SEARCH · Search NASA
Results for “VOYAGER PROJECT”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Microwave communications from outer planets - The Voyager Project
The paper summarizes the Voyager Project, the mission objectives, and the spacecraft communications system required to meet the mission objectives. The primary emphasis of the mission is on comparative studies of the Jupiter and Saturn systems in the areas of: (1) the environment, atmosphere and body characteristics of the planets, and one or more of the satellites, (2) the nature of the recently discovered Jovian ring and the rings of Saturn, and (3) the interplanetary medium at increasing distances from the sun. The complexities and problems, such as power consumption, weight, and antenna pointing constraints are presented, along with a detailed description of the radio frequency and S/X-band antenna subsystems.
Voyager project Progress report, 16 Aug. - 15 Sep. 1965
Voyager project - scheduling, mission engineering, data management, reliability and testing of spacecraft and capsule
Modification of simulation conversion assembly for support of Voyager project and Pioneer-Venus 1978 project
The simulation conversion assembly was upgraded to provide the additional capabilities of simulating Voyager and Pioneer-Venus 1978 telemetry data streams for verifying the integrity of the deep space stations while continuing to fulfill the DSN test and training support requirements. The requirements and the implementations are summarized.
Spacecraft Health Automated Reasoning Prototype (SHARP): The fiscal year 1989 SHARP portability evaluations task for NASA Solar System Exploration Division's Voyager project
A Spacecraft Health Automated Reasoning Prototype (SHARP) portability study is presented. Some specific progress is described on the portability studies, plans for technology transfer, and potential applications of SHARP and related artificial intelligence technology to telescience operations. The application of SHARP to Voyager telecommunications was a proof-of-capability demonstration of artificial intelligence as applied to the problem of real time monitoring functions in planetary mission operations. An overview of the design and functional description of the SHARP system is also presented as it was applied to Voyager.
Voyager spacecraft system Task C configuration data and management study Final technical report, Apr. 1966 - Jul. 1967
Configuration identification data and management procedures for Voyager project
Voyager spacecraft system Task C thrust vector control study Final technical report, Apr. 1966 - Jul. 1967
Liquid insertion thrust vector control system for Voyager project
Voyager flight project: DSN Telecommunications Compatibility Test Program
The Voyager Flight Project - DSN Telecommunications Compatibility Test Program consisted of three phases: Subsystem Design, System Design, and System Verification Tests. Subsystem Design Tests were performed during mid 1976. System Design Tests were performed during late 1976 and early 1977. System Verification Tests were performed during the spring and summer of 1977. This article describes the System Design Tests and test results that provided the basis for establishment of telecommunications design between the DSN and the Voyager Flight Project.
Space Programs Summary No. 37-41, Volume VI FOR the Period July 1 to August 31, 1966. Space Exploration Programs and Space Sciences
Reliability efforts and test facility developments summarized for Deep Space Instrumentation Facility and Surveyor, Mariner, and Voyager projects
Space Programs Summary no. 37-39, volume VI FOR the period March 1, 1966 to April 30, 1966. Space Exploration Programs and Space Sciences
Summary for research efforts for Surveyor project, Mariner program, Voyager project and Deep Space Network
Voyager spacecraft system Task C summary Final technical report, Apr. 1966 - Jul. 1967
Mission planning, orbit determination, thrust vector control, and configuration management program for Voyager project - summary
Decision analysis of the Voyager Mars project.
Decision analysis applied to selection of Voyager mission configurations for Mars opportunities in 1970s
Status of the Deep Space Network-Voyager flight project telecommunications compatibility
Deep Space Network-Voyager telecommunications compatibility tests are described. A series of engineering level tests to determine the flight-ground interface compatibility and performance characteristics between the two systems were utilized. A summary and status of tests conducted on Voyager spacecraft are reported.
Voyager Briefing: Expectations of the Neptune Encounter
This NASA KSC video release presents a news briefing held Aug. 4, 1989 at NASA Headquarters three weeks after Voyager 2's official "encounter" with Neptune began. The video is comprised of two slide presentations followed by a short question and answer period. The press conference is moderated by Charles Redmond, (NASA Public Affairs), includes an introduction by Dr. Geoffrey A Briggs (Dir., Solar System Exploration Div.), and features Norman R. Haynes (Voyager Project Manager, JPL) and Dr. Edward C. Stone (Voyager Project Scientist, Cal Tech). Mr. Haynes' presentation centers on Voyager's history, engineering changes, and spacecraft trajectories while Dr. Stone presents the scientific aspects of Voyager, including the 11 scientific investigations planned for the mission, instruments used, and imaging techniques.
Voyager spacecraft system. Volume A - Preferred design for flight spacecraft and hardware subsystems, part II Final technical report, task B
Hardware subsystems for flight spacecraft, design reliability, interface control, and mission objectives - Voyager project
Voyager spacecraft system. Management and technical highlights Final technical report, task B
Management tasks associated with preparation and implementation of spacecraft system design, development, launch, and mission support for Voyager project
Voyager spacecraft system Task C orbit study. Volume III - Score computer program description and users manual Final technical report, Apr. 1966 - Jul. 1967
Computer program description and sample printout for orbital mission by Voyager project - users manual
National Aeronautics and Space Administration Jet Propulsion Laboratory 1966 annual report
Surveyor project, Mariner program, and Voyager project research activities and Deep Space Network /DSN/ operations