Results for “Washington Closure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N, and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.

100 Area↗

Applying Lean Concepts to Waste Site Closure - 13137

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How the Lean Management System is Working on a Closure Project - 13242

Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System-Scale Model of Aquifer, Vadose Zone, and River Interactions for the Hanford 300 Area - Application to Uranium Reactive Transport

This report represents a synthesis and integration of basic and applied research into a system-scale model of the Hanford 300 Area groundwater uranium plume, supported by the U.S. Department of Energy’s Richland Operations (DOE-RL) office. The report integrates research findings and data from DOE Office of Science (DOE-SC), Office of Environmental Management (DOE-EM), and DOE-RL projects, and from the site remediation and closure contractor, Washington Closure Hanford, LLC (WCH). The three-dimensional, system-scale model addresses water flow and reactive transport of uranium for the coupled vadose zone, unconfined aquifer, and Columbia River shoreline of the Hanford 300 Area. The system-scale model of the 300 Area was developed to be a decision-support tool to evaluate processes of the total system affecting the groundwater uranium plume. The model can also be used to address “what if” questions regarding different remediation endpoints, and to assist in design and evaluation of field remediation efforts. For example, the proposed cleanup plan for the Hanford 300 Area includes removal, treatment, and disposal of contaminated sediments from known waste sites, enhanced attenuation of uranium hot spots in the vadose and periodically rewetted zone, and continued monitoring of groundwater with institutional controls. Illustrative simulations of polyphosphate infiltration were performed to demonstrate the ability of the system-scale model to address these types of questions. The use of this model in conjunction with continued field monitoring is expected to provide a rigorous basis for developing operational strategies for field remediation and for defining defensible remediation endpoints.

uranium reactive transport, parallel computing↗

The Success of the River Corridor Closure Project - A Look at the Last 10 Years - 16105

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office (DOE-RL) to manage the River Corridor Closure Project (RCCP), a 10-year contract in which WCH will clean up 572 km{sup 2} (220 mi{sup 2}) of contaminated land at the Hanford Site in Richland, Washington. Since 2005, WCH has safely and efficiently performed field remediation and building demolition activities along the Columbia River corridor. To date, 99% of the buildings have been demolished and field remediation is 88% complete. These numbers represent work on 323 buildings and 571 waste sites, respectively. From a safety perspective, WCH has experienced an outstanding safety record with a total of 230 first aid cases, 47 recordable only cases, 2 restricted work day cases, and 7 lost work day cases. WCH exceeded 6 million hours worked without a lost time injury on September 30, 2015, for the second time in the contract period. The project has worked a total of 23,217,840 hours. WCH has experienced extensive successes over the last 10 years. These successes include, but are not limited to, explosive demolition, technological applications, and creative land restoration techniques. Efficiencies in work planning, execution, and subcontracting will also be shared. The photographs showing how the landscape has changed are impressive, as is some of the video captured during explosive demolition of a reactor stack in the 100-N Area of the Hanford Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 'People Plan' Concept for Contract Closure - 12432

The U.S. Department of Energy's (DOE) first-of-a-kind closure project at the Hanford Site in Richland, Washington, still has more than 3 years to run, but its contractor, Washington Closure Hanford (WCH), has already started its plans for going out of business. It will be the first contract that closes in increments and, paramount to its success, will be its ability to provide a disciplined and positive approach to release personnel while at the same time retaining personnel critical to timely and safe completion of the work scope. In May 2011, WCH produced the people plan, a program that maximizes communication and support for employees being released, provides an incentivization strategy to retain personnel to the end of their assignments, and reflects a sensitivity to the long-term goals of the contract and WCH's parent companies. The combination of all of these efforts equal one thing: treating employees with respect by providing specific information in a timely manner; respecting employees by sharing as much information as possible, as soon as possible, with as much detail as possible; and respecting each individual's ability to be in control of their next step in their life or career. The project is only in the second ORW and has 13 more before the end of the contract. That time remaining will continue to bring new challenges and unknowns, but the confidence and trust of the employees is proving to be solid. This is largely as a result of the stability provided by the people plan program. A success that can only truly be measured by the continued positive response it has already received from WCH's employees. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Taking Closure to the Next Level - 13030

