Monitoring Well Installation Completion Report for Ransom Road Landfill, Vertical Processing Facility, and Environmental Health Facility, Solid Waste Management Units: 003, 077, and 079

The intended purpose of the Monitoring Well Installation project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by installing new monitoring wells. The wells are installed in accordance with the Brevard County Health Department and St. Johns River Water Management Districts rules and guidelines.

Well Installation↗

Globally Gridded Groundwater Extraction Volumes and Costs under Six Depletion and Ponded Depth Targets

This repository contains simulated outputs from superwell – a hydro-economic tool for long-term assessment of groundwater cost and supply – providing globally gridded groundwater extractable volumes and associated unit costs ($/km³) for accessible groundwater production, based on a variety of user-defined depletion and ponded depth scenarios. Key model documentation: Niazi, H., Ferencz, S. B., Graham, N. T., Yoon, J., Wild, T. B., Hejazi, M., Watson, D. J., & Vernon, C. R. (2025). Long-term hydro-economic analysis tool for evaluating global groundwater cost and supply: Superwell v1.1. Geoscientific Model Development, 18(5), 1737-1767. https://doi.org/10.5194/gmd-18-1737-2025 Find the source code of the superwell model on GitHub: https://github.com/JGCRI/superwell Repository Overview Main output: superwell_outputs.7z contains 6 files (4.5 GB) named as superwell_py_deep_all_0.*PD_0.*DL.csv. These files present superwell outputs of global groundwater extraction volumes and cost estimates on a 0.5° scale for six scenarios with different Ponded Depth (PD; 0.3 and 0.6 m) and Depletion Limit (DL; 5%, 25%, and 40% of available volume) targets over the entire pumping lifetime of a grid cell superwell_py_deep_all_0.3PD_0.25DL_sample_100.csv contains superwell outputs for 100 data points sampled to match the global inputs' distribution superwell_py_deep_all_0.3PD_0.25DL_Grid_72548.csv contains superwell output for a single grid cell concept_v5.png provides an overview of the superwell workflow Outputs Description year_number: year of pumping depletion_limit: set depletion limit (DL) as a volume fraction of total available groundwater Mappings: continent, country, gcam_basin_id, Basin_long_name, grid_id: geographic identifiers and basin information Inputs: grid_area (km²): area of the grid cell whyclass: hydrogeological classification of the aquifer permeability (m/day), porosity (%), total_thickness (m), depth_to_water (m): aquifer properties. The geo-processed input data has been published separately: https://doi.org/10.57931/2307831 Model outputs: orig_aqfr_sat_thickness (m), aqfr_sat_thickness (m): original and remaining/instantaneous saturated thickness of the aquifer hydraulic_conductivity (m/day), transmissivity (m²/day): hydraulic properties of the aquifer radius_of_influence (m), areal_extent (km²): well radius and area of influence from the center of the well number_of_wells (-): number of wells in a grid cell determined by a ratio of well area and grid area max_drawdown (m), drawdown (m), drawdown_interference (m): well and aquifer drawdown during extraction total_head (m): total lift for the groundwater (depth to water plus drawdown) total_well_length (m): total depth of wells drilled well_yield (m³/day): pumping rate or well yield power (kW), energy (kWh): power and energy required for pumping groundwater Volume Outputs: volume_produced_perwell (m³), cumulative_vol_produced_perwell (m³): production volume metrics per well volume_produced_allwells (m³), cumulative_vol_produced_allwells (m³): aggregate extraction volumes for all wells in a grid cell available_volume (m³): available groundwater in storage for the grid cell as determined by aquifer properties depleted_vol_fraction: fraction of total volume pumped over available volumes in a grid cell (same as depletion limit) Cost Outputs: well_installation_cost ($): well installation cost based on the hydrogeological complexity of the aquifer annual_capital_cost, maintenance_cost, nonenergy_cost ($): nonenergy costs energy_cost_rate ($/kWh): electricity rate energy_cost ($): energy cost of pumping groundwater total_cost_perwell ($), total_cost_allwells ($): total annual energy and non-energy cost for each and all wells in a grid cell a unit_cost ($/m³), unit_cost_per_km3 ($/km³), unit_cost_per_acreft ($/acre-ft): total cost of pumping a unit of groundwater, indicated for different spatial units Key Resources Model documentation: Niazi, H., Ferencz, S., Graham, N., Yoon, J., Wild, T., Hejazi, M., Watson, D., & Vernon, C. (2024; In-prep). Long-term Hydro-economic Assessment Tool for Evaluating Global Groundwater Cost and Supply: Superwell v1. Geoscientific Model Development. Input data: Niazi, H., Watson, D., Hejazi, M., Yonkofski, C., Ferencz, S., Vernon, C., Graham, N., Wild, T., & Yoon, J. (2024). Global Geo-processed Data of Aquifer Properties by 0.5° Grid, Country and Water Basins. MSD-LIVE Data repository. https://doi.org/10.57931/2307831 superwell source code: https://github.com/JGCRI/superwell Cite as Niazi, H., Ferencz, S., Yoon, J., Graham, N., Wild, T., Hejazi, M., Watson, D., & Vernon, C. (2024). Globally Gridded Groundwater Extraction Volumes and Costs under Six Depletion and Ponded Depth Targets. MSD-LIVE Data repository. https://doi.org/10.57931/2307832 Contact Reach out to Hassan Niazi or Stephen Ferencz or open an issue in the superwell repository for questions or suggestions.

