Search NASA⌕ Search

SEARCH · Search NASA

Results for “Utility Working Group”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Mars 2020 Model Based Systems Engineering Pilot

The pilot study is led by the Integration Engineering group in NASA's Launch Services Program (LSP). The Integration Engineering (IE) group is responsible for managing the interfaces between the spacecraft and launch vehicle. This pilot investigates the utility of Model-Based Systems Engineering (MBSE) with respect to managing and verifying interface requirements. The main objectives of the pilot are to model several key aspects of the Mars 2020 integrated operations and interface requirements based on the design and verification artifacts from Mars Science Laboratory (MSL) and to demonstrate how MBSE could be used by LSP to gain further insight on the interface between the spacecraft and launch vehicle as well as to enhance how LSP manages the launch service. The method used to accomplish this pilot started through familiarization of SysML, MagicDraw, and the Mars 2020 and MSL systems through books, tutorials, and NASA documentation. MSL was chosen as the focus of the model since its processes and verifications translate easily to the Mars 2020 mission. The study was further focused by modeling specialized systems and processes within MSL in order to demonstrate the utility of MBSE for the rest of the mission. The systems chosen were the In-Flight Disconnect (IFD) system and the Mass Properties process. The IFD was chosen as a system of focus since it is an interface between the spacecraft and launch vehicle which can demonstrate the usefulness of MBSE from a system perspective. The Mass Properties process was chosen as a process of focus since the verifications for mass properties occur throughout the lifecycle and can demonstrate the usefulness of MBSE from a multi-discipline perspective. Several iterations of both perspectives have been modeled and evaluated. While the pilot study will continue for another 2 weeks, pros and cons of using MBSE for LSP IE have been identified. A pro of using MBSE includes an integrated view of the disciplines, requirements, and verifications leading up to launch. The model allows IE to understand the relationships between disciplines throughout test activities and verifications. Additionally, the relationships between disciplines and integration tasks are generally consistent. The model allows for the generic relationships and tasks to be captured and used throughout multiple mission models should LSP further pursue MBSE. A con of MBSE is the amount of time it takes upfront to understand MBSE and create a useful model. The upfront time it takes to create a useful model is heavily discussed in MBSE literature and is a consistent con throughout the known applications of MBSE. The need to understand SysML and the software chosen also poses the possibility of a "bottleneck" or one person being the sole MBSE user for the working group. The utility of MBSE will continue to be evaluated through the remainder of the study. In conclusion, the original objectives of the pilot study were to use artifacts from MSL to model key aspects of Mars 2020 and demonstrate how MBSE could be used by LSP to gain insight into the spacecraft and launch vehicle interfaces. Progress has been made in modeling and identifying the utility of MBSE to LSP IE and will continue to be made until the pilot study's conclusion in mid-August. The results of this study will produce initial models, modeling instructions and examples, and a summary of MBSE's utility for future use by LSP.

Dukes, Alexandra Marie↗

Interface Management for a NASA Flight Project Using Model-Based Systems Engineering (MBSE)

The goal of interface management is to identify, define, control, and verify interfaces; ensure compatibility; provide an efficient system development; be on time and within budget; while meeting stakeholder requirements. This paper will present a successful seven-step approach to interface management used in several NASA flight projects. The seven-step approach using Model Based Systems Engineering will be illustrated by interface examples from the Materials International Space Station Experiment-X (MISSE-X) project. The MISSE-X was being developed as an International Space Station (ISS) external platform for space environmental studies, designed to advance the technology readiness of materials and devices critical for future space exploration. Emphasis will be given to best practices covering key areas such as interface definition, writing good interface requirements, utilizing interface working groups, developing and controlling interface documents, handling interface agreements, the use of shadow documents, the importance of interface requirement ownership, interface verification, and product transition.

Vipavetz, Kevin↗

National Aeronautics and Space Administration fundamental research program. Information utilization and evaluation

In the second half of the 1980's NASA can expect to face difficult choices among alternative fundamental and applied research, and development projects that could potentially lead to improvements in the information systems used to manage renewable resources. The working group on information utilization and evaluation believes that effective choices cannot be made without a better understanding of the current and prospective problems and opportunities involved in the application of remote sensing to improve renewable research information systems. A renewable resources information system is defined in a broad context to include a flow of data/information from: acquisition through processing, storage, integration with other data, analysis, graphic presentation, decision making, and assessment of the affects of those decisions.

