Search NASA⌕ Search

SEARCH · Search NASA

Results for “WELLHEADS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Wellhead with non-ferromagnetic materials

Wellheads for coupling to a heater located in a wellbore in a subsurface formation are described herein. At least one wellhead may include a heater located in a wellbore in a subsurface formation; and a wellhead coupled to the heater. The wellhead may be configured to electrically couple the heater to one or more surface electrical components. The wellhead may include at least one non-ferromagnetic material such that ferromagnetic effects are inhibited in the wellhead. Systems and methods for using such wellheads for treating a subsurface formation are described herein.

36 MATERIALS SCIENCE↗

Coalbed Methane Procduced Water Treatment Using Gas Hydrate Formation at the Wellhead

Water associated with coalbed methane (CBM) production is a significant and costly process waste stream, and economic treatment and/or disposal of this water is often the key to successful and profitable CBM development. In the past decade, advances have been made in the treatment of CBM produced water. However, produced water generally must be transported in some fashion to a centralized treatment and/or disposal facility. The cost of transporting this water, whether through the development of a water distribution system or by truck, is often greater than the cost of treatment or disposal. To address this economic issue, BC Technologies (BCT), in collaboration with Oak Ridge National Laboratory (ORNL) and International Petroleum Environmental Consortium (IPEC), proposed developing a mechanical unit that could be used to treat CBM produced water by forming gas hydrates at the wellhead. This process involves creating a gas hydrate, washing it and then disassociating hydrate into water and gas molecules. The application of this technology results in three process streams: purified water, brine, and gas. The purified water can be discharged or reused for a variety of beneficial purposes and the smaller brine can be disposed of using conventional strategies. The overall objectives of this research are to develop a new treatment method for produced water where it could be purified directly at the wellhead, to determine the effectiveness of hydrate formation for the treatment of produced water with proof of concept laboratory experiments, to design a prototype-scale injector and test it in the laboratory under realistic wellhead conditions, and to demonstrate the technology under field conditions. By treating the water on-site, producers could substantially reduce their surface handling costs and economically remove impurities to a quality that would support beneficial use. Batch bench-scale experiments of the hydrate formation process and research conducted at ORNL confirmed the feasibility of the process. However, researchers at BCT were unable to develop equipment suitable for continuous operation and demonstration of the process in the field was not attempted. The significant achievements of the research area: Bench-scale batch results using carbon dioxide indicate >40% of the feed water to the hydrate formation reactor was converted to hydrate in a single pass; The batch results also indicate >23% of the feed water to the hydrate formation reactor (>50% of the hydrate formed) was converted to purified water of a quality suitable for discharge; Continuous discharge and collection of hydrates was achieved at atmospheric pressure. Continuous hydrate formation and collection at atmospheric conditions was the most significant achievement and preliminary economics indicate that if the unit could be made operable, it is potentially economic. However, the inability to continuously separate the hydrate melt fraction left the concept not ready for field demonstration and the project was terminated after Phase Two research.

01 COAL, LIGNITE, AND PEAT↗

Increasing the Reliability, Service Life, and Ecological Safety of the Stuffing Boxes of Wellhead Equipment of Wells that Operate by Means of Deep-Well Sucker-Rod Pumping Units

A novel design of an axial (self-centering) blowout prevention well-head seal that eliminates a number of the drawbacks in the wellhead equipment which is used today and whicuh possesses high services qualities, reliability indicators, and service life is proposed. The design is protected by Russian Patent No. 2573887.

42 ENGINEERING↗

Machine learning models of intermittent operation of RO wellhead water treatment for salinity reduction and nitrate removal

Machine learning models were developed for intermittent multi-mode operation of a wellhead reverse osmosis water purification and desalination system to predict salt passage, nitrate passage, and permeate flux. The models, based on long short-term memory (LSTM) recurrent neural network (RNN) architecture, included an attention mechanism to increase model performance in proximity of the regulatory limit for nitrate. Training and testing of the models for the Startup, Production, Shutdown and Flushing operational modes were based on operational data (consisting of 22 process variables per data sample) acquired every 2–5 s over a six-month period. The significant sets of model input attributes for the different operational modes were assessed via Spearman ranking correlation, Self-Organizing Map (SOM) analysis and feed forward feature selection (FFFS). Although the variability of nitrate passage, salt passage and permeate flux was significant over the four operational modes, prediction performance for the three outcomes were with R2 and Average Absolute Relative Error (AARE) of 0.78–0.95 and 2.96–6.16 %, respectively. Model updates post membrane elements replacement demonstrated similar levels of prediction accuracy. The study results suggest that there is merit in exploring the utility of multi-mode models for sensor fault detection, data imputation, and for potential use in model-predictive control.

