Klickitat Valley Health Central Utility Plant Modernization
This project replaced legacy heating and cooling equipment at Klickitat Valley Health (KVH), a rural hospital in Goldendale, Washington. Work included constructing a new chiller building, installing modern hydronic piping systems, replacing the main Emergency Department air handler (Air Handlining Unit (AHU-1)), upgrading electrical systems, and converting the Emergency Department wing from electric reheat to hydronic heating and cooling. Commissioning, testing, adjusting, and balancing were completed under this grant. These upgrades improve energy efficiency, operational resilience, and system reliability while preparing the campus for future electrification and renewable energy integration. They also support growth in healthcare services for a rural population. The project directly reduces energy costs and provides a foundation for future decarbonization measures, including a FEMA-funded microgrid and a large-scale ground source heat pump (GSHP) project. These follow-on initiatives would not have been possible without the hydronic backbone built through this project.