At least 19 records

High-Fidelity Numerical Wave Tank Verification & Validation Study: Wave Generation Through Paddle Motion: Preprint

This paper presents a numerical benchmark study of wave propagation due to a paddle motion using different high-fidelity numerical models, which are capable of replicating the nearly actual physical wave tank testing. A full time series of the measured wave generation paddle motion which was used to generate wave propagation in the physical wave tank will be utilized in each of the models contributed by IEA OES Task 10's participants, which includes both computational fluid dynamics (CFD) and smooth hydrodynamic particle (SPH). The high-fidelity simulations of the physical wave testcase will allow for the evaluation of the initial transient effects from wave ramp-up and its evolution in the wave tank over time for two representative regular waves with varying levels of nonlinearity. A couple of interesting metrics like the predicted wave surface elevation at select wave probes, wave period, and phase-shift in time will be assessed to evaluate the relative accuracy of numerical models versus experimental data within specified time intervals. These models will serve as a guide for modelers in the wave energy community and provide a base case to allow further and more detailed numerical modeling of the fixed Kramer Sphere Cases under wave excitation force wave tank testing.

HYDRO ENERGY,TIDAL AND WAVE POWER

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler

The Roles of Verification, Validation and Uncertainty Quantification in the NASA Standard for Models and Simulations

The National Aeronautics and Space Administration (NASA) recently issued an interim version of the Standard for Models and Simulations (M&S Standard) [1]. The action to develop the M&S Standard was identified in an internal assessment [2] of agency-wide changes needed in the wake of the Columbia Accident [3]. The primary goal of this standard is to ensure that the credibility of M&S results is properly conveyed to those making decisions affecting human safety or mission success criteria. The secondary goal is to assure that the credibility of the results from models and simulations meets the project requirements (for credibility). This presentation explains the motivation and key aspects of the M&S Standard, with a special focus on the requirements for verification, validation and uncertainty quantification. Some pilot applications of this standard to computational fluid dynamics applications will be provided as illustrations. The authors of this paper are the members of the team that developed the initial three drafts of the standard, the last of which benefited from extensive comments from most of the NASA Centers. The current version (number 4) incorporates modifications made by a team representing 9 of the 10 NASA Centers. A permanent version of the M&S Standard is expected by December 2007. The scope of the M&S Standard is confined to those uses of M&S that support program and project decisions that may affect human safety or mission success criteria. Such decisions occur, in decreasing order of importance, in the operations, the test & evaluation, and the design & analysis phases. Requirements are placed on (1) program and project management, (2) models, (3) simulations and analyses, (4) verification, validation and uncertainty quantification (VV&UQ), (5) recommended practices, (6) training, (7) credibility assessment, and (8) reporting results to decision makers. A key component of (7) and (8) is the use of a Credibility Assessment Scale, some of the details of which were developed in consultation with William Oberkampf, David Peercy and Timothy Trocano of Sandia National Laboratories. The focus of most of the requirements, including those for VV&UQ, is on the documentation of what was done and the reporting, using the Credibility Assessment Scale, of the level of rigor that was followed. The aspects of one option for the Credibilty Assessment Scale are (1) code verification, (2) solution verification, (3) validation, (4) predictive capability, (5) technical review, (6) process control, and (7) operator and analyst qualification.

Zang, Thomas A.

Stennis Space Center Verification & Validation Capabilities

Scientists within NASA s Applied Sciences Directorate have developed a well-characterized remote sensing Verification & Validation (V&V) site at the John C. Stennis Space Center (SSC). This site enables the in-flight characterization of satellite and airborne high spatial and moderate resolution remote sensing systems and their products. The smaller scale of the newer high resolution remote sensing systems allows scientists to characterize geometric, spatial, and radiometric data properties using a single V&V site. The targets and techniques used to characterize data from these newer systems can differ significantly from the techniques used to characterize data from the earlier, coarser spatial resolution systems. Scientists are also using the SSC V&V site to characterize thermal infrared systems and active lidar systems. SSC employs geodetic targets, edge targets, radiometric tarps, atmospheric monitoring equipment, and thermal calibration ponds to characterize remote sensing data products. The SSC Instrument Validation Lab is a key component of the V&V capability and is used to calibrate field instrumentation and to provide National Institute of Standards and Technology traceability. This poster presents a description of the SSC characterization capabilities and examples of calibration data.