Estes, J. E.↗

SRMS History, Evolution and Lessons Learned

Early in the development of the Space Shuttle, it became clear that NASA needed a method of deploying and retrieving payloads from the payload bay. The Shuttle Remote Manipulator System (SRMS) was developed to fill this need. The 50 foot long robotic arm is an anthropomorphic design consisting of three electromechanical joints, six degrees of freedom, and two boom segments. Its composite boom construction provided a light weight solution needed for space operations. Additionally, a method of capturing payloads with the arm was required and a unique End Effector was developed using an electromechanical snare mechanism. The SRMS is operated using a Displays and Controls Panel and hand controllers located within the aft crew compartment of the shuttle. Although the SRMS was originally conceived to deploy and retrieve payloads, its generic capabilities allowed it to perform many other functions not originally conceived of. Over the years it has been used for deploying and retrieving constrained and free flying payloads, maneuvering and supporting EVA astronauts, satellite repair, International Space Station construction, and as a viewing aid for on-orbit International Space Station operations. After the Columbia accident, a robotically compatible Orbiter Boom Sensor System (OBSS) was developed and used in conjunction with the SRMS to scan the Thermal Protection System (TPS) of the shuttle. These scans ensure there is not a breach of the TPS prior to shuttle re-entry. Ground operations and pre mission simulation, analysis and planning played a major role in the success of the SRMS program. A Systems Engineering Simulator (SES) was developed to provide a utility complimentary to open loop engineering simulations. This system provided a closed-loop real-time pilot-driven simulation giving visual feedback, display and control panel interaction, and integration with other vehicle systems, such as GN&C. It has been useful for many more applications than traditional training. Evolution of the simulations, guided by the Math Model Working Group, showed the utility of input from multiple modeling groups with a structured forum for discussion.There were many unique development challenges in the areas of hardware, software, certification, modeling and simulation. Over the years, upgrades and enhancements were implemented to increase the capability, performance and safety of the SRMS. The history and evolution of the SRMS program provided many lessons learned that can be used for future space robotic systems.

Jorgensen, Glenn↗

An autonomous rendezvous and docking system using cruise missile technology

In November 1990 General Dynamics demonstrated an AR&D system for members of the Strategic Avionics Technology Working Group. This simulation utilized prototype hardware derived from the Cruise Missile and Centaur avionics systems. The object of this proof of concept demonstration was to show that all the accuracy, reliability, and operational requirements established for a spacecraft to dock with Space Station Freedom could be met by the proposed AR&D system.

Jones, ED↗

An autonomous rendezvous and docking system using cruise missile technologies

In November 1990 the Autonomous Rendezvous & Docking (AR&D) system was first demonstrated for members of NASA's Strategic Avionics Technology Working Group. This simulation utilized prototype hardware from the Cruise Missile and Advanced Centaur Avionics systems. The object was to show that all the accuracy, reliability and operational requirements established for a space craft to dock with Space Station Freedom could be met by the proposed system. The rapid prototyping capabilities of the Advanced Avionics Systems Development Laboratory were used to evaluate the proposed system in a real time, hardware in the loop simulation of the rendezvous and docking reference mission. The simulation permits manual, supervised automatic and fully autonomous operations to be evaluated. It is also being upgraded to be able to test an Autonomous Approach and Landing (AA&L) system. The AA&L and AR&D systems are very similar. Both use inertial guidance and control systems supplemented by GPS. Both use an Image Processing System (IPS), for target recognition and tracking. The IPS includes a general purpose multiprocessor computer and a selected suite of sensors that will provide the required relative position and orientation data. Graphic displays can also be generated by the computer, providing the astronaut / operator with real-time guidance and navigation data with enhanced video or sensor imagery.

Jones, Ruel Edwin↗

Geometrical-Based Navigation System Performance Assessment in the Space Service Volume Using a Multiglobal Navigation Satellite System Methodology

NASA is participating in the International Committee on Global Navigation Satellite Systems (GNSS) (ICG)'s efforts towards demonstrating the benefits to the space user in the Space Service Volume (SSV) when a multi-GNSS solution space approach is utilized. The ICG Working Group: Enhancement of GNSS Performance, New Services and Capabilities has started a three phase analysis initiative as an outcome of recommendations at the ICG-10 meeting, in preparation for the ICG-11 meeting. The first phase of that increasing complexity and fidelity analysis initiative is based on a pure geometrically-derived access technique. The first phase of analysis has been completed, and the results are documented in this paper.

