Search NASA⌕ Search

SEARCH · Search NASA

Results for “Version 5 Schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Version 5 Release Status and Plans: AIRS Science Team

This viewgraph presentation reviews the development of version 5 of Atmospheric Infrared Sounder (AIRS) software. The overarching goal for version 5 is to enhance AIRS software to expand its utility for climate research and to improve the impact on weather forecasting.

focus group↗

SPIKE: Application for ASTRO-D mission planning

SPIKE is a mission planning software system developed by a team of programmers at the STScI for use with the Hubble Space Telescope (HST). SPIKE has been developed for the purpose of automating observatory scheduling to increase the effective utilization and ultimately, scientific return from orbiting telescopes. High-level scheduling strategies using both rule-based and neural network approaches have been incorporated. Graphical displays of activities, constraints, and schedules are an important feature of the system. Although SPIKE was originally developed for the HST, it can be used for other astronomy missions including ground-based observatories. One of the missions that has decided to use SPIKE is ASTRO-D, a Japanese X-ray satellite for which the U.S. is providing a part of the scientific payload. Scheduled to fly in Feb. 1993, its four telescopes will focus X-rays over a wide energy range onto CCD's and imaging gas proportional counters. ASTRO-D will be the first X-ray imaging mission operating over the 0.5-12 keV band with high energy resolution. This combination of capabilities will enable a varied and exciting program of astronomical research to be carried out. ASTRO-D is expected to observe 5 to 20 objects per day and a total of several thousands per year. This requires the implementation of an efficient planning and scheduling system which SPIKE can provide. Although the version of SPIKE that will be used for ASTRO-D mission is almost identical to that used for the HST, there are a few differences. For example, ASTRO-D will use two ground stations for data downlinks, instead of the TDRSS system for data transmission. As a consequence ASTRO-D is constrained by limited on-board data storage capacity to schedule high data-rate observations during periods of frequent high bit rate observations accordingly. We will demonstrate the ASTRO-D version of SPIKE to show what SPIKE can provide and how efficiently it creates an observational schedule.

Isobe, T.↗

NextGen Operational Improvements: Will they Improve Human Performance

Modernization of the National Airspace System depends critically on the development of advanced technology, including cutting-edge automation, controller decision-support tools and integrated on-demand information. The Next Generation Air Transportation System national plan envisions air traffic control tower automation that proposes solutions for seven problems: 1) departure metering, 2) taxi routing, 3) taxi and runway scheduling, 4) departure runway assignments, 5) departure flow management, 6) integrated arrival and departure scheduling and 7) runway configuration management. Government, academia and industry are simultaneously pursuing the development of these tools. For each tool, the development process typically begins by assessing its potential benefits, and then progresses to designing preliminary versions of the tool, followed by testing the tool's strengths and weaknesses using computational modeling, human-in-the-loop simulation and/or field tests. We compiled the literature, evaluated the methodological rigor of the studies and served as referee for partisan conclusions that were sometimes overly optimistic. Here we provide the results of this review.

Beard, Bettina L.↗

Analytical fuel property effects: Small combustors

The study performed in Phase 1 of this program applies only to a T700/CT7 engine family type combustor functioning in the engine as defined and does not necessarily apply to other cycles or combustors of differing stoichiometry. The study was not extended to any of the fuel delivery accessories such as pumps or control systems, nor was there any investigation of potential systems problems which might arise as a consequence of abnormal properties such as density which might affect delivery schedules or aromatics content which might affect fuel system seals. The T700/CT7 engine is a front drive turboshaft or turboprop engine in the 1500-1800 shp (1120-1340 kW) class as currently configured with highpower core flows of about 10 lb/sec (4.5 kg/sec). It employs a straight-through annular combustion system less than 5 in. (12.5 cm) in length utilizing a machined ring film cooled construction and twelve low-pressure air blast fuel injectors. Commercial and Naval versions employ two 0.5 Joule capacitive discharge surface gap ignitors.

Cohen, J. D.↗

Development and operations of the Astrophysics Data System

The main effort in October 1992 was for the development and of the Astrophysics Data System (ADS) 3.1 graphical interface (GUI) and the preparation for its release. The beta-release for the GUI was made available to the nodes for testing. Development of the Abstract Server progressed satisfactorily. A test version was prepared for the ADASS meeting. Another major effort was the preparation for the user and nodes meetings on 5 and 6 November and for the ADASS conference on 2-4 November. February 1993 was highlighted by the preparation for the update release and its associated problems. We have the okay from the Commerce Department to export ADS. Foreign users can now sign on and receive the software. The main event during June was the AAS meeting. In the summer, the project decided on a new release schedule. The next major release is scheduled for January 1994 and will include major architectural improvements. In late spring 1994, a major release will include the new networking software.