Earth Systems↗

General Services Administration Reclamation Yard (SWMU 010) 2020-2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred from October 2020 through June 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include four field events: (1) October 2020 – Chlorinated VOC Plume groundwater sampling via Direct Push Technology (DPT) – 68 groundwater samples were collected from 14 locations at varying intervals; (2) December 2020 – Site-wide semi-annual water level measurements of 52 monitoring wells and sampling of 39 monitoring wells; (3) May 2021 – Chlorinated VOC Plume monitoring well installation – two monitoring wells were installed and screened from 10 to 20 feet below land surface (bls); and (4) May/June 2021 – Site-wide semi-annual water level measurements of 53 monitoring wells and sampling of 40 monitoring wells. Results showed substantial reduction of both plumes. Conclusions and recommendations are presented.

VOC↗

COMPASS-FME Synoptic Site Tree Greenhouse Gas Concentrations

These data are tree stem greenhouse gas concentrations collected from tree gas wells at some of the COMPASS-FME (Coastal Observations, Mechanisms, and Predictions Across Systems and Scales; see https://compass.pnnl.gov/) 'synoptic' sites in the Chesapeake Bay region: Moneystump (MSM), Goodwin Islands (GWI), and GCReW (GCW). The sap flow monitoring trees at these sites in the Upland (UP) and Transition (TR) zones were cored and had gas wells installed at breast height. There were also some dead standing trees cored, gas well installed, and sampled at MSM and GWI. The GCW UP samples overlap with the TEMPEST experiment control plot, so the GCW UP data was pulled from the TEMPEST page and included here. These data provide crucial information about possible pathways for the greenhouse gas (carbon dioxide and methane, CO2 and CH4 respectively) production and emission (or in the case of CH4, perhaps taken up from) the atmosphere.All data are plain text CSV (comma separated value) files and require no special software to read.Updated 2025-10-09 to fix two missing dates (lines 77 and 78 in the data file).

54 ENVIRONMENTAL SCIENCES↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Monitoring of ground water table depth and soil moisture at the Point Reyes field site