Global Positioning System↗

Volumetrically-Derived Global Navigation Satellite System Performance Assessment from the Earths Surface through the Terrestrial Service Volume and the Space Service Volume

NASA is participating in the International Committee on Global Navigation Satellite Systems (GNSS) (ICG)'s efforts towards demonstrating the benefits to the space user from the Earth's surface through the Terrestrial Service Volume (TSV) to the edge of the Space Service Volume (SSV), when a multi-GNSS solution space approach is utilized. The ICG Working Group: Enhancement of GNSS Performance, New Services and Capabilities has started a three phase analysis initiative as an outcome of recommendations at the ICG-10 meeting, in preparation for the ICG-11 meeting. The first phase of that increasing complexity and fidelity analysis initiative was recently expanded to compare nadir-facing and zenith-facing user hemispherical antenna coverage with omnidirectional antenna coverage at different distances of 8,000 km altitude and 36,000 km altitude. This report summarizes the performance using these antenna coverage techniques at distances ranging from 100 km altitude to 36,000 km to be all encompassing, as well as the volumetrically-derived system availability metrics.

Global Positioning System↗

Signal Strength-Based Global Navigation Satellite System Performance Assessment in the Space Service Volume

NASA is participating in the International Committee on Global Navigation Satellite Systems (GNSS) (ICG)'s efforts towards demonstrating the benefits to the space user in the Space Service Volume (SSV) when a multi-GNSS solution space approach is utilized. The ICG Working Group: Enhancement of GNSS Performance, New Services and Capabilities has started a three phase analysis initiative as an outcome of recommendations at the ICG-10 meeting, in preparation for the ICG-11 meeting. The second phase of that increasing complexity and fidelity analysis initiative is based on augmenting the Phase 1 pure geometrical approach with signal strength-based limitations to determine if access is valid. The second phase of analysis has been completed, and the results are documented in this paper.

navigation↗

Acoustics Technical Working Group and UAM Noise Working Group Proceedings

The NASA Acoustics Technical Working Group Meeting originally started as a program planning meeting in 1992 and has grown through the years. The purpose of these biannual meetings is to foster communication and collaboration among NASA researchers and their university, industry, and government colleagues on activities and work of current and future mutual interest. The NASA-led Urban Air Mobility (UAM) Noise Working Group (UNWG) Meeting began in 2018 as a one-day meeting immediately following the Acoustics Technical Working Group Meeting. The UNWG utilizes four subgroups that conduct regular meetings throughout the year to focus on challenges facing UAM vehicles for community noise and acceptance. The four subgroups coordinate research for development of noise prediction tools/noise reduction technologies, ground and flight test methods, human response and metrics, and regulations and policy (led by the FAA). This work is a compilation of the presentations given at ATWG/UNWG Fall 2022 held in person and via Teams at NASA Glenn Research Center. All NASA content was previously submitted through STRIVES for public presentation. This is merely a compilation. Non-NASA content has permission to distribute. Slide 208 video is included in the Available Downloads as Medial.MOV.

Advanced Air Mobility↗

ERTS-1 applications to California resource inventory

There are no author-identified significant results in this report. ERTS-1 information will be utilized by resource management groups working in the fields of forestry, hydrology, range management, and agriculture to develop resource inventories of the state of California. Five examples are given of the use of ERTS-1 imagery and aerial photography in identifying different crops and field conditions.