Intermittent RO operation↗

Techno-economic assessment of distributed wellhead RO water treatment for nitrate removal and salinity reduction: A field study in small disadvantaged communities

Techno-economic analysis of distributed wellhead water treatment and desalination (DWTD) systems was carried out based on a three-year field study in three small, disadvantaged communities (DACs) to evaluate the reliability and affordability of upgrading their impaired well water. The local water supplies of the three study DACs, located in Salinas Valley, California, were contaminated with nitrate at levels (~ 12–87 mg/L NO$^{-}_{3}$ - N) ) above the California maximum contaminant level (MCL) of 10 mg/L NO$^{-}_{3}$ - N , and had elevated water salinity (~600–1,600 mg/L total dissolved solids(TDS)) above its secondary MCL (SMCL) of 500 mg/L TDS. Well water nitrate removal and salinity reduction were accomplished via reverse osmosis (RO) based DWTD systems that operated autonomously, supported by remote monitoring and supervisory cyberinfrastructure. Reliable DWTD operation provided treated water quality, with respect to nitrate and salinity, in the range of 0.5–6.3 mg/L NO$^{-}_{3}$ - N and 57–161 mg/L TDS, respectively, which were well below the respective MCL and SMCL. The levelized cost of water treatment was in the range of ~$$2/m 3 - $$2.9/m 3 which aligns with typical residential water costs in California and in the study region, and monthly residential water costs (39 dollars-74 dollars/residential unit/month) were also within the range in California. The study showcased the DWTD approach as a viable and potentially scalable solution for upgrading impaired local potable water supply of communities lacking centralized water delivery infrastructure. However, streamlined permitting processes and standardized regulatory frameworks are critical to promoting wider adoption and maximizing the socio-economic benefits of the DWT approach. Moreover, DACs are likely to require government subsidies in order to cover the CapEx of DWTD systems in addition to upgrade of site infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of Wellhead Safety Zone Criteria for Underground Gas Storage Facilities

Underground natural gas storage facilities are a vital part of the US national infrastructure. However, the concept of hazard zones from fires and explosions at these facilities is not nearly as well defined as it is for natural gas transmission pipelines. This report will take a well-established criterion for pipeline hazard zones (the pipeline impact radius or PIR) and and adapt it to underground gas storage facilities. The new safety area predicted for an underground gas storage facility will be called the wellhead safety zone or WSZ. Comparisons will be made between the resulting WSZ formula and the observed damage zone from known accidents at gas storage facilities.

03 NATURAL GAS↗

Wellhead Compressor, Electrically-Powered Centrifugal, 500 HP

This unit process quantifies the amount of electricity required and methane emissions associated with the operation of a 500 horsepower, 95% efficiency electric centrifugal wellhead compressor for natural gas wells. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=5610905D-D91D-48DB-896B-BF083A46913E

03 NATURAL GAS↗

Wellhead Compressor, Gas-Powered Centrifugal, 200 HP

This unit process quantifies the amount of electricity required and methane emissions associated with the operation of a 187 horsepower, gas-fired centrifugal wellhead compressor for natural gas wells. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=2602E051-BE3E-4FC9-9E15-FA280C3E9EC2

03 NATURAL GAS↗

Wellhead Compressor, Gas-Powered Reciprocating, 200 HP

This unit process quantifies the amount of electricity required and methane emissions associated with the operation of a 200 horsepower, gas-powered reciprocating wellhead compressor for natural gas wells. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=E10E16AE-B71D-463B-9878-330EAB3D99DD

03 NATURAL GAS↗

Benchmarking of Wellhead Safety Zone Criteria for Underground Gas Storage Facilities

Underground natural gas storage facilities are a vital part of the U. S. national infrastructure. However, the concept of hazard zones from fires and explosions at these facilities is not nearly as well defined as it is for natural gas transmission pipelines. This report will take a safety area predicted for underground gas storage facilities called the Wellhead Safety Zone or WSZ and benchmark it against the observed damage zone from the drill rig accident near Rama, Louisiana on November 15, 2007. When combined with earlier accidents, this new benchmark indicates the WSZ formula gives an accurate indication of the hazard radius from underground gas storage facility accidents over a wide range of casing sizes and pressures.