Ground water table (GWT) depth and soil moisture (SM) have been monitored at several locations at the Point Reyes field site (Californian coastal grassland) from 2021 to 2024. Monitoring is still on-going and data may be added to this archive at later time. The SM data have been acquired using Teros 12 Meter soil moisture sensors placed at 10, 30, 60 and 90 cm depth at 5 locations along a small hillslope. These sensors also collect soil temperature and bulk conductance. In addition, some collocated sensors provide pore pressure and Photochemical Reflectance Index (PRI). The GWT depth has been inferred from various type of Onset pressure transducers. The pressure measurements have been corrected for atmospheric pressure variations and sensor position relative to the ground surface to infer GWT depth, as well as with RTK GPS data to infer GWT elevation. The GWT data have been acquired at 5 distinct locations from 2020 to 2024 with the sensors placed at about 4 m depth. In addition, GWT data has been acquired for the 2023-2024 period with sensors located in 1 m deep shallow wells installed near each deeper well. This data is intended to evaluate possibly different dynamic in shallow (perched) and deep aquifer. The datasets are all provided in csv format. Please note that the interpretation of the GWT data needs to be done with consideration of environmental and well characteristics at the site and uncertainty in various variables. For more information on GWT and SM data, please contact the author.

54 ENVIRONMENTAL SCIENCES↗

Artesian Well Abandonment at Launch Complex 39A

The artesian well tasked for abandonment was located on the LOX side (northwest area) of the launch complex. The exact date of well installation is unknown. The well was no longer in use at the time of the abandonment request, but was previously utilized under St. Johns River Water Management District (SJRWMD) consumptive use permit (No. 50054) for the Floridian Aquifer. The exact construction details of the LOX artesian well were also unknown; however, a similar-type artesian well was previously located on the LH2 side of the site, which was abandoned in 2012. Based on discussions with the NASA RPM and review of the LH2 artesian well abandonment completion report, the LH2 artesian well was reported to be an 8-inch diameter, 330-foot deep well. The NASA RPM communicated that the LOX artesian well was likely to be an 8-inch diameter, 380-foot deep well. This information was used for scoping, and was subsequently confirmed to be substantially accurate. No additional information could be found for the LOX artesian well using the NASA Remediation Information System (RIS).

Morgan, Lindsay↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Full-Scale Implementation of Propane Biosparge System for In-Situ Remediation of 1,4-Dioxane - 20174

1,4-Dioxane is a common co-contaminant with chlorinated solvents but is not readily remediated via similar treatment approaches (e.g., sorption, reductive dechlorination). However, 1,4-dioxane can be cometabolically biodegraded in the presence of alkane gases and oxygen. At Vandenberg Air Force Base in California, USA, historical use of chlorinated solvents resulted in 1,4-dioxane in groundwater across three vertical groundwater zones. Between April 2013 and December 2016, laboratory testing and various field demonstrations were conducted by us, and others. The results from these tests showed in-situ propane biosparging as a promising technology for reduction of both chlorinated solvent and 1,4-dioxane concentrations, with up to 99 percent reduction in groundwater concentrations. Stable isotope probing (SIP) was also used in 2015 to verify that biodegradation was a (destructive) mechanism occurring in the subsurface.). The success of the propane biosparge demonstrations, and confirmation of the biodegradation mechanism via SIP, has led to the full-scale implementation of a propane biosparge treatment system at Site 24 at Vandenberg Air Force Base. The treatment area is a relatively small footprint (e.g., less than 61 meters (200 feet) long), with 83 new wells installed simultaneously across the three groundwater zones. Ultimately 93 wells will be connected to an above-ground treatment system the includes an air compressor, a propane tank, controls to ensure safe operating conditions, and nutrient amendment elements. This full-scale system is currently known to be among the first of its kind. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNL 5-2428: Fracture Permeability and Seismic Slip Behavior

Our goal is to develop, apply and validate a holistic thermal, hydrologic, mechanical, and chemical (THMC) workflow that also includes evaluation of induced seismic slip in EGS reservoirs. We will integrate experimental and modelling approaches to reduce parameteruncertainty and better predict and mitigate seismic hazard at Utah FORGE and future EGS sites.We propose a novel approach that incorporates 3D physics-based Earthquake simulations in THMC models, herein referred to as “THMC+E” models. This capability will enable improvedengineering decisions at Utah FORGE and move EGS operations toward repeatable, robust, economically viable, and socially accepted development. Utah FORGE management and future EGS operators may employ results of THMC+E models for decision making purposes throughout the lifetime of the field operation. For example, before production well installation, our THMC+E models will predict circulation scenarios and related seismic hazard for a suite ofpossible well locations and flow rates, thus enabling evaluation of optimal production well placement. Such efforts will be conducted throughout the lifetime of the project, whereby additional laboratory experiments will constrain key model parameters and machine learning (ML) will reduce the size of the parameter space and the associated uncertainty. THMC+E simulations will enable exploration various circumstances that may hinder EGS success and develop mitigation strategies.