Pagnutti, Mary

MCNP® Code Version 6.3.1: Verification & Validation Testing (Rev.1)

This report describes the verification and validation testing performed on MCNP® code version 6.3.1. The purpose of this report is to act as a compendium of test suite descriptions and results. Accordingly the document is divided into two parts. Part I (this part) describes each test suite in the following sections. Part II provides the results of testing each suite and comparisons to experimental and/or alternative computational results, as appropriate.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS

Stennis Space Center Verification & Validation Capabilities

Scientists within NASA#s Applied Research & Technology Project Office (formerly the Applied Sciences Directorate) have developed a well-characterized remote sensing Verification & Validation (V&V) site at the John C. Stennis Space Center (SSC). This site enables the in-flight characterization of satellite and airborne high spatial resolution remote sensing systems and their products. The smaller scale of the newer high resolution remote sensing systems allows scientists to characterize geometric, spatial, and radiometric data properties using a single V&V site. The targets and techniques used to characterize data from these newer systems can differ significantly from the techniques used to characterize data from the earlier, coarser spatial resolution systems. Scientists have used the SSC V&V site to characterize thermal infrared systems. Enhancements are being considered to characterize active lidar systems. SSC employs geodetic targets, edge targets, radiometric tarps, atmospheric monitoring equipment, and thermal calibration ponds to characterize remote sensing data products. Similar techniques are used to characterize moderate spatial resolution sensing systems at selected nearby locations. The SSC Instrument Validation Lab is a key component of the V&V capability and is used to calibrate field instrumentation and to provide National Institute of Standards and Technology traceability. This poster presents a description of the SSC characterization capabilities and examples of calibration data.

Pagnutti, Mary

Simulation Credibility: Advances in Verification, Validation, and Uncertainty Quantification

Decision makers and other users of simulations need to know quantified simulation credibility to make simulation-based critical decisions and effectively use simulations, respectively. The credibility of a simulation is quantified by its accuracy in terms of uncertainty, and the responsibility of establishing credibility lies with the creator of the simulation. In this volume, we present some state-of-the-art philosophies, principles, and frameworks. The contributing authors involved in this publication have been dedicated to advancing simulation credibility. They detail and provide examples of key advances over the last 10 years in the processes used to quantify simulation credibility: verification, validation, and uncertainty quantification. The philosophies and assessment methods presented here are anticipated to be useful to other technical communities conducting continuum physics-based simulations; for example, issues related to the establishment of simulation credibility in the discipline of propulsion are discussed. We envision that simulation creators will find this volume very useful to guide and assist them in quantitatively conveying the credibility of their simulations.

Simulation Credibility

Integrated Modeling and Simulation Verification, Validation, and Accreditation Strategy for Exploration Systems Mission Directorate

Models and simulations (M&S) are critical resources in the exploration of space. They support program management, systems engineering, integration, analysis, test, and operations and provide critical information and data supporting key analyses and decisions (technical, cost and schedule). Consequently, there is a clear need to establish a solid understanding of M&S strengths and weaknesses, and the bounds within which they can credibly support decision-making. Their usage requires the implementation of a rigorous approach to verification, validation and accreditation (W&A) and establishment of formal process and practices associated with their application. To ensure decision-making is suitably supported by information (data, models, test beds) from activities (studies, exercises) from M&S applications that are understood and characterized, ESMD is establishing formal, tailored W&A processes and practices. In addition, to ensure the successful application of M&S within ESMD, a formal process for the certification of analysts that use M&S is being implemented. This presentation will highlight NASA's Exploration Systems Mission Directorate (ESMD) management approach for M&S W&A to ensure decision-makers receive timely information on the model's fidelity, credibility, and quality.

Hale, Joseph P.

Verification, Validation and Credibility Assessment of a Computational Model of the Advanced Resistive Exercise Device (ARED)

The Advanced Resistive Exercise Device (ARED) is the resistive exercise device used by astronauts on the International Space Station (ISS) to mitigate bone loss and muscle atrophy due to extended exposure to microgravity (micro g). The Digital Astronaut Project (DAP) has developed a multi-body dynamics model of biomechanics models for use in spaceflight exercise physiology research and operations. In an effort to advance model maturity and credibility of the ARED model, the DAP performed verification, validation and credibility (VV and C) assessment of the analyses of the model in accordance to NASA-STD-7009 'Standards for Models and Simulations'.

