Impacts of Wind and Solar on Emissions and Wear and Tear of Fossil-Fueled Generators
Abstract not provided
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided
The Western Wind and Solar Integration Study (WWSIS) investigates the impacts of high penetrations of wind and solar power into the Western Interconnection of the United States. WWSIS2 builds on the Phase 1 study but with far greater refinement in the level of data inputs and production simulation. It considers the differences between wind and solar power on systems operations. It considersmitigation options to accommodate wind and solar when full costs of wear-and-tear and full impacts of emissions rates are taken into account. It determines wear-and-tear costs and emissions impacts. New data sets were created for WWSIS2, and WWSIS1 data sets were refined to improve realism of plant output and forecasts. Four scenarios were defined for WWSIS2 that examine the differences betweenwind and solar and penetration level. Transmission was built out to bring resources to load. Statistical analysis was conducted to investigate wind and solar impacts at timescales ranging from seasonal down to 5 minutes.
The power systems have faced progressively more demanding operational requirements over the last two decades. Several factors contribute to these challenging operating conditions, including load growth, aging infrastructure, increasing penetrations of distributed energy resources (DERs), electrification of the economy, and policy initiatives such as decarbonization. The power system and its components must provide high operational flexibility to mitigate these challenges. For example, the proliferation of intermittent DERs such as wind and solar has increased the need for conventional generation assets like hydropower plants to respond to sudden load-generation imbalances. The higher flexibility requirements for hydropower plants cause more wear and tear, potentially shortening the useful lifespan of hydropower turbines. To reduce the need for hydropower plants to follow sudden changes in the dispatch signal, we investigate their combined operation with the energy storage systems (ESSs; “ESS-based hybridization”). Our analyses focuses on improving the lifespan of hydropower plants through ESS-based hybridization. Wear and tear on hydropower turbines (particularly Francis turbines) is modeled using a loss-of-life concept that is based on damage experienced by the turbine due to various cycles of operation. Then, we show that using ESSs to offset some of the high variation increases the remaining life of the hydropower plants. To demonstrate this, a few modeling tools were developed for this work: (1) a dynamic model for various components of the turbine and its governor; (2) a control strategy that assigns a slow-varying dispatch signal to a hydropower unit versus a fastmoving signal to ESS, such that the overall power request remains the same; and (3) models for the financial analysis to quantify the economic merits of such a framework. We used the models we developed to analyze the dispatch pattern of an actual hydropower plant with a power output of 50 MW and a head height of 152 m. This work showed that ESS-based hybridization could extend the life of the hydropower plant by 5% on average. This extension in life was then used to estimate the economic benefit in terms of cost deferrals associated with hydropower plant maintenance and replacement: on average, $3.6 million. Sensitivity analysis with respect to the size of ESS and cost of turbines was performed to show the variation in benefits over the range of turbine costs and ESS sizes. Crucially, stacking damage reduction and lifetime extension with other ESS value streams such as providing ancillary services could substantially increase the financial benefits of ESS-based hybridization. The higher costs associated with ESS of appropriate size would make more financial sense when multiple value streams are stacked and co-optimized to extract the maximum benefit. This dimension will be explored in future work.
Distributed photovoltaic (PV) generation often occurs ``behind the meter": a grid operator can only observe the net load, which is the sum of the gross load and distributed PV generation. This lack of observability poses a challenge to system operation at both bulk level and distribution level. The lack of real-time or near-future disaggregated estimates of gross load and PV generation will lead to over scheduling of energy production and regulation reserves, reliability constraints violations, wear and tear of controller devices, and potentially cascading failures of a system. In this paper we propose the use of a Bayesian Structural Time Series (BSTS) model with local solar irradiance measurements to disaggregate the summed PV generation and gross load signals at a downstream measurement site. BSTSs are a highly expressive model class that blends classic time series models with the powerful Bayesian state space estimation framework. Disaggregation is done probabilistically, which automatically quantifies the uncertainties of the estimated PV generation and gross load consumption. Depending on the data availability in real-time, it can be used to disaggragate PV and gross load at customer site, or can be used at the feeder level. In this paper, we focus on solving the problem at feeder level. We compare the performance of a BSTS model as well as a handful of state-of-the-art methods on a Pecan Street AMI dataset, using the National Solar Radiation Database (NSRDB) to estimate local irradiance.
