Search NASASearch

SEARCH · Search NASA

Results for “Wec”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

HERO WEC V1.0 - WEC-Sim Model (July 2024)

**This submission supersedes submission MHKDR-483** This submission file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the standard toolboxes that are required to run WEC-Sim the user will also need the Simscape Fluids and Simscape Driveline packages. The zip file (HERO_V1_WECSim_2024.zip) contains the following: - HERO_HPTO_2024.slx: Simulink-based WEC Sim model of the first gen (V1.0) Hydraulic PTO (power take-off) that was designed for the HERO WEC. This model has been updated since submission #483 based on in-laboratory experimental results. - wecSimInputFile.m: Input file needed to run the model - userDefinedFunctionsMCR.m: MCR (multi condition run) script that is needed if a use wants to simulate multiple wave conditions. - geometry (folder): Includes the geometry file that is needed for visualization - hydroData (folder): Includes the required WAMIT data to run WEC-Sim -HydVisualization.mlx: Visualization script to plot simulation results (not needed to run)

16 TIDAL AND WAVE POWER

HERO WEC V1.0 2024 - WEC-Sim Detailed Simulation Runs and Summary Data

This dataset includes results from simulations of NREL's hydraulic and electric reverse osmosis wave energy converter (HEREO WEC). Simulation runs include 135 wave cases that were based on the updated WEC-Sim model, which is linked below. The data represented in this repository is based on an updated WEC-Sim model using laboratory data to tune and refine the original WEC-Sim model for the V1.0 HERO WEC. The 135 wave cases represent waves with the following wave height and wave period ranges: - Significant Wave Height: 0.25 - 3.75m in 0.25m increments - Wave Period: 5 - 13 sec in 1 sec increments Each run was simulated using a Pierson-Moskowitz irregular wave spectrum with a 100 second ramp time, a total simulation time of 3,100 seconds, and a simulation time-step of 0.005s. A reference table has been included to map each multi condition run (MCR) case with each wave condition. Summary data set includes a spreadsheet and image files with matrices that are associated with data from simulation runs. All matrices cover the same significant wave height and wave periods from the simulation runs, in the same increments. The following matrices are included: - Power Abs: The average absorbed power from the WEC (calculated from anchor reaction force and heave velocity) - Power Hyd: The average hydraulic power output at pump (calculated from pump output flow and pressure) - Power - Hyd ROi: The average hydraulic power measured at the RO system inlet (calculated from RO system pressure and flow (pre-accumulator)) - Flow - Pump out: The average flowrate measured at the pump outlet - Flow - Perm: The average permeate (clean water) production - Flow - RO (pre): The average flowrate measured at the inlet of the RO system before the accumulators - Flow - RO (post): The average flowrate measured after the accumulator bank in the RO system - Pressure - RO: The average pressure measured at the inlet of the RO system This data set has been developed by the National Renewable Energy Laboratory, operated by the Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER

Co-Located Wave Energy Converter (WEC) and Aquaculture System Annotated Bibliography

This annotated bibliography includes references that could aid in the design of a co-located WEC and aquaculture system off the coast of Guam. The breadth of this work covers multiple co-location archetypes such as: 1. WEC seawater desalination system a) Nearshore and deepwater WEC deployment b) Onshore and offshore aquaculture 2. WEC powering an offshore aquaculture platform a) Nearshore or deepwater WEC deployment 3. WEC powering an onshore aquaculture system a) Nearshore WEC deployment 4. Wave powered seawater pump a) Nearshore WEC deployment b) Onshore aquaculture There are two archetypes that may be of immediate interest to the community in Guam are to service the existing Fadian Hatchery (Mangilao) and to support freshwater aquaculture activities. First, the seawater pump at the hatchery that fills the facility’s seawater storage unit is broken. A nearshore seawater pumping WEC could be a solution to this issue. In addition, due to the high frequency of typhoons/extreme conditions and the island’s bathymetry, the likelihood of community support for an offshore aquaculture platform or WEC deployed in deepwater is low. Proactive and resilient solutions not just for power, but for freshwater are of interest as well to support any freshwater aquaculture activities. Therefore, a nearshore WEC desalination system is another archetype to consider.