The River Corridor Closure Project (RCCP) is the Hanford Site's first closure project and when it is complete, in 2015, it will have cleaned up 220 mi{sup 2} of contaminated land adjacent to the Columbia River. Washington Closure Hanford (WCH) was selected by the DOE to manage the removal and cleanup of Hanford's nuclear legacy along the River Corridor. Work began in 2005 and is now more than 85% complete with more than 2 years left in the contract. A Closure Team was commissioned in December 2009 and has since issued a closure strategy and a disciplined three-phase approach to transition land parcels to DOE, Richland Operations Office (DOE-RL) as cleanup is completed. This process supports DOE-RL objectives for progressive footprint reduction based on the division of the River Corridor into geographical land parcels. It also allows for incremental area-by-area transition and turnover to the Long-Term Stewardship program. Several important milestones stand between now and the successful end of the RCCP. They include overall funding impacts, working with DOE-RL on new scope additions, meeting regulatory milestones, and maintaining a strong safety performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NAVIGATING A QUALITY ROUTE TO A NATIONAL SAFETY AWARD

Deming quality methodologies applied to safety are recognized with the National Safety Council's annual Robert W. Campbell Award. Over the last ten years, the implementation of Statistical Process Control and quality methodologies at the U.S. Department of Energy's Hanford Site have contributed to improved safety. Improvements attributed to Statistical Process Control are evidenced in Occupational Safety and Health records and documented through several articles in Quality Progress and the American Society of Safety Engineers publication, Professional Safety. Statistical trending of safety, quality, and occurrence data continues to playa key role in improving safety and quality at what has been called the world's largest environmental cleanup project. DOE's Hanford Site played a pivotal role in the nation's defense beginning in the 1940s, when it was established as part of the Manhattan Project. After more than 50 years of producing material for nuclear weapons, Hanford, which covers 586 square miles in southeastern Washington state, is now focused on three outcomes: (1) Restoring the Columbia River corridor for multiple uses; (2) Transitioning the central plateau to support long-term waste management; and (3) Putting DOE assets to work for the future. The current environmental cleanup mission faces challenges of overlapping technical, political, regulatory, environmental, and cultural interests. From Oct. 1, 1996 through Sept. 30, 2008, Fluor Hanford was a prime contractor to the Department of Energy's Richland Operations Office. In this role, Fluor Hanford managed several major cleanup activities that included dismantling former nuclear-processing facilities, cleaning up the Site's contaminated groundwater, retrieving and processing transuranic waste for shipment and disposal off-site, maintaining the Site's infrastructure, providing security and fire protection, and operating the Volpentest HAMMER Training and Education Center. On October 1,2008, a transition occurred that changed Fluor's role at Hanford. Fluor's work at Hanford was split in two with the technical scope being assumed by the CH2M HILL Plateau Remediation Company (CHPRC) CHPRC is now spearheading much of the cleanup work associated with former nuclear-processing facilities, contaminated groundwater, and transuranic waste. Fluor is an integrated subcontractor to CH PRC in this effort. In addition, at the time of this writing, while the final outcome is being determined for the new Mission Support Contract, Fluor Hanford has had its contract extended to provide site-wide services that include security, fire protection, infrastructure, and operating the HAMMER facility. The emphasis has to be on doing work safely, delivering quality work, controlling costs, and meeting deadlines. Statistical support is provided by Fluor to the PRC, within Fluor Hanford, and to a third contractor, Washington Closure Hanford, which is tasked with cleaning up approximately 210 square miles designated as the Columbia River corridor along the outer edge of the Hanford Site. The closing months of Fluor Hanford's 12 year contract were busy, characterized by special events that capped its work as a prime cleanup contractor, transitions of work scope and personnel, and the completion numerous activities. At this time, Fluor's work and approach to safety were featured in state and national forums. A 'Blockbuster' presentation at the Washington State Governor's Industrial Safety Conference in September 2008 featured Fluor Hanford's Chief Operating Officer, a company Safety Representative, and me. Simultaneously, an award ceremony in Anaheim, Calif. recognized Fluor Hanford as the winner of the 2008 Robert W. Campbell Award. The Robert W. Campbell Award is co-sponsored by Exxon Mobil Corporation and the National Safety Council. Named after a pioneer of industrial safety, the Campbell Award recognizes organizations that demonstrate how integration of environmental, health and safety (EHS) management into business operations is a cornerstone of their corporate success. Fluor Hanford received the award for corporations with more than 1,000 employees. Campbell Award winners undergo rigorous assessments that include site visits and comprehensive evaluations of their commitment to, and implementation of, EHS practices. Award winners work with an international partnership of 21 organizations to develop case studies that illustrate their superior EHS programs and best practices, for use by top business and engineering schools worldwide. Quality methodologies in place at Fluor Hanford played a key role in the award process. Fluor Hanford's integrated use of Statistical Process Control and Pareto Charts for analyzing and displaying EHS performance were viewed favorably by the award judges.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Numerical Modeling of 90 Sr and 137 Cs Transport from a Spill in the B-Cell of the 324 Building, Hanford Site 300 Area