Lead levels (Pb) have been linked to both hyper- and hypo-reactivity of hypothalamic-pituitary-adrenal axis (HPA) axis to acute stress in animals and humans. Similarly, allostatic load (AL), the ‘wear and tear’ of chronic stress, is associated with inadequate HPA axis activity. We examined whether Pb levels would be associated with altered diurnal cortisol profile, as a primary mediator of AL, during aging. Pb levels were measured from blood samples (BPb) of 126 Brazilian individuals (105 women), between 50 and 82 years old. Six neuroendocrine, metabolic, and anthropometric biomarkers were analyzed and values were transformed into an AL index using clinical reference cut-offs. Salivary samples were collected at home over 2 days at awakening, 30-min after waking, afternoon, and evening periods to determine cortisol levels. A multiple linear regression model showed a positive association between BPb as the independent continuous variable and cortisol awakening response (R{sup 2}=0.128; B=0.791; p=0.005) and overall cortisol concentration (R{sup 2}=0.266; B=0.889; p<0.001) as the outcomes. Repeated measures ANOVA showed that individuals with high BPb levels showed higher cortisol at 30 min after awakening (p=0.003), and in the afternoon (p=0.002) than those with low BPb values. Regarding AL, regression model showed that BPb was positively associated with AL index (R{sup 2}=0.100; B=0.204; p=0.032). Correlation analyzes with individual biomarkers showed that BPb was positively correlated with HDL cholesterol (p=0.02) and negatively correlated with DHEA-S (p=0.049). These findings suggest that Pb exposure, even at levels below the reference blood lead level for adults recommended by the National Institute for Occupational Safety and Health and by the Center for Disease Control and Prevention, may contribute to AL and dysregulated cortisol functioning in older adults. Considering these findings were based on cross-sectional data future research is needed to confirm our exploratory results. - Highlights: • Lead exposure is associated with several negative health outcomes. • Allostatic load (AL), the wear and tear of chronic stress, may be affected by lead exposure. • Lead concentration was associated with high cortisol levels and high allostatic load. • Even at very low levels of exposure, lead was associated with chronic stress mediators.
The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unitcycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveraging the results of WWSIS Phase 1 study.
This presentation accompanies Phase 2 of the Western Wind and Solar Integration Study, a follow-on to Phase 1, which examined the operational impacts of high penetrations of variable renewable generation on the electric power system in the West and was one of the largest variable generation studies to date. High penetrations of variable generation can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 calculated these costs and emissions, and simulated grid operations for a year to investigate the detailed impact of variable generation on the fossil-fueled fleet. The presentation highlights the scope of the study and results.
The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study(WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West.
Wide use of advanced inverters could double the electricity-distribution system’s hosting capacity for distributed PV at low costs—from about 170 GW to 350 GW (see Palmintier et al. 2016). At the distribution system level, increased variable generation due to high penetrations of distributed PV (typically rooftop and smaller ground-mounted systems) could challenge the management of distribution voltage, potentially increase wear and tear on electromechanical utility equipment, and complicate the configuration of circuit-breakers and other protection systems—all of which could increase costs, limit further PV deployment, or both. However, improved analysis of distribution system hosting capacity—the amount of distributed PV that can be interconnected without changing the existing infrastructure or prematurely wearing out equipment—has overturned previous rule-of-thumb assumptions such as the idea that distributed PV penetrations higher than 15% require detailed impact studies. For example, new analysis suggests that the hosting capacity for distributed PV could rise from approximately 170 GW using traditional inverters to about 350 GW with the use of advanced inverters for voltage management, and it could be even higher using accessible and low-cost strategies such as careful siting of PV systems within a distribution feeder and additional minor changes in distribution operations. Also critical to facilitating distributed PV deployment is the improvement of interconnection processes, associated standards and codes, and compensation mechanisms so they embrace PV’s contributions to system-wide operations. Ultimately SunShot-level PV deployment will require unprecedented coordination of the historically separate distribution and transmission systems along with incorporation of energy storage and “virtual storage,” which exploits improved management of electric vehicle charging, building energy systems, and other large loads. Additional analysis and innovation are neede
Vibrations are inherently present in nuclear reactors, especially in cores and steam generators of pressurized water reactors (PWR). They can have significant effects on local heat transfer and wear and tear in the reactor and often set safety margins. The simulation of these multiphysics phenomena from first principles requires the coupling of several codes, which is one the most challenging tasks in modern computer simulation. Here an ambitious multiphysics multidisciplinary validation campaign is conducted. It relied on an integrated team of experimentalists and code developers to acquire benchmark and validation data for fluid-structure interaction codes. Data are focused on PWR fuel bundle behavior during seismic transients.