16 TIDAL AND WAVE POWER

Review of recent WEC-Sim (v6.1) advanced features

WEC-Sim (Wave Energy Converter SIMulator) is an opensource software for modeling the motions, loads and power generation of wave energy converters. WEC-Sim performs simulations in the time domain using hydrodynamic coefficients calculated by boundary element method (BEM) frequency-domain potential flow solvers such as WAMIT, NEMOH, Capytaine, or Ansys AQWA. WEC-Sim development is ongoing, including various features, applications, and example cases used to demonstrate potential use-cases to meet the needs of the growing marine energy industry. Through input from a broad user base and an extensive team of developers and collaborators, new features of WEC-Sim are developed to expand the software’s use cases and improve overall functionality. Three new WEC-Sim features highlighted in this paper include updating WEC-Sim to be compatible with MoorDyn Version 2, incorporation of second order excitation loads (quadratic transfer functions) and allowing for dynamically changing hydrodynamics.

13 HYDRO ENERGY

Lessons Learned: Summary of Insights From the HERO WEC and Waves to Water Deployments Between 2022 and 2024

In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.

16 TIDAL AND WAVE POWER

Analysis on Evaluations of Monterey Bay Aquarium Research Institute’s Wave Energy Converter’s Field Data Using WEC-Sim and Gazebo: A Simulation Tool Comparison

Although many studies have validated wave energy converter (WEC) numerical models against scaled prototype experimental data, there remains a notable lack of validation using data from full-scale deployed WECs. This paper compares two numerical models of Monterey Bay Aquarium Research Institute’s Wave Energy Converter (MBARI-WEC), a two-body point absorber with an electro-hydraulic power take-off system (PTO). The models are implemented in WEC-Sim/Simscape and Gazebo Simulator. A statistical analysis of the models was performed, and field results were obtained to compare the models’ accuracy in predicting the RMS piston velocity, RMS motor speed, and mean electric power compared to field data for 56 observations across varying sea states. The Gazebo model demonstrated a closer agreement across all three parameters for a majority of the observations. When compared to the field data, the Gazebo and WEC-Sim models exhibited average mean electric power overestimations of 13% and 22%, respectively.

16 TIDAL AND WAVE POWER

Laboratory Upgrade Point Absorber WEC-Sim Model with MoorDyn Moorings

This dataset includes a WEC-Sim and MoorDyn model of the Laboratory Upgrade Point Absorber (LUPA). LUPA is an open-source wave energy converter designed and tested by Oregon State University. The files provided here constitute a stable LUPA configuration with three mooring lines. This model is 1/20 scale, optimized for the O.H. Hinsdale Wave Lab at Oregon State University. This model of LUPA adds MoorDyn functionality for more accurate mooring predictions and uses a more stable, updated version of LUPA's current physical configuration. This model is for WEC-Sim Version 6.0. A recent update of WEC-Sim has changed some functionality of MoorDyn such that this model will not work with WEC-Sim Version 6.1.

16 TIDAL AND WAVE POWER

HERO WEC V1: Design and Experimental Data Collection Efforts

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) is a research platform aimed at developing a modular, small-scale wave-powered desalination system for remote and disaster-response applications. Funded by the Department of Energy (DOE)'s Water Power Technologies Office (WPTO), the project aims to advance wave-powered desalination by developing and testing a small-scale, modular wave energy converter (WEC). The insights gained from this project will help guide the design and development of larger-scale wave energy devices as well as the integration of marine energy and reverse osmosis (RO) desalination. The HERO WEC was initially developed to derisk the Waves to Water prize, enabling the staff to practice WEC deployment and recovery, while optimizing installation protocols ologies, aiming to advance the broader fields of marine energy and water treatment.