To characterize the extent of contamination under the 324 Building, a pit was excavated on the north side of the building in 2010 by Washington Closure Hanford LLC (WCH). Horizontal closed-end steel access pipes were installed under the foundation of the building from this pit and were used for measuring temperatures and exposure rates under the B-Cell. The deployed sensors measured elevated temperatures of up to 61 °C (142 °F) and exposure rates of up to 8,900 R/hr. WCH suspended deactivation of the facility because it recognized that building safety systems and additional characterization data might be needed for remediation of the contaminated material. The characterization work included additional field sampling, laboratory measurements, and numerical flow and transport modeling. Laboratory measurements of sediment physical, hydraulic, and geochemical properties were performed by Pacific Northwest National Laboratory (PNNL) and others. Geochemical modeling and subsurface flow and transport modeling also were performed by PNNL to evaluate the possible extent of contamination in the unsaturated sand and gravel sediments underlying the building. Historical records suggest that the concentrated 137 Cs- and 90 Sr-bearing liquid wastes that were spilled in B-Cell were likely from a glass-waste repository testing program associated with the Federal Republic of Germany (FRG). Incomplete estimates of the aqueous chemical composition (no anion data provided) of the FRG waste solutions were entered into a geochemical speciation model and were charge balanced with nitrate to estimate waste composition. Additional geochemical modeling was performed to evaluate reactions of the waste stream with the concrete foundation of the building prior to the stream entering the subsurface.

36 MATERIALS SCIENCE↗

ERDF Waste Disposal in the Central Plateau at the Hanford Site (Annual Status Report FY2012)

Washington Closure Hanford (WCH) operates the Environmental Restoration Disposal Facility (ERDF) to dispose of Hanford Site low-level radioactive, hazardous, or dangerous, and low-level mixed waste generated during waste site closures and some remediation activities from other Hanford Site contractors as authorized by the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). A CERCLA record of decision (ROD) (EPA 1995), including amendments (EPA, 1997, 1999, 2002, 2007, 2009), identifies the requirements associated with the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ERDF Waste Disposal in the Central Plateau at the Hanford Site (Annual Status Report FY2011)

Washington Closure Hanford (WCH) operates the Environmental Restoration Disposal Facility (ERDF) to dispose of Hanford Site low-level radioactive, hazardous, or dangerous, and low-level mixed waste generated during waste site closures and some remediation activities from other Hanford Site contractors as authorized by the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). A CERCLA record of decision (ROD) (EPA 1995), including amendments (EPA, 1997, 1999, 2002, 2007, 2009), identifies the requirements associated with the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Observational Approach to Chromium Site Remediation - 13266

Production reactors at the U.S. Department of Energy's (DOE) Hanford Site in Richland, Washington, required massive quantities of water for reactor cooling and material processing. To reduce corrosion and the build-up of scale in pipelines and cooling systems, sodium dichromate was added to the water feedstock. Spills and other releases at the makeup facilities, as well as leaks from miles of pipelines, have led to numerous areas with chromium-contaminated soil and groundwater, threatening fish populations in the nearby Columbia River. Pump-and-treat systems have been installed to remove chromium from the groundwater, but significant contamination remain in the soil column and poses a continuing threat to groundwater and the Columbia River. Washington Closure Hanford, DOE, and regulators are working on a team approach that implements the observational approach, a strategy for effectively dealing with the uncertainties inherent in subsurface conditions. Remediation of large, complex waste sites at a federal facility is a daunting effort. It is particularly difficult to perform the work in an environment of rapid response to changing field and contamination conditions. The observational approach, developed by geotechnical engineers to accommodate the inherent uncertainties in subsurface conditions, is a powerful and appropriate method for site remediation. It offers a structured means of quickly moving into full remediation and responding to the variations and changing conditions inherent in waste site cleanups. A number of significant factors, however, complicate the application of the observational approach for chromium site remediation. Conceptual models of contamination and site conditions are difficult to establish and get consensus on. Mid-stream revisions to the design of large excavations are time-consuming and costly. And regulatory constraints and contract performance incentives can be impediments to the flexible responses required under the observational approach. The WCH project team is working closely with stakeholders and taking a number of steps to meet these challenges in a continuing effort to remediate chromium contaminated soil in an efficient and cost-effective manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simple Waste Solutions for Complex Facilities - 12433