Despite their advantages, distributed energy resources (DERs) bring inherent uncertainty and variability into the landscape of modern power systems. As DER penetration grows, conventional generators like hydropower plants have to respond more often to arrest the imbalance in the net load. Hydropower turbines provide their best operational performance with minimal wear and tear when operating at regions of maximum efficiency. However, the current needs for hydropower plants require them to operate under varying load conditions and thus sub-optimal operating points leading to additional stress. To relieve the hydropower plants, this paper proposes a hybridization strategy where a hydropower unit is paired with an energy storage system (ESS) to increase operational flexibility and mitigate damage to the hydro plant. Models are developed to represent the operation of the hybrid system, quantify degradation, and assess economic benefits. Moreover, an innovative controller disaggregates the market dispatch signal into separate control setpoints for the ESS and hydropower unit. In case studies performed on a real-world hydropower facility, it was found that the ESS-based hybridization can extend the life of the hydropower plant by 5% on average. Notably, the economic benefits from reduced maintenance and deferred investment are estimated to be around $3.6 million.
Not Available
The purpose of this study was to evaluate the number of segments per beam for intensity-modulated radiation therapy (IMRT) treatments and its effects on the plan quality, treatment delivery time, machine quality assurance, and machine maintenance. We have retrospectively analyzed 24 patients treated with IMRT. Five were selected within each of the following regions: head and neck, thoracic, abdomen, and prostate. Four patients were optimized within the brain region. The clinically treated plans were re-optimized using Philips Pinnacle3 v. 8 with the direct machine parameter optimization algorithm. The number of segments per beam from the treated plan was systematically reduced by 80%, 60%, 40%, and 30%, and the following statistics have been analyzed for plan quality: target min, mean, and max doses; critical structure doses; and integral dose. We have attempted to define the smallest number of segments per beam for IMRT treatment plans. Results indicate that IMRT plans can be delivered with acceptable quality with approximately 3-6 segments per beam for the anatomical regions analyzed. A reduction in the number of segments decreases treatment delivery time, reduces machine wear and tear, and minimizes the amount of time the patient is on the treatment table, which in turn reduces the chances of intrafractional uncertainties.
Machine Learning (ML) is poised to play a pivotal role in the development and operation of next-generation fusion devices. Fusion data shows non-stationary behavior with distribution drifts, resulted by both experimental evolution and machine wear-and-tear. ML models assume stationary distribution and fail to maintain performance when encountered with such non-stationary data streams. Online learning techniques have been leveraged in other domains, however it has been largely unexplored for fusion applications. In this paper, we investigate online learning for continuous adaptation to drifting data streams in the prediction of Toroidal Field (TF) coils deflection at the DIII-D fusion facility. We further address the short-term performance degradation inherent to standard online learning, which arises because ground truth is unavailable at prediction time. To mitigate this issue, we propose an uncertainty-guided online ensemble framework. The method leverages the Deep Gaussian Process Approximation (DGPA) for calibrated uncertainty estimation and uses these uncertainty measures to guide a meta-algorithm that aggregates predictions from learners trained over different historical horizons. Our results show that online learning reduces prediction error by 80% compared to a static model. The online ensemble and the proposed uncertainty-guided ensemble further reduce error by approximately 6%, and 10% respectively, relative to standard single-model online learning, while also providing calibrated uncertainty estimates to support operational decision-making.