03 NATURAL GAS↗

A market survey of geothermal wellhead power generation systems

The market potential for a portable geothermal wellhead power conversion device is assessed. Major study objectives included identifying the most promising applications for such a system, the potential impediments confronting their industrialization, and the various government actions needed to overcome these impediments. The heart of the study was a series of structured interviews with key decision-making individual in the various disciplines of the geothermal community. In addition, some technical and economic analyses of a candidate system were performed to support the feasibility of the basic concept.

Leeds, M. W.↗

International test and demonstration of a 1-MW wellhead generator: Helical screw expander power plant

A 1-MW wellhead generator was tested in 1980, 1981, and 1982 by Mexico, Italy, and New Zealand at Cerro Prieto, Cesano, and Broadlands, respectively. The total flow helical screw expander portable power plant, Model 76-1, had been built for the U.S. Government and field-tested in Utah, USA, in 1978 and 1979. The expander had oversized internal clearances designed for self-cleaning operation on fluids that deposit adherent scale normally detrimental to the utiliation of liquid dominated fields. Conditions with which the expander was tested included inlet pressures of 64 to 220 psia, inlet qualities of 0% to 100%, exhaust pressures of 3.1 to 40 psia, electrial loads of idle and 110 to 933 kW, electrical frequencies of 50 and 60 Hz, male rotor speeds of 2500 to 4000 rpm, and fluid characteristics to 310,000 ppm total dissolved solids and noncondensables to 38 wt % of the vapor. Some testing was done on-grid. Typical expander isentropic efficiency was 40% to 50% with the clearances not closed, and 5 percentage points or more higher with the clearances partly closed. The expander efficiency increased approximately logarithmically with shaft power for most operations, while inlet quality, speed, and pressure ratio across the machine had only small effects. These findings are all in agreement with the Utah test results.

Mckay, R. A.↗

Ascorbic Acid Stability and pH Testing to Support RWM-018 Pilot Scale Wellhead Treatment System Feasibility Determination

A multitude of groundwater remediation techniques for chlorinated volatile organic compounds (cVOCs) have been conducted at the A/M-Areas of the Savannah River Site (SRS). Historical in-situ chemical oxidation (ISCO) injections of potassium permanganate and sodium persulfate conducted in 2018 and 2020, have left residual oxidant concentrations in the A/M-Area groundwater system. ISCO events targeted dense non-aqueous phase liquids (DNAPLs) through the injection of strong oxidants within plume zones upgradient of current groundwater recovery wells RWM-008 and RWM-018. These residual oxidants could significantly impede the operation of the mercury removal system needed to meet National Pollutant Discharge Elimination System (NPDES) permit requirements for the ongoing pump-and-treat system that hydraulically controls potions of the A/M-Area plume. Effluent treated groundwater from this system is discharged to surface water at the receiving outfall of the M-1 Air Stripper. To prevent interference of the M-1 Air Stripper system by residual oxidants, groundwater recovery has been ceased at well RWM-018. Modeling of oxidant transport in A/M-Area from ISCO estimated that the potential oxidant load contributed by RWM-018 could be as high as 120 mg/L. It is also possible that oxidants may be contributed via pumping at well RWM-008 in the near future as residual oxidants within the aquifer migrate toward its zone of influence. Savannah River National Laboratory (SRNL) has conducted research to investigate potential pre-treatment chemicals to neutralize these residual oxidants, before reaching the M-1 Air Stripper, to allow for resumed groundwater recovery at RWM-018 and continued pumping at RWM-008. Deployment of ascorbic acid for neutralization of residual oxidants at RWM-018 (and possibly RWM-008) is recommended based on results from previous reductant testing (SRNL, 2021). For a maximum estimated oxidant load at RWM-0018, a well-head treatment system would need to dose about 400 gallons of ascorbic acid each month to ensure complete neutralization. A second system with additional reagent should also be considered for deployment at RWM-008.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Demonstration of The Krauklis Seismic Wave In A Novel Mva Method For Geologic CO 2 Storage