58 GEOSCIENCES↗

Former Central Heat Plant SWMU 045 Year 2 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) Performance Monitoring (PM) Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities, PM results, and monitoring well installations supporting the AS Interim Measure (IM) at the Former Central Heat Plant (CHP) at Kennedy Space Center (KSC), Florida. CHP has been designated Solid Waste Management Unit 045 under the KSC Resource Conservation and Recovery Act Corrective Action Program. An AS IM was installed at CHP between 2019 and 2021, which included the installation of an AS system to treat a chlorinated solvent groundwater plume. Contaminants of concern (COCs) identified at CHP for the AS IM include tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC). The completed AS system includes a network of 267 AS wells, which treat approximately 1.3 acres of contaminated groundwater. “Hot” compressor technology is used to treat the source zone, while a “cold” compressor is used to treat two hot spot (HS) areas (HS1 and HS2) and the high concentration plume (HCP). The AS system began operation in June-July 2021 and this document includes Year 2 of operation. The overall runtimes for the AS system for the Year 2 reporting period (October 2022 to September 2023) were approximately 69 percent for the cold trailer and 71 percent for the hot trailer. Air samples and vapor screening results collected during the reporting period showed concentrations less than applicable human health and air emissions permit criteria. Groundwater performance monitoring results show that AS treatment continues to be effective in reducing COC concentrations at CHP. At the shallow interval, COC concentrations were all non-detect, less than, or met their respective State of Florida Groundwater Cleanup Target Levels (GCTLs) at the end of Year 2 in September 2023. In the deep interval, 10 of the 15 PM wells detected COCs greater than their respective GCTLs, with two of these wells also exceeding the Natural Attenuation Default Concentration for VC. Based on Year 2 OM&M and PM results, continued operation of the AS system is required to meet the IM objective. It is therefore recommended to continue with AS IM operations at CHP with the following plan for Year 3.

Kevin Alex Murphy↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

Coupling geophysical, geological, geochemical and mineralogical assessments to examine preferential contaminant transport pathways in interbedded fractured bedrock

This study shows that a multi-faceted approach, combining borehole geophysical logging and surface seismic P-wave first-arrival tomography with confirmatory coring, well installation, and chemical and mineralogical analysis, is effective for identifying difficult-to-locate preferential contaminant transport pathways in deeper fractured bedrock. Seismic tomography detected porous 10–20 m wide elongated fractured conduits that allow acidic groundwater contaminated with uranium (U) and nitrate (NO 3 - ) to migrate within interbedded shale-limestone bedrock over 1000 m from a former disposal facility (S-3 Ponds site) located at the DOE Y-12 National Security Complex in Tennessee (USA). Conventional drilling techniques would easily miss these conduits because they are oriented parallel with fractured bedding planes. Synchrotron analysis of aquifer solids revealed that > 95 % of the U is hexavalent (U VI ). This uranyl (UO 2 2+ ) species is coordinated with carbonate, iron oxide, silicate and phosphate minerals within cemented white to yellow precipitates, which contain U concentrations as high as ∼21.6 % by weight fraction. Identifying the presence of these mineral phases, enables a further understanding of the potential effectiveness of remediation actions. The combination of methodologies presented here can also be applied to other explorations, such as the detection of water supply.

Fate and transport↗

QuantImPy: Minkowski functionals and functions with Python

The Minkowski functionals and functions are a family of morphological measures and can be used to describe both the morphology (shape) and topology (connectedness) of a system. This paper presents the QuantImPy Python package which can compute both the Minkowski functionals and functions. In addition, this package can efficiently perform basic morphological operations and compute their distance maps. QuantImPy is easy to install, well documented, integrated with existing Python packages, and open source.

