Search NASA⌕ Search

SEARCH · Search NASA

Results for “WATER POLLUTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Efficient electrocatalytic valorization of chlorinated organic water pollutant to ethylene

Electrochemistry can provide an efficient and sustainable way to treat environmental waters polluted by chlorinated organic compounds. However, the electrochemical valorization of 1,2-dichloroethane (DCA) is currently challenged by the lack of a catalyst that can selectively convert DCA in aqueous solutions into ethylene. Here, in this work, we report a catalyst comprising cobalt phthalocyanine molecules assembled on multiwalled carbon nanotubes that can electrochemically decompose aqueous DCA with high current and energy efficiencies. Ethylene is produced at high rates with unprecedented ~100% Faradaic efficiency across wide electrode potential and reactant concentration ranges. Kinetic studies and density functional theory calculations reveal that the rate-determining step is the first C–Cl bond breaking, which does not involve protons—a key mechanistic feature that enables cobalt phthalocyanine/carbon nanotube to efficiently catalyse DCA dechlorination and suppress the hydrogen evolution reaction. The nanotubular structure of the catalyst enables us to shape it into a flow-through electrified membrane, which we have used to demonstrate >95% DCA removal from simulated water samples with environmentally relevant DCA and electrolyte concentrations.

Choi, Chungseok↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements:(1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020 (Copy for Informational Puproses Only)

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements: (1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Adapting ecological risk valuation for natural resource damage assessment in water pollution

Highlights: • An approach is proposed to assess water damages from pollution incident. • Sewage treatment cost is analyzed to estimate the value of water quality damage. • DEA is employed to classify samples of sewage plants based on their efficiency. • The relation between treatment cost and the decrease of COCs is determined. • The range of damage cost is determined based on efficient and inefficient samples. Ecological risk assessment can address requirements of natural resource damage assessment by quantifying the magnitude of possible damages to the ecosystem. This paper investigates an approach to assess water damages from pollution incident on the basis of concentrations of contaminants. The baseline of water pollution is determined with not-to-exceed concentration of contaminants required by water quality standards. The values of damage cost to water quality are estimated through sewage treatment cost. To get a reliable estimate of treatment cost, DEA is employed to classify samples of sewage plants based on their efficiency of sewage treatment. And exponential fitting is adopted to determine the relation between treatment cost and the decrease of COCs. The range of damage costs is determined through the fitting curves respectively based on efficient and inefficient samples.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Material Recycling Facility

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Asphalt Batch Plant

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan for C902 Data Center Replacement Facility

This Storm Water Pollution Prevention Plan (SWPPP) has been prepared for the C902 Data Center Replacement Facility in Livermore, California. C902 Data Center Replacement Facility is a proposed development consisting of the construction of an approximately 8,900 square foot new single-story building and an approximately 4,200 square foot equipment yard. The project also includes paved parking lot, hardscape and landscape consisting of 2-6" stone at retention ponds and wood mulch elsewhere. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Roads and Grounds Facility and Associated Sigma Mesa Staging Area

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

E Tunnel Wastewater Disposal System Quarterly Monitoring Report Nevada National Security Site, Nevada Water Pollution Control Permit NEV 96021, Third Quarter 2018

This report includes the results of the E Tunnel Wastewater Disposal System (ETDS) inspections and monitoring for July, August, and September 2018. Monitoring and sampling activities were performed in accordance with the requirements of Water Pollution Control Permit NEV 96021, Revision 1, effective October 1, 2013. Monthly monitoring was conducted on July 16, August 13, and September 13, 2018. Operating personnel measured the instantaneous flow rate (see Table 1), log hydrogen ion activity (pH), temperature, and specific conductance of the discharge water (see Table 2). Monthly inspections also included an assessment of the general condition of the berms, including ponding (the water levels relative to the overflow pipes); any tunneling or burrowing into the berms; soil conditions on and around the berms, including erosion or sloughing of the interior or exterior slopes of the berms; seeps at the toe of the berms; the presence of any deep-rooting botanicals on the berms; and the physical condition of fencing (see Tables 3 through 7). Monthly rainfall quantities are presented in Table 8.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory facility (Project) located at Sandia National Laboratories, 7011 East Avenue, CA. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The project proposes converting an asphalt parking lot into a new high bay machine shop building and a low bay office building. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area of 1.6 acres exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

54 ENVIRONMENTAL SCIENCES↗

E-Tunnel wastewater discharge permit quarterly monitoring report. Water pollution control permit Nev 96021, third quarter 2020

Monitoring and sampling activities are performed at the E-Tunnel Wastewater Disposal System (ETDS ) in accordance with the requirements of Water Pollution Control (WPC) Permit NEV 96021, Revision 1, which is effective October 1, 2013. Although the end date of the WPC permit is September 30, 2018, the Nevada Division of Environmental Protection (NDEP), in a letter dated September 21, 2018, provided guidance that indicated the WPC Permit NEV 96021, Revision 1, is in effect until NDEP notifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office otherwise. This QMR includes the results of monthly inspections and monitoring for July, August, and September 2020. Monthly inspections and monitoring were conducted on July 21, August 19, and September 16, 2020. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurement s of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the ETDS discharge. The report will be submitted to the State of Nevada.

54 ENVIRONMENTAL SCIENCES↗

E Tunnel Wastewater Disposal System Quarterly Monitoring Report Nevada National Security Site, Nevada Water Pollution Control Permit NEV 96021, Second Quarter 2018

This report includes the results of the E Tunnel Wastewater Disposal System (ETDS) inspections and monitoring for April, May and June 2018. Monitoring and sampling activities were performed in accordance with the requirements of Water Pollution Control Permit NEV 96021, Revision 1, effective October 1, 2013.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

E Tunnel Wastewater Disposal System Quarterly Monitoring Report and Annual Summary Report Nevada National Security Site, Nevada, Water Pollution Control Permit NEV 96021: Fourth Quarter and Calendar Year 2018

This annual report includes the results of the ETOS sample collection and analysis of the effluent water from the ETOS. The effluent sample was collected on October 9, 2018. Sampling activities were performed in accordance with the requirements of WPC Permit NEV 96021, Revision 1, which is effective October 1, 2013. Although the stated end date of the WPC permit is September 3 O, 2018, the NDEP, in a letter dated September 21, 2018, provided guidance that indicated the WPC Permit NEV 96021, Revision 1, is in effect until NOEP notifies NNSA/NFO otherwise.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site E-Tunnel Wastewater Disposal System Quarterly Monitoring Report, Water Pollution Control Permit NEV 96021 (First Quarter Calendar Year 2020)

This report includes the results of monthly inspections and monitoring for January, February, and March 2020. Monthly inspections and monitoring were conducted on January 15, February 12, and March 17, 2020. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurements of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the E-Tunnel Wastewater Disposal System discharge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