Werner, C. R.

Modeling and Simulation Verification, Validation and Accreditation (VV&A): A New Undertaking for the Exploration Systems Mission Directorate

and Accreditation (VV&A) session audience, a snapshot review of the Exploration Space Mission Directorate s (ESMD) investigation into implementation of a modeling and simulation (M&S) VV&A program. The presentation provides some legacy ESMD reference material, including information on the then-current organizational structure, and M&S (Simulation Based Acquisition (SBA)) focus contained therein, to provide a context for the proposed M&S VV&A approach. This reference material briefly highlights the SBA goals and objectives, and outlines FY05 M&S development and implementation consistent with the Subjective Assessment, Constructive Assessment, Operator-in-the-Loop Assessment, Hardware-in-the-Loop Assessment, and In Service Operations Assessment M&S construct, the NASA Exploration Information Ontology Model (NExIOM) data model, and integration with the Windchill-based Integrated Collaborative Environment (ICE). The presentation then addresses the ESMD team s initial conclusions regarding an M&S VV&A program, summarizes the general VV&A implementation approach anticipated, and outlines some of the recognized VV&A program challenges, all within a broader context of the overarching Integrated Modeling and Simulation (IM&S) environment at both the ESMD and Agency (NASA) levels. The presentation concludes with a status on the current M&S organization s progress to date relative to the recommended IM&S implementation activity. The overall presentation was focused to provide, for the Verification, Validation,

Prill, Mark E.

Integrated Medical Model Verification, Validation, and Credibility

The Integrated Medical Model (IMM) was designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic (stochastic process) model based on historical data, cohort data, and subject matter expert opinion. A probabilistic approach is taken since exact (deterministic) results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation. METHODS: In 2008, the IMM team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) was published, the IMM team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. RESULTS: IMM VVC updates are compiled recurrently and include 7009 Compliance and Credibility matrices, IMM VV Plan status, and a synopsis of any changes or updates to the IMM during the reporting period. Reporting tools have evolved over the lifetime of the IMM project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the NASA-STD-7009 Guidance Document. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including Operations, Science and Technology Planning, and Exploration Planning. CONCLUSIONS: The VVC approach established by the IMM project of combining the IMM VV Plan with 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Validation

Integrated Medical Model (IMM) Project Verification, Validation, and Credibility (VVandC)

The Integrated Medical Model (IMM) Project supports end user requests by employing the Integrated Medical Evidence Database (iMED) and IMM tools as well as subject matter expertise within the Project. The iMED houses data used by the IMM. The IMM is designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic model based on historical data, cohort data, and subject matter expert opinion. A stochastic approach is taken because deterministic results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation, as well as lay the foundation for external review and application. METHODS: In 2008, the Project team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) [1] was published, the Project team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. Construction of these tools included meeting documentation and evidence requirements sufficient to meet external review success criteria. RESULTS: IMM Project VVC updates are compiled recurrently and include updates to the 7009 Compliance and Credibility matrices. Reporting tools have evolved over the lifetime of the IMM Project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the HRP NASA-STD-7009 Guidance Document working group and the NASA-HDBK-7009 [2]. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including operations, science and technology planning, and exploration planning. IMM v4.0 is slated for operational release in the FY015 and current VVC assessments illustrate the expected VVC status prior to the completion of customer lead external review efforts. CONCLUSIONS: The VVC approach established by the IMM Project of incorporating Project-specific recommended practices and guidelines for implementing the 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM Project represented a critical communication tool in providing clear and concise suitability assessments to IMM customers. These processes have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Walton, M.