97 MATHEMATICS AND COMPUTING↗

Construction of precision sMDT detector for the ATLAS Muon Spectrometer upgrade

Here, this paper describes the small-diameter monitored drift-tube detector construction at the University of Michigan as a contribution to the ATLAS Muon Spectrometer upgrade for the high-luminosity Large Hadron Collider at CERN. Measurements of the first 30 chambers built at Michigan show that the drift tube wire position accuracy meets the specification of 20 μm. The positions of the platforms for alignment and magnetic field sensors are all installed well within the required precision. The cosmic ray test measurements show single wire tracking resolution of 100 ± 7 μm with an average detection efficiency above 99%. The infrastructure, tooling, techniques, and procedures for chamber production are described in detail. The results from the chamber quality control tests of the first 30 constructed chambers are reported.

47 OTHER INSTRUMENTATION↗

Projected WIMP sensitivity of the LUX-ZEPLIN dark matter experiment

LUX-ZEPLIN (LZ) is a next generation dark matter direct detection experiment that will operate 4850 feet underground at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, USA. Using a two-phase xenon detector with an active mass of 7 tonnes, LZ will search primarily for low-energy interactions with Weakly Interacting Massive Particles (WIMPs), which are hypothesized to make up the dark matter in our galactic halo. In this paper, the projected WIMP sensitivity of LZ is presented based on the latest background estimates and simulations of the detector. For a 1000 live day run using a 5.6 tonne fiducial mass, LZ is projected to exclude at 90% confidence level spin-independent WIMP-nucleon cross sections above $1.6 \times 10^{-48}$ cm$^{2}$ for a 40 $\mathrm{GeV}/c^{2}$ mass WIMP. Additionally, a $5\sigma$ discovery potential is projected reaching cross sections below the existing and projected exclusion limits of similar experiments that are currently operating. For spin-dependent WIMP-neutron(-proton) scattering, a sensitivity of $2.7 \times 10^{-43}$ cm$^{2}$ ($8.1 \times 10^{-42}$ cm$^{2}$) for a 40 $\mathrm{GeV}/c^{2}$ mass WIMP is expected. With underground installation well underway, LZ is on track for commissioning at SURF in 2020.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

From tides to seasons: How cyclic tidal drivers and plant physiology interact to affect carbon cycling at the terrestrial-estuarine boundary (Final technical report)

Coastal ecosystems are among the most biologically and biogeochemically active and diverse systems on Earth. Because they act as important linkages between terrestrial ecosystems and the open ocean, their incorporation in Earth system models (ESMs) is critical to predict coastal and global responses to environmental changes. However, they vary greatly in the magnitude of tides and the volume and timing of freshwater input from land, making it challenging to model the major biogeochemical reactions that control productivity and greenhouse gas emissions across coastal terrestrial aquatic interfaces (TAIs). Our overall objective was to improve mechanistic process understanding and modeling of tidal wetland hydro-biogeochemistry in coastal TAIs. We established a new flux tower site (Ameriflux US-PLo) in the oligohaline part of the Parker River to continuously monitor ecosystem-scale carbon fluxes under temporally varying salinity conditions. The site is co-located with long-term monitoring plots of the Plum Island Ecosystems LTER project. We installed wells and redox sensors in the marsh interior and creek bank, established biomass monitoring plots and deployed novel optode sensors in both locations. We used this data to parameterize plant-mediated transport in PFLOTRAN and tested the impact of soil heterogeneity on porewater constituents and gas fluxes. We collected observations of root oxygen release with a novel planar optode system in the field. Flux data collected during the measurement period encompasses a large variation in salinity ranging from drought to record precipitation years. We developed a method to extract functional relationships from the flux data using artificial neural networks, identifying salinity thresholds for CH 4 fluxes. Finally, we are using the coupled ELM-PFLOTRAN model to test the impact of antecedent hydrological conditions on the salinity-CH 4 flux relationship. This grant contributed to the professional development of one postdoc, three research assistants and one graduate student. The sensor data has been shared with external collaborators.

54 ENVIRONMENTAL SCIENCES↗