The buildings in the 300 Area, including several Category 3 nuclear facilities are undergoing deactivation, decommissioning, decontamination and demolition (D4) by Washington Closure Hanford (WCH) as part of the River Corridor Closure Contract (RCCC). The D4 process has generated a wide variety of low-level radioactive and low-level radioactive mixed waste as well as TRU. The Hanford Site-wide Transportation Safety Document (TSD) has been successfully utilized to transport waste streams that otherwise would not be able to be shipped. The TSD accomplished this by establishing a comprehensive set of onsite transportation and packaging performance standards and risk-based standards. The requirements and standards presented are equivalent to DOT and NRC standards (10 CFR 71). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NDA Challenges during Cleanup of the Hanford 618-10 Burial Ground Trenches - 15542

The 618-10 Burial Ground on the Hanford Reservation was an early trench waste site used for the disposal of waste from the 300 Area at Hanford. Much of this waste consisted of residues from evaluations of failed fuel as well as various process and separations studies associated with the Department of Energy (DOE) mission which were performed in the 300 Area between March 1954 and September 1963. Much of this waste contained significant concentrations of fission products as well as Transuranic (TRU) radionuclides. Waste forms consist of drums and boxes which were disposed of in the trenches. Many of the drums are shielded containers, cemented sludge, or cemented debris. There are no identifying marks on the containers to correlate them to a specific waste stream. In addition there is some waste in the trenches which came from other locations outside of the 300 area. Cleanup of the 618-10 burial ground is covered under the Washington Closure Hanford (WCH) contract. Due to the proximity of the 618-10 site to the Columbia River, waste is being removed from the 618-10 site, stabilized, and disposed of into either the Environmental Restoration Disposal Facility (ERDF) if the containers are determined to be LLW or transferred to the Hanford Central Waste Complex (CWC) if the containers are suspected to be TRU waste. In order to determine the correct disposal path Non Destructive Assay (NDA) must be performed on all of the containers excavated from the trenches. The NDA of these containers is performed using germanium gamma spectroscopy with an In Situ Object Counting System (ISOCS) and with a neutron slab counter. Due to the challenges associated with these difficult waste streams, matrices, and lack of information to associate these containers with a particular process, the NDA program has had to develop a more robust process to ensure the correct disposition of the waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford building 324 REC hot cell decommissioning approach - 15484

The 324 Building is a facility located at the Hanford Site and is undergoing decontamination and demolition (D and D) activities by Washington Closure Hanford (WCH). In October 1986, an in-cell leak of approximately 1.3 million curies occurred with a substantial fraction being lost into the subsurface soil beneath the floor of a large hot cell complex. Sampling under the hot cell floor revealed hot spots in the soil and cobble reading in excess of 10,000 R. In January of 2014, WCH contracted an AREVA lead team with Kurion as primary design agent to remove the B-Cell floor and highly contaminated underlying soils. The objective of this project is to remove the contaminated debris and soil and repackage them into the existing adjacent hot cells for final disposition as monoliths. The approach to this project uses an innovate combination of existing cell equipment, commercial equipment, and special tools to perform a series of completely remote operations. Also, a novel waste handling approach allows all the highly radioactive waste to remain within the existing cells. The remote handling approach to this project is to use customized off-the-shelf excavators which are mounted and operated remotely inside the cell. These can be moved and replaced remotely with a -Plug-and-Play- connection method. All the cables and utilities for the excavator and tools are managed through this cell connection with connections in a worker-accessible gallery space. The remote excavators are wall-mounted, which frees up the floor for the excavator work. The design also includes a transfer barrier which allows the B-Cell door to remain open during waste transfers while preventing spread of contamination between cells. The project balances the use of existing cell equipment such as cranes and shield doors, with the use of new remote equipment Existing equipment will be removed from the floor of the hot cell to adjacent cells. The concrete floor and stainless steel liner will then be remotely cut and removed, revealing the contaminated soil beneath the cell. The contaminated soil will be mixed with grout in the cell using the excavators and then placed in rigid bins. These bins will then be placed in the adjacent cells using existing overhead cranes. The waste containers allow optimal utilization of the limited adjacent hot cell space and improve the characteristics of the final waste monolith package. The system will use each bin once which significantly decreases the risk of contamination spread. The project includes a full-scale mockup facility in which all installation and operational activities will be tested and proven prior to hot cell construction activities. The mockup facility will also be used for operator training before actual hot work starts. This facility will remain available for use during operations with a full set of spares for redundancy and to support operations modeling during construction and remediation activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