The Energy & Environmental Research Center (EERC) conducted a feasibility study of a new, low-impact geophysics monitoring method designed to incrementally track the saturation front of CO 2 injected into a reservoir. The method leverages a new way of transmitting energy from the surface to the reservoir and employs a new subsurface signal called the Krauklis wave (K-wave) and other guided waves for seismic monitoring. The EERC partnered with Seismos, Inc., the company that holds the exclusive technology license for this method, to advance development of K-wave technology, and Denbury Onshore, LLC, to field-test the system. The system was field-tested at Denbury’s Bell Creek oil field, currently undergoing CO 2 -based enhanced oil recovery (EOR) in southeastern Montana. The K-wave system uses a wellhead-mounted source to propagate energy down the wellbore in the form of a tube wave and through the well perforations into the reservoir. Part of the energy transmitted through the perforations into the reservoir converts to slow moving K-waves and/or other guided waves that are expected to propagate through the formation to neighboring wells. The propagated signal would induce tube waves in the neighboring wells that return to the surface to be recorded with a wellhead-mounted receiver. The propagation time of the signal is directly affected by the presence of CO 2 between the wells, so the difference in transit time of the returning signal between pre- and postinjection data sets could be used to help define the lateral extent of a CO 2 saturation front. Objectives of the study were to demonstrate, validate, and evaluate the K-wave method’s ability to monitor the morphology of injected CO 2 and estimate saturation distribution. Results from the demonstration were to be compared to conventional 4-D surface seismic methods, dynamic reservoir simulations, and CO 2 breakthrough data to validate the technology and provide useful information that may result in improvements. Prior to mobilizing for the full-scale K-wave baseline survey, a field test was conducted to better understand wellhead hardware configurations and test the response from the Bell Creek reservoir using three wells. Useful operational information resulted but signal from the first-generation gas release/gas injection source was not recorded in neighboring wells. After the initial field test, numerical modeling of the K-wave method was initiated using parameters specific to the Bell Creek Field. Modeling results indicated that the fundamental concepts behind the K-wave method exhibited problems and revealed a significantly greater attenuation of the signal at the wellbore perforations than expected, totaling on the order of 10-8 from source well to receiver well over a 400-m well spacing. Modeling also showed that greater source frequency bandwidth was needed to produce guided waves within a 30-foot-thick reservoir layer such as that at Bell Creek and that reservoir layer seismic velocity would need to be slower than the velocities of the bounding layers in order to act as a wave guide opposite to what exists at Bell Creek. Modeling results prompted a second field test with a stronger, second-generation displacement source developed in the interim. Concurrent with the second field test, a 3-D seismic survey was acquired to serve as a baseline for project validation and to serve as a monitor data set for the portion of the project area where CO 2 injection had already commenced. The new source was tested using a four-well geometry and failed to produce a detectable signal, which appeared to confirm modeling results and indicated that the Bell Creek Field is not an ideal site for the K-wave test. It was concluded that a source with sufficient strength and bandwidth could not be built to overcome the factors discovered by the modeling within a reasonable amount of time. Several other sites undergoing CO 2 -based EOR were also evaluated; however, none of these sites was amenable because of geology, limitations of source and receiver hardware, or the advanced state of the CO 2 flood. In addition, two other configurations of the source and receiver layout were considered; however, these design modifications either changed the scope of the project or did not meet the goals of the Carbon Storage Program. In consultation with the U.S. Department of Energy (DOE) Project Manager and Technology Manager, a no-go decision was invoked to forego additional expenditures as the technology would not meet current project objectives. Project activities to date have moved the technology forward by developing modeling equations that can be applied elsewhere, advanced the state of wellhead sensors and sources, and spurred improvements to field operations. The 3-D seismic survey in the project area and the dynamic reservoir simulations done as part of this study have provided value for ongoing and future synergistic activities at Bell Creek related to DOE carbon storage goals.

54 ENVIRONMENTAL SCIENCES↗

Annular Pressure Buildup Calculation When Annulus Contains Gas

During the execution of technological operations such as multiple pressure relief or foam separation during well injection, a gas column can form at the wellhead in the annular space, leading to annular pressure buildup (APB). Based on the theory of heat transfer, a model was proposed for calculating the wellbore heat transfer during production. Taking into account the expansion and compression of the fluid, changes in the wellhead volume, the thermodynamic characteristics of the liquid, and the equation of state of the gas, APB calculations were performed. Based on these parameters, the influence of the gas column height on APB was evaluated. The results of the studies show that the coefficients of expansion and compressibility in the annulus depend on density, pressure and temperature: the higher the productivity of the gas well, the higher the temperature and pressure in the annulus; the greater the height of the gas column, the lower the pressure at the wellhead. For a well with a productivity of 30· 10{sup 4} m{sup 3}/day and gas column height of 70 m in the annulus, the APB is reduced to atmospheric pressure. Studies of the model for calculating APB of the annular trapped gas provide a theoretical basis for developing optimal technological parameters for the operation of gas wells.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