Colwell, R. N.↗

Working Group Reports and Presentations: Asteroids

The study and utilization of asteroids will be an economical way to enable exploration of the solar system and extend human presence in space. There are thousands of near-earth objects (NEOs) that we will be able to reach. They offer resources, transportation, and exploration platforms, but also present a potential threat to civilization. Asteroids play a catastrophic role in the history of the Earth. Geological records indicate a regular history of massive impacts, which astronomical observations confirm is likely to continue with potentially devastating consequences. However, study and exploration of near earth asteroids can significantly increase advanced warning of an Earth impact, and potentially lead to the technology necessary to avert such a collision. Efforts to detect and prevent cataclysmic events would tend to foster and likely require international cooperation toward a unified goal of self-preservation. Exploration of asteroids will help us to understand our history and perhaps save our future. Besides the obvious and compelling scientific and security drivers for asteroid research and exploration, there are numerous engineering and industrial applications for near-term asteroid exploration. We have strong evidence that some asteroids are metal rich. Some are water and organic rich. They can be reached with a very low fuel cost compared to other solar system destinations. Once we reach them, there are efficient, simple extraction technologies available that would facilitate utilization. In addition, the costs of returning extracted resources from asteroids will be a fraction of the cost to return similar resources from the moon to Low Earth Orbit (LEO). These raw materials, extracted and shipped at relatively low cost, can be used to manufacture structures, fuel, and products which could be used to foster mankind s further exploration of the solar system. Asteroids also have the potential to offer transport to several destinations in the solar system. In addition to Mars and the Asteroid belt, it is possible to nudge the orbits of NEOs to provide convenient transport to other destinations. Resources to support life on these long voyages may be gathered from the host asteroid itself. As asteroids travel over a wide range of inclinations and ranges, they offer possible platforms to perform scientific investigations. These include unique vantage point observations of the sun and planets. These observations can help us to understand solar activity and space weather. They also afford us an opportunity to see how the earth looks from afar with different perspectives. When we look for planets outside of our solar system, these observations will help us to calibrate our data. Asteroids may also be used as platforms to support very long baseline interferometry with unprecedented angular resolutions.

Lewis, John↗

NASA 2018 Green Propulsion Roadmap

The Green Propulsion Working Group (GPWG) is a technical guidance working group formed April 2017 under the Agency's Capability Leadership Team The GPWG was tasked with recommending an agency road map and providing guidance to NASA on green propulsion technology development and infusion The GPWG's efforts focus on ionic liquid propellants and related technologies The GPWG was chartered with three representatives from NASA Centers currently exploring green propulsion technologies As other Centers may explore programs that utilize green propulsion, membership of the working group can be expanded to include more interested parties Working group also solicits and coordinates with other government agencies (e.g. AFRL, MDA) In 2015, JANNAF hosted a Technical Interchange Meeting (TIM) on Green Monopropellant Alternatives to Hydrazine (GMAH) Included both Government and non-Government contributions on the State-of-the-Art in Green Propulsion Technology Following the TIM, a Government-only session (USAF/AFRL/NASA/MDA/DLA) reviewed and identified remaining technical gaps in Green Propulsion In 2016, an inter-agency team (AFRL/NASA/MDA) worked together to develop an informal inter-agency "roadmap" based on the outcome of the TIM Approach consisted of near-term, mid-term, and long-term technology advancement areas, approaching incrementally larger thrust classes The NASA Green Propulsion Working Group reviewed the work of the 2016 Inter-Agency Working Group, and concurs that the identified technical gaps and technology development areas are still relevant and necessary to see green propulsion technology advanced The GPWG recommends the 2016 roadmap be adopted as baseline for NASA needs, with some additions The focus of the 2016 inter-agency roadmap was primarily on the thruster technology. The Agency must also invest in understanding the broader propulsion system-level technology gaps in parallel. Timeframes are considered suggested from a priority standpoint, but are also flexible as some efforts will need to occur in the nearer term or concurrently in order to meet specific mission requirements The GPWG developed 2018 roadmap breaks down the technology development goals into Technology Development Areas (TDA's), and identifies the near-, mid, and long-term sub-goals within those areas. Those TDA's are: Thruster Hardware Development Modeling & Tools Development Materials Properties and Compatibility Propellant Development.

Cavender, Dan↗

Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

In the original report dated February 11, 2005, the utility of NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. This addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted as Section 2.6 of "Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees."

Holekamp, Kara↗

Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

In the original report dated February 11, 2005, the utility of the NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. The addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted in Section 2.6 of "Air Quality Decision Support Tools, Partner Plans, Working Groups, Committees".

Holekamp, Kara↗

First Moderate Resolution Imaging Spectroradiometer (MODIS) Snow and Ice Workshop

This document is a compilation of summaries of talks presented at a 2-day workshop on Moderate Resolution maging Spectroradiometer (MODIS) snow and ice products. The objectives of the workshop were to: inform the snow and ce community of potential MODIS products, seek advice from the participants regarding the utility of the products, and letermine the needs for future post-launch MODIS snow and ice products. Four working groups were formed to discuss at-launch snow products, at-launch ice products, post-launch snow and ice products and utility of MODIS snow and ice products, respectively. Each working group presented recommendations at the conclusion of the workshop.

Hall, Dorothy K.↗