Validation & Verification of CFD Models for Cryogenic Fluid Management of Propellant Tanks in Space

This article describes the need and the strategy for CFD model development, validation, and verification for Cryogenic Fluid Management (CFM) of Propellant Tanks in Space. It describes the type of CFD models that must be developed to address the future needs of Space CFM. It also discusses the two classes of experiments currently used to validate the fidelity of the CFD models. These two experiment classes are: (a) the small-scale simulant fluid science experiments that are equipped with scientific diagnostics to elucidate the underlying two-phase fluid physics of the CFM processes; and (b) the large-scale cryogenic experiments that assess the engineering performance of the propellant tank for storage and transfer. The current status of the CFD model development and validation is briefly assessed by presenting examples of segregated two-phase flow problems that have been successfully modeled. The future model development directions for CFM situations involving more complex interpenetrating phases are also defined.

Cryogenic Fluid Management

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin

Autonomy Verification & Validation Roadmap and Vision 2045

Advanced capabilities planned for the next generation of autonomous and increasingly autonomous air vehicles will include non-traditional components based on artificial intelligence, machine learning, and complex optimization and planning algorithms. These complex components will be used to provide enhanced safety and high-level decision-making functions. However, there are serious barriers to the deployment of autonomous aircraft in the National Airspace System (NAS). Current civil aviation certification processes are based on the concept that the correct behavior of a system or a component must be completely specified and verified prior to operation. This report from the Autonomy Verification and Validation (V&V) Roadmap and Vision 2045 project presents the most recent effort to build a comprehensive list of verification challenges and needs for autonomous aircraft, a roadmap to meet those autonomy V&V needs, the services they can enable, and point to the certification gaps they fill. To accomplish these goals, we assembled a team of world-class researchers from the aerospace industry (Boeing, Collins Aerospace, and GeneralElectric) and academia (University of Michigan, University of Texas, and Massachusetts Institute of Technology) with deep expertise in autonomy, aerospace systems, and assurance of Artificial Intelligence/machine learning systems.

Software Assurance

Sensor to User - NASA/EOS Data for Coastal Zone Management Applications Developed from Integrated Analyses: Verification, Validation and Benchmark Report

The NASA Applied Sciences Program seeks to transfer NASA data, models, and knowledge into the hands of end-users by forming links with partner agencies and associated decision support tools (DSTs). Through the NASA REASoN (Research, Education and Applications Solutions Network) Cooperative Agreement, the Oceanography Division of the Naval Research Laboratory (NRLSSC) is developing new products through the integration of data from NASA Earth-Sun System assets with coastal ocean forecast models and other available data to enhance coastal management in the Gulf of Mexico. The recipient federal agency for this research effort is the National Oceanic and Atmospheric Administration (NOAA). The contents of this report detail the effort to further the goals of the NASA Applied Sciences Program by demonstrating the use of NASA satellite products combined with data-assimilating ocean models to provide near real-time information to maritime users and coastal managers of the Gulf of Mexico. This effort provides new and improved capabilities for monitoring, assessing, and predicting the coastal environment. Coastal managers can exploit these capabilities through enhanced DSTs at federal, state and local agencies. The project addresses three major issues facing coastal managers: 1) Harmful Algal Blooms (HABs); 2) hypoxia; and 3) freshwater fluxes to the coastal ocean. A suite of ocean products capable of describing Ocean Weather is assembled on a daily basis as the foundation for this semi-operational multiyear effort. This continuous realtime capability brings decision makers a new ability to monitor both normal and anomalous coastal ocean conditions with a steady flow of satellite and ocean model conditions. Furthermore, as the baseline data sets are used more extensively and the customer list increased, customer feedback is obtained and additional customized products are developed and provided to decision makers. Continual customer feedback and response with new improved products are required between the researcher and customer. This document details the methods by which these coastal ocean products are produced including the data flow, distribution, and verification. Product applications and the degree to which these products are used successfully within NOAA and coordinated with the Mississippi Department of Marine Resources (MDMR) is benchmarked.

Hall, Callie

Transition of SRT Source Term Software to Modern Version Control System to Enable More Efficient Verification, Validation, and User Engagement

The Simplified Radionuclide Transport (SRT) code assists in reactor design and licensing by providing a detailed analysis of radionuclide transport under specific transient scenarios. This analysis is essential for ensuring that reactors meet safety and regulatory standards before they are authorized to operate. Mechanistic source term analysis, which involves a realistic evaluation of radionuclide behavior from the source to the environment, is a key component of this process. It provides a comprehensive understanding of potential release scenarios, supporting the development of robust safety measures.

22 GENERAL STUDIES OF NUCLEAR REACTORS