplifying and reducing the operations cost for the flight missions.

Statman, Joseph I.↗

Stability measurements of the radio science system at the 34-m high-efficiency antennas

From 1991 to 1993 the fractional frequency stability of the operational Radio Science System was measured at DSS's 15, 45, and 65. These stations are designed to have the most stable uplink and downlink equipment in the Deep Space Network (DSN). Some measurements were performed when the antenna was moving and the frequency was ramped. The stability, including contributions of all elements in the station except for the antenna and the hydrogen maser, was measured to be 0.3 to 1.3 x 10(exp -15) when the frequency was fixed, and 0.6 to 6.0 x 10(exp -15) when the frequency was ramped (sample interval, 1000 sec). Only one measurement out of fifteen exceeded specification. In all other cases, when previous measurements on the antenna and the hydrogen maser were added, a total system stability requirement of 5.0 x 10(exp -15) as met. In addition, ambient temperature was found to cause phase variation in the measurements at a rate of 5.5 deg of phase per deg C.

Pham, T. T.↗

Application of MMIC modules in future multiple beam satellite antenna systems

Multiple beam antenna systems for advanced communication satellites operating in the 30/20 GHz frequency bands (30 GHz uplink, 20 GHz downlink) were developed. Up to twenty 0.3 deg HPBW fixed spot beams and six 0.3 deg HPBW scanning spot beams will be required. Array-fed dual reflector antenna systems in which monolithic microwave integrated circuit (MMIC) phase shift and amplifier modules are used with each radiating element of the feed array for beam pointing and power gain were developed. The feasibility of distributed power amplification and beam pointing with MMIC modules in the elements of an array and to develop a data base for future development were demonstrated. The technical discussion centers around the potential advantages of ""monolithic'' antennas for specific applications as compared to systems using high powered TWT's. These include: reduced losses in the beam forming network; advantage of space combining and graceful degradation; dynamic control of beam pointing and illumination contour; and possibilities for cost and weight reduction.

Smetana, J.↗

Advanced 30/20 GHz multiple beam antenna for future communications satellites

The technologies which will be implemented in advanced satellite communications systems being studied by NASA and the intended coverage scenarios are described. The systems will function at 30/20 GHz with 2.5 GHz bandwidth for the uplink and downlink. Subfrequencies will have 500 MHz bandwidth and operations will include TDMA modes. Sample scan patterns are presented for the centerminous U.S. The signals will be broadcast from a multibeam offset Cassegrain reflector antenna to obtain a low sidelobe, wide angle scan. Three contiguous low sidelobe beams will be generated with a diplex feed cluster and a 19 element scanning beam-forming network. The same technology will be used to double the capacity of current 14/12 GHz satellites.

Chen, C. C.↗

Project Report: Automatic Sequence Processor Software Analysis

The Mission Planning and Sequencing (MPS) element of Multi-Mission Ground System and Services (MGSS) provides space missions with multi-purpose software to plan spacecraft activities, sequence spacecraft commands, and then integrate these products and execute them on spacecraft. Jet Propulsion Laboratory (JPL) is currently is flying many missions. The processes for building, integrating, and testing the multi-mission uplink software need to be improved to meet the needs of the missions and the operations teams that command the spacecraft. The Multi-Mission Sequencing Team is responsible for collecting and processing the observations, experiments and engineering activities that are to be performed on a selected spacecraft. The collection of these activities is called a sequence and ultimately a sequence becomes a sequence of spacecraft commands. The operations teams check the sequence to make sure that no constraints are violated. The workflow process involves sending a program start command, which activates the Automatic Sequence Processor (ASP). The ASP is currently a file-based system that is comprised of scripts written in perl, c-shell and awk. Once this start process is complete, the system checks for errors and aborts if there are any; otherwise the system converts the commands to binary, and then sends the resultant information to be radiated to the spacecraft.

sequencing↗

The Transition from Spacecraft Development Ot Flight Operation: Human Factor Considerations

In the field of aeronautics and astronautics, a paradigm shift has been witnessed by those in academia, research and development, and private industry. Long development life cycles and the budgets to support such programs and projects has given way to aggressive task schedules and leaner resources to draw from all the while challenging assigned individuals to create and produce improved products of processes. however, this "faster, better, cheaper" concept cannot merely be applied to the design, development, and test of complex systems such as earth-orbiting of interplanetary robotic spacecraft. Full advantage is not possible without due consideration and application to mission operations planning and flight operations, Equally as important as the flight system, the mission operations system consisting of qualified personnel, ground hardware and software tools, and verified and validated operational processes, should also be regarded as a complex system requiring personnel to draw upon formal education, training, related experiences, and heuristic reasoning in engineering an effective and efficient system. Unquestionably, qualified personnel are the most important elements of a mission operations system. This paper examines the experiences of the Deep Space I Project, the first in a series of new technology in-flight validation missions sponsored by the United States National Aeronautics and Space Administration (NASA), specifically, in developing a subsystems analysis and technology validation team comprised of former spacecraft development personnel. Human factor considerations are investigated from initial concept/vision formulation; through operational process development; personnel test and training; to initial uplink product development and test support. Emphasis has been placed on challenges and applied or recommended solutions, so as to provide opportunities for future programs and projects to address and disposition potential issues and concerns as early as possible to reap the benefits associated with learning from other's past experiences.

Basilio, Ralph R.↗

Component-Level Electronic-Assembly Repair (CLEAR) Operational Concept

This Component-Level Electronic-Assembly Repair (CLEAR) Operational Concept document was developed as a first step in developing the Component-Level Electronic-Assembly Repair (CLEAR) System Architecture (NASA/TM-2011-216956). The CLEAR operational concept defines how the system will be used by the Constellation Program and what needs it meets. The document creates scenarios for major elements of the CLEAR architecture. These scenarios are generic enough to apply to near-Earth, Moon, and Mars missions. The CLEAR operational concept involves basic assumptions about the overall program architecture and interactions with the CLEAR system architecture. The assumptions include spacecraft and operational constraints for near-Earth orbit, Moon, and Mars missions. This document addresses an incremental development strategy where capabilities evolve over time, but it is structured to prevent obsolescence. The approach minimizes flight hardware by exploiting Internet-like telecommunications that enables CLEAR capabilities to remain on Earth and to be uplinked as needed. To minimize crew time and operational cost, CLEAR exploits offline development and validation to support online teleoperations. Operational concept scenarios are developed for diagnostics, repair, and functional test operations. Many of the supporting functions defined in these operational scenarios are further defined as technologies in NASA/TM-2011-216956.

Oeftering, Richard C.↗