Murray, S. S.↗

Estimation of Smoothing Error in SBUV Profile and Total Ozone Retrieval

Data from the Nimbus-4, Nimbus-7 Solar Backscatter Ultra Violet (SBUV) and seven of the NOAA series of SBUV/2 instruments spanning 41 years are being reprocessed using V8.6 algorithm. The data are scheduled to be released by the end of August 2011. An important focus of the new algorithm is to estimate various sources of errors in the SBUV profiles and total ozone retrievals. We discuss here the smoothing errors that describe the components of the profile variability that the SBUV observing system can not measure. The SBUV(/2) instruments have a vertical resolution of 5 km in the middle stratosphere, decreasing to 8 to 10 km below the ozone peak and above 0.5 hPa. To estimate the smoothing effect of the SBUV algorithm, the actual statistics of the fine vertical structure of ozone profiles must be known. The covariance matrix of the ensemble of measured ozone profiles with the high vertical resolution would be a formal representation of the actual ozone variability. We merged the MLS (version 3) and sonde ozone profiles to calculate the covariance matrix, which in general case, for single profile retrieval, might be a function of the latitude and month. Using the averaging kernels of the SBUV(/2) measurements and calculated total covariance matrix one can estimate the smoothing errors for the SBUV ozone profiles. A method to estimate the smoothing effect of the SBUV algorithm is described and the covariance matrixes and averaging kernels are provided along with the SBUV(/2) ozone profiles. The magnitude of the smoothing error varies with altitude, latitude, season and solar zenith angle. The analysis of the smoothing errors, based on the SBUV(/2) monthly zonal mean time series, shows that the largest smoothing errors were detected in the troposphere and might be as large as 15-20% and rapidly decrease with the altitude. In the stratosphere above 40 hPa the smoothing errors are less than 5% and between 10 and 1 hPa the smoothing errors are on the order of 1%. We validate our estimated smoothing errors by comparing the SBUV ozone profiles with other ozone profiling sensors.

Kramarova, N. A.↗

Developmental Flight Instrumentation System for the Crew Launch Vehicle

The National Aeronautics and Space Administration is developing a new launch vehicle to replace the Space Shuttle. The Crew Launch Vehicle (CLV) will be a combination of new design hardware and heritage Apollo and Space Shuttle hardware. The current CLV configuration is a 5 segment solid rocket booster first stage and a new upper stage design with a modified Apollo era J-2 engine. The current schedule has two test flights with a first stage and a structurally identical, but without engine, upper stage. Then there will be two more test flights with a full complement of flight hardware. After the completion of the test flights, the first manned flight to the International Space Station is scheduled for late 2012. To verify the CLV's design margins a developmental flight instrumentation (DFI) system is needed. The DFI system will collect environmental and health data from the various CLV subsystem's and either transmit it to the ground or store it onboard for later evaluation on the ground. The CLV consists of 4 major elements: the first stage, the upper stage, the upper stage engine and the integration of the first stage, upper stage and upper stage engine. It is anticipated that each of CLVs elements will have some version of DFI. This paper will discuss a conceptual DFI design for each element and also of an integrated CLV DFI system.

Crawford, Kevin↗

The noise dose range of the X-59 estimated from propagation simulations

NASA’s X-59 aircraft will soon be flown in a series of low-boom community noise surveys across the USA. Community test experimental designs will include noise dose schedules, which require an estimate of the noise dose range that X-59 can produce. To determine the dose range, propagation simulations using NASA’s PCBoom code were completed using CFD-generated X-59 C612A near-field pressure data for an on-design condition (Mach 1.4 at 53,200 feet) and two off-design conditions (Mach 1.4 at 46,000 ft and Mach 1.3 at 43,000 ft). Near-field data at four cardinal aircraft headings were propagated through one year of realistic atmospheric profiles from the Climate Forecast System Version 2 database at several USA locations. Statistics of the mean and range of the Perceived Level (PL) of the booms in the inner 40 km of each carpet as well as the carpet width were computed. Results indicate the typical inner carpet mean PL is approximately 70-87 dB depending on the aircraft condition. The typical PL range across the inner carpet is 6-8 dB (on-design) and 5-13 dB (off-designs). The carpet widths ranged from 32-55 km. Understanding these quantities for various flight and atmospheric conditions is important for planning X-59 community noise surveys.

X-59↗

Microstructural Evolution and Mechanical Properties of LP-DED NASA HR-1 – A Hydrogen Resistant AM Superalloy for Space Propulsion Applications