13 HYDRO ENERGY

WEC as a multiport

SAND2025-00555O WEC as a multiport is a software tool that simplifies the modeling and design of ocean wave energy converters (WECs) using a multi-port network framework in the frequency domain. Users can simulate the dynamic interactions between WECs and ocean waves, optimizing energy extraction and system performance. This tool supports the analysis of complex wave energy systems, aiding in the development of efficient and effective WEC designs. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Coe, Ryan

Advancing the HERO WEC Through Integrated Modeling, Testing, and Field Deployments

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) was developed by the National Laboratory of the Rockies as a modular platform for advancing wave-powered desalination technologies. Designed to operate in either a hydraulic or electric configuration, the system enables direct comparison of mechanical-to-water and electrical-to-water conversion pathways using a single hardware architecture. Deployments in 2022 and 2024 at the Jennette's Pier test site in North Carolina demonstrated freshwater production between 60 and 300 gallons per day, including successful operation in wave heights as low as 0.25 m. A structured evaluation approach combining numerical modeling of hydrodynamic and power take-off response, controlled laboratory testing, and in-ocean field deployments has been used to characterize and refine system performance. Specifically, insights from these efforts are now informing the second-generation HERO WEC (V2) to increase robustness and overall survivability. Changes from the original prototype include improved drivetrain components, refined geometry, enhanced control systems, and design. The HERO WEC platform continues to serve as an open-access research asset supporting broader marine energy and desalination development.

16 TIDAL AND WAVE POWER

Advancing the HERO WEC Through Integrated Modeling, Testing, and Field Deployments: Preprint

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) was developed by the National Laboratory of the Rockies as a modular platform for advancing wave-powered desalination technologies. Designed to operate in either a hydraulic or electric configuration, the system enables direct comparison of mechanical-to-water and electrical-to-water conversion pathways using a single hardware architecture. Deployments at the Jennette's Pier test site in 2022 and 2024 demonstrated freshwater production between 60 and 300 gallons per day, including successful operation in wave heights as low as 0.25 m. A structured evaluation approach combining numerical modeling of hydrodynamic and PTO response, controlled laboratory testing, and in-ocean field deployments has been used to characterize and refine system performance. Insights from these efforts are now informing the second-generation HERO WEC (V2), which incorporates improved drivetrain components, refined geometry, enhanced control systems, and design updates aimed at increasing robustness and long-duration survivability. The HERO WEC platform continues to serve as an open-access research asset supporting broader marine energy and desalination development.

16 TIDAL AND WAVE POWER

Numerical Modeling and Optimization of the iProTech Pitching Inertial Pump (PIP) Wave Energy Converter (WEC) (Cooperative Research and Development Final Report, CRADA Number: CRD-22-22968)

This work generated a first-of-its-kind automated workflow to couple time-domain simulations of wave energy converters written in one software language with a set of design generation and evaluation scripts written in another software language. This automated workflow used an existing optimization package to analyze the sensitivity of different design parameters on the power output of a specific WEC, iProTech’s Pitching Inertial Pump (PIP). Geometric, inertial, and power take-off variables were all varied and optimized to find values that produced the highest amount of power generated over varying wave conditions. The findings on these parameter sensitivity studies are used to inform future design iterations of the PIP WEC. Including more design variables in the optimizations will only increase computational run time and further software development is needed to analyze a larger optimization.

16 TIDAL AND WAVE POWER

Numerical Modeling & Optimization of the iProTech Pitching Inertial Pump (PIP) Wave Energy Converter (WEC) (CRADA Final Report)

This project represents a continuation of the collaboration between iProTech and NLR to simulate, optimize and design the iProTech Pitching Inertial Pump (PIP) device. The objectives of this TEAMER project are twofold: 1. Refining the physical characteristics of the existing iProTech PIP WEC-Sim model to enhance the model’s fidelity and include controllable components. Key model enhancements target the inclusion of Coulomb friction, the introduction of a controllable bypass valve, and the replacement of traditional check valves with advanced motorized ones. 2. Exploring traditional and advanced control algorithms. From traditional methods like latching control to cutting-edge reinforcement learning (RL) algorithms, the goal is to ensure the PIP device's adaptability and optimal performance across a range of ocean conditions. NLR is tasked with augmenting the WEC-Sim model and implementing the control algorithms, culminating in performance comparison analyses. iProTech will update their existing 3D models, advise on model improvements, and determine crucial system metrics. WEC-Sim, developed in MATLAB/SIMULINK with Simscape Multibody, is the main piece of software that will be used in this project. Coupled with the MATLAB RL Toolbox, it offers a robust platform for in-depth simulation and optimization of the iProTech PIP device. Building on previous work to explore the PIP design space and optimize its geometry, mass distribution, center of gravity and other key parameters, this project aims to refine iProTech’s existing numerical models and develop effective control algorithms that can seamlessly integrate into their future hardware testing campaigns.