The identification of inorganic materials, which are able to encapsulate environmentally important small molecules or ions via host-guest interactions, is crucial for the design and development of next-generation energy sources and for storing environmental waste. Especially sought after are molecular sponges with the ability to incorporate CO 2 , gas pollutants, or nuclear waste materials such as UO 2 and PuO 2 oxides or U, Pu, Sr 2+ or Cs + ions. Porous framework structures promise very attractive prospects for applications in environmental technologies, if they are able to incorporate CH 4 for biogas energy applications, or to store H 2 , which is important for fuel cells e.g. in the automotive industry. All of these applications should benefit from the host being resistant to extreme conditions such as heat, nuclear radiation, rapid gas expansion, or wear and tear from heavy gas cycling. As inorganic tungstates are well known for their thermal stability, and their rigid open-framework networks, the potential of Na 2 O-Al 2 O 3 -WO 3 and Na 2 O-WO 3 phases for such applications was evaluated. To this end, all known experimentally-determined crystal structures with the stoichiometric formula M a M’ b W c O d (M = any element) are surveyed together with all corresponding theoretically calculated Na a Al b W c O d and Na x W y O z structures that are statistically likely to form. Network descriptors that categorize these host structures are used to reveal topological patterns in the hosts, including the nature of porous cages which are able to accommodate a certain type of guest; this leads to the classification of preferential structure types for a given environmental storage application. Crystal structures of two new tungstates NaAlW 2 O 8 (1) and NaAlW 3 O 11 (2) and one updated structure determination of Na 2 W 2 O 7 (3) are also presented from in-house X-ray diffraction studies, and their potential merits for environmental applications are assessed against those of this larger data-sourced survey. Altogether, results show that tungstate structures with three-nodal topologies are most frequently able to accommodate CH 4 or H 2 , while CO 2 appears to be captured by a wide range of nodal structure types. The computationally generated host structures appear systematically smaller than the experimentally determined structures. For the structures of 1 and 2, potential applications in nuclear waste storage seem feasible.
Tungsten doped tin oxide (WTO) and Molybdenum doped tin oxide (MoTO) thin film were deposited on corn glass by thermal evaporation method. The films were annealed at 350°C for one hour. Structural analysis using Xray diffraction data shows both the films are polycrystalline in nature with monoclinic structure of tin oxide, Sn{sub 3}O{sub 4}, corresponding to JCPDS card number 01-078-6064. SEM photograph showed that both the films have spherical grains with size in the range of 20–30 nm. Compositional analysis was carried out using EDS which reveals the presence of Sn, O and the dopant Mo/W only thereby indicating the absence of any secondary phase in the films. The films are found to contain nearly 6 wt% of Mo, 8 wt% of W as dopants respectively. The transmission pattern for both the films in the spectral range 200 – 2000 nm shows that W doping gives a transparency of nearly 80% from 380 nm onwards while Mo doping has less transparency of 39% at 380nm. Film hardness measurement using Triboscope shows a film hardness of about 9–10 GPa for both the films. It indicates that W or M doping in tin oxide provides the films the added advantage of withstanding the mechanical wear and tear due to environmental fluctuations By optimizing the optical and electrical properties, W/Mo doped tin oxide films may be explored as window layers in opto-electronic applications such as solar cells.
This paper presents the magnetic design of a high-frequency three-phase rotary transformer for Wound Rotor Synchronous Motors (WRSM). The traditional DC field excitation of the WRSM is highly challenging as it relies on the brushed connection. The brush/slipring-based connections need cooling, sealing and prone to wear and tear requiring regular maintenance. The proposed three-phase rotary transformer replaces the traditional brushed excitation by a high-power density polyphase wireless excitation. Furthermore, compared to a traditional single-phase rotary transformer, the proposed three-phase rotary transformer significantly enhances the power density, and reduces the eddy current losses and the output voltage ripples.
With increasing penetration of renewable energy resources like solar and wind, the flexibility offered by the hydropower generation facilities would be instrumental in providing grid reliability. However, hydropower’s capabilities are often constrained to meet asset management targets and environmental flow requirements. To meet these necessary requisites while simultaneously being able to utilize hydropower’s full potential, hydro plus battery hybrids offer a logical solution. However it is often challenging to make the case for economic feasibility of hydro-battery hybrids at the required scale of battery storage. To that end, this paper proposes a multi-objective optimization framework to maximize advantages of hydro-battery hybrid systems from three different avenues: new market opportunities, environmental benefits and machine wear and fatigue. Using an illustrative case study of a peaking plant, we simulate hydropower operations for with and without 120 MWh of battery storage for four different simulated flow patterns ranging from peaking operations to run-of-the-river operations and two intermediate flow patterns in between. The results demonstrate that hybridizing the hydropower plant can potentially generate additional revenue while simultaneously enable more environmental friendly operations and reduce the overall machine wear and tear.