The National Aeronautics and Space Administration (NASA) has actively pursued metal additive manufacturing (AM) technologies for spaceflight applications since the late 2000s. AM offers transformative advantages in cost, schedule, part consolidation, and design flexibility. Among the various AM techniques, laser powder directed energy deposition (LP-DED) is particularly well suited for fabricating complex geometries with fine feature resolution. In propulsion systems that utilize high-pressure gaseous hydrogen—such as liquid hydrogen rocket engines—hydrogen environment embrittlement (HEE) presents a serious threat to material performance 1,2 . Mechanical property degradation under these conditions can compromise component reliability, especially under cyclic loading. To address this challenge, NASA developed NASA HR-1 (Hydrogen Resistant-1) as a solution for liquid rocket engine components operating in hydrogen-rich environments, using the LP-DED technique 3-9 . A key component in a liquid rocket engine is the exhaust nozzle, which is typically regeneratively cooled (regen) due to the high heat flux. NASA HR-1 was specifically developed for regen nozzle applications using hydrogen as a propellant, providing resistance to HEE, a critical issue for many materials. The AM version of NASA HR-1 was also formulated to achieve high ultimate tensile strength, along with high yield strength and ductility in this environment 5,6 . Low-cycle fatigue (LCF) is another important consideration in nozzle design, as components are expected to endure multiple starts and missions. Additionally, the LP-DED version of the alloy exhibits improved thermal conductivity compared to its wrought counterpart, which benefits nozzle cooling. Overall, NASA HR-1 offers an excellent balance of high strength, HEE resistance, LCF performance, thermal conductivity, and ductility to meet the demanding requirements of channel-cooled nozzles and other components used with hydrogen and other propellants. The LP-DED–processed NASA HR-1 requires several post-processing heat treatment steps to achieve the material properties desirable for its intended application 6 . These steps include stress relief, homogenization, solution annealing, and aging for precipitation hardening. The stress relief treatment mitigates residual stresses accumulated during the LP-DED process and minimizes the potential for distortion. Homogenization, a common step for AM materials, reduces elemental segregation and promotes recrystallization to develop a more equiaxed grain structure. The subsequent solution annealing treatment heats the part to a solid solution temperature to dissolve the undesirable η-phase that forms during cooling from homogenization, followed by rapid cooling to retain an η-phase–free microstructure. Finally, aging promotes precipitation of the strengthening γ′ phase in the alloy. The integration of compositional design and optimized thermal processing enables high-quality LP-DED NASA HR-1 components with excellent microstructural and mechanical stability. Improved chemical and microstructure homogeneity enhances ductility and fatigue resistance—both critical for safe and reliable operation in high-pressure hydrogen environments. NASA has successfully fabricated and hot-fire tested multiple subscale and full-scale channel wall nozzles using LP-DED NASA HR-1 5,6, 9-14 . These efforts included process refinements to support thin-wall construction and various channel geometries. Throughout development, several key observations emerged. After homogenization, the as-built columnar grain structure transforms into a fully equiaxed microstructure. However, subsequent treatments—such as solution annealing and aging—result in changes that are more difficult to track. The grain structure remains largely unchanged, and the γ′ precipitates, typically 5–10 nm in diameter, are beyond the resolution of scanning electron microscopy (SEM). While transmission electron microscopy (TEM) can resolve these fine precipitates, TEM sample preparation is time-consuming and difficult for LP-DED material. As an alternative, differential scanning calorimetry (DSC) offers a useful, qualitative approach to monitor precipitate evolution throughout different stages of heat treatment. The overall goal is to improve the understanding of how heat treatment affects the microstructure and mechanical performance of LP-DED NASA HR-1. This paper presents heat treatment design considerations, microstructural characterization, mechanical testing – including tensile and LCF testing in both air and hydrogen environments.

Superalloy↗

Discrete Event Simulation-Based Timeline Validation Using R2U2

The Gateway Vehicle Systems Manager (VSM), the top-level software control system in a distributed, hierarchical Autonomous System Management Architecture is, like most modern spacecraft software control systems, heavily data-driven. For example, schedules (timelines) will be developed on the ground and, due to the high degree of autonomy, contain complex procedures involving conditional branching, variable timing, and resource contention resolution. In order to verify that an uploaded timeline will function correctly, it is necessary to explore the feasible set of possible executions. While it is possible to test a timeline using a mission simulation, the complexity of the system and duration of a timeline limits the number of trials and therefore the test coverage. To address this problem, the VSM team is using a discrete event system model that can rapidly generate from a timeline sets of event sequences using Monte Carlo techniques. To achieve rapid and trustworthy checking of the event sequences, we use an offline version of the runtime model checking tool R2U2. This presentation describes the approach the VSM team is using to implement the discrete event simulation and evaluate event sequences using R2U2. The presentation will discuss: 1. Description of the timelines by VSM in the context of VSM operations 2. Expansion of a timeline into a sequence of atomic events 3. Adjustment, in the Monte Carlo environment, of an event sequence to account for uncertainty, external events, and failures 4. Definition of R2U2 input and mission-time linear temporal logic files 5. Generation and use of R2U2 verdict sequences 6. Lessons learned and future work

Verification↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

High Altitude Long Endurance Remotely Operated Aircraft - National Airspace System Integration - Simulation IPT: Detailed Airspace Operations Simulation Plan. Version 1.0

The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated deliverables necessary to achieve these goals and the needs of other Access 5 IPTs. The simulation environment chosen for this task is then outlined. This section includes a description of the system architecture, a list of the necessary assumptions made by the Simulation IPT, and the roles, responsibilities and interactions of simulation participants. The method of simulation conduct is presented in the next section with particular emphasis on scenario development and applicability to evaluation of Step 1 HALE-ROA operations. Following, data collection and analysis methods are discussed for air traffic specialists and air vehicle control station operators. Lastly, a schedule of Step 1 simulation activities is presented for reference.

Source record↗