16 TIDAL AND WAVE POWER

Pioneer WEC v1 testing report

The “Pioneer WEC” project is tasked with developing a wave energy converter (WEC) to provide additional electrical power to the CeNtral Surface Mooring (CNSM) within the NSF-funded Ocean Observatories Initiative (OOI) Pioneer Array. This report summarizes the design, testing, and deployment of the “Pioneer WEC v1 prototype.”

Coe, Ryan Geoffrey [Sandia National Laboratories (

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC)

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) is a 6-ft wave energy device that turns seawater into drinking water. It is designed for rapid deployment in disaster response scenarios where fresh water is limited. Featuring both hydraulic and electric power takeoff systems, HERO WEC has undergone two ocean deployments at Jennette's Pier on the Outer Banks of North Carolina in addition to extensive in-lab testing. The research provides practical insights into the real-world challenges of wave energy conversion beyond modeling and dry-lab environments. Attendees will develop an understanding of the practical considerations for deploying wave energy devices and the lessons learned from real-world HERO WEC deployments.

16 TIDAL AND WAVE POWER

Biconjugate Impedance Matching Control of the HERO WEC: Preprint

Effective control strategies are essential for maximizing the power output of wave energy converters (WECs). In this study, we explore the methodology of port-based modelling which can be used for bi-conjugate impedance matching, a type of reactive control that involves maximizing power transfer by setting the load (PTO) impedance to be the complex conjugate of the source impedance (WEC). Despite its foundational role in electrical engineering, this method has seen limited application in wave energy and has not yet been demonstrated in wave-powered desalination systems. We represent our complex multidisciplinary system as an equivalent circuit to explore frequency-based relations. The HERO WEC, a small-scale, modular point absorber (PA) designed for reverse osmosis desalination is used as a case study to demonstrate port-based modelling for control applications. Improving the performance of wave-powered water desalination systems could play a critical role in addressing freshwater scarcity for coastal communities, especially those in remote or disaster-prone regions.

16 TIDAL AND WAVE POWER

Towards an intuitive application of WEC control co-design

A simple co-design example in a reduced parameter space is presented for an oscillating flap device. Initially, the WEC geometry and mass properties are considered along with drivetrain gear ratio, inertia, motor constant and stiffness under both PI and optimal control. This parameter space is reduced to those to which performance is most sensitive for a fixed geometry. The gear ratio, drivetrain stiffness, and flap mass are found to be the most impactful design criteria as they can create orders of magnitude variations in power performance. The performance of the optimized system is compared with several sub-optimal variants in terms of electrical and mechanical power capture, transmission coefficients, and transducer power gain. Notably, though substantial power capture improvements are demonstrated when an optimal controller is employed, this power capture remains sensitive to appropriate selections of drivetrain and flap design parameters, implying that control co-design procedures remain necessary for high-performing WECs. Furthermore, a number of practical caveats and extensions to the presented co-design methodology are suggested, including the characterization of system static friction, especially in the presence of high gear ratios.

Control co-design

WEC-SIM Support for an Innovative Zero Discharge Supercritical Water Based Wave Energy Desalination System (CRADA Final Report)

NREL will assist East Carolina University in its development of the foundational knowledge and proof of concept that are needed for future process scale up and commercialization of a sustainable wave-to-water (direct pressurization) desalination unit powered by a wave energy converter. NREL will provide guidance and support to East Carolina University on its: use of the NREL developed WEC-Sim based wave to water system, exploring the WEC-Sim/ASPEN Plus data exchange communication, and using experimental data to hopefully provide validation of analytical models.

16 TIDAL AND WAVE POWER