Search NASA⌕ Search

SEARCH · Search NASA

Results for “Vogtle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience

The completion of Vogtle Units 3 and 4, despite significant cost and schedule overruns, a major bankruptcy, and a pandemic, demonstrates that the U.S. nuclear industry can still develop new supply chains, train a highly skilled workforce, and build large nuclear power plants. Vogtle, being a first-of-a-kind (FOAK) plant, faced overruns, but FOAK overruns can decrease with more deployments through a combination of design standardization and modularization, transferring and implementing lessons learned between consecutive projects, and innovation. This report quantifies the potential cost and schedule reductions in future AP1000 plants in the US and identifies the barriers in achieving those reductions. It starts with a summary and analysis of the cost and construction timeline data for AP1000 plants that started construction in the United States (Vogtle) and China. Motivated by the steep schedule reductions from the first to second series of AP1000 plants in China, a cost reduction model was developed to quantify potential reductions for future AP1000 builds in the US. Results show that within about 3 more builds, AP1000s can become economically attractive in large markets in the U.S., without leveraging the Investment Tax Credit (ITC) or Production Tax Credit (PTC), and much sooner if these tax credits are available. Importantly the financial risks for future AP1000 builds in the US might be much smaller than observed in the FOAK plants. The study also identifies various barriers for future builds including the availability of a supply chain and a skilled workforce, and emphasizes the importance of making investments to gather and implement lessons learned between consecutive projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant (Presentation)

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizable. To address this challenge, this study aims to develop a financial model that quantifies the risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of value at risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and assess the potential reduction in investor risk exposure. This paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verifying the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. This paper’s results present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizeable. To address this challenge, this study aims to develop a financial model that quantifies risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of Value at Risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and to assess the potential reduction in investor risk exposure. The paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verification of the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. The results of this paper present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Atom Probe characterization of neutron irradiated commercial ZIRLO® and AXIOM X2® alloys

As part of the Mechanistic Understanding of ZIrconium Corrosion (MUZIC) program, this team has been instrumental to obtain EPRI and Westinghouse sponsorships to prepare the neutron irradiated ZIRLO® and X2® from Vogtle nuclear power plant and ship them from Studsvik’s (Sweden) hot cells to Idaho National Laboratory (INL) to be part of the NSUF library. The uniqueness of these sets of neutron irradiated alloys is that they are at the same two extremes of the fuel cycles, allowing us to study the microchemistry evolution as a function of irradiation doses, exposure time and solute content. Advanced commercial Zirconium-Niobium (Zr-Nb) alloys, such as ZIRLO® and AXIOM®, have been developed by Westinghouse to enhance the corrosion resistance of fuel cladding material for longer service time. This study specifically aims at investigating the neutron irradiation induced Nb redistribution in AXIOM® X2® to understand the effect of neutron irradiation induced microchemistry changes and the irradiation enhanced corrosion resistance observed in ZrNb alloys. The detailed sample information on chemical composition and irradiation is given in shown in Table 1a and 1b respectively. To study the neutron IIP/nanoclusters and Nb concentration in the solid solution, atom probe tomography (APT) is the primary tool to obtain reliable chemical information. APT specimens were prepared in shielded focused ion beam (FIB) at the Irradiated Materials Characterization Laboratory (IMCL) at INL followed by APT analysis at CAES facility using LEAP 4000XR

36 MATERIALS SCIENCE↗

Pressurized Water Reactor Control Rod Ejection Analysis Using PARCS, RELAP5-3D, and BISON for High Burnup Fuel

This paper describes safety assessment of high burnup fuel (HBF) during loss of coolant accidents (LOCA), reactivity-initiated accidents (RIA), and anticipated operational occurrences (AOOs) for Southern Nuclear’s Vogtle Electric Generating plant (VEGP). A goal of this project is to create a multiphysics modeling approach in aspects of thermal hydraulics, neutronics, and fuel performance, as well as to use it in combination with experimental studies (Figure 1). In support of the project, this paper seeks to address fuel performance of a HBF pin during steady state conditions and during a control rod ejection (CRE) scenario using a loose coupling of PARCS, RELAP5-3D, and BISON.. The primary goal of this work was to analyze high burnup fuel behavior during a CRE scenario. The results indicate fuel failure is not expected to occur under the conditions presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