At least 19 records

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the locational energy value.

Mongird, Kendall↗

Impact of hydropower availability on resource adequacy of the United States western interconnection

Hydropower is a key energy source in the western interconnection of the United States, comprising about 25% of the annual installed nameplate capacity in 2020. However, its generation is increasingly impacted by changing hydrological conditions, operational constraints, environmental factors, water availability, and aging dam infrastructure. Assessing hydropower availability and resource adequacy is valuable for shaping energy policies and infrastructure requirements. In this study we evaluate the sensitivity of resource adequacy in the Western Interconnection to the unavailability of hydropower plants, under a wide-ranging set of 16,384 hydropower loss scenarios derived from a combination of 14 major hydrologic regions. Although a complete loss of hydropower capacity in any region is unlikely, studying such scenarios helps in identifying hydrologic regions most critical for maintaining resource adequacy. So, we identify key hydrologic regions with disproportionately large adequacy impacts relative to their installed hydropower capacity and study compounding effects between regions using classification and regression trees. Even after controlling for total installed capacity, we find that hydropower resources in the Pacific Northwest contribute the most to interconnection-wide adequacy outcomes, with resources in Northern California and the Desert Southwest providing more moderate incremental contributions.

13 HYDRO ENERGY↗

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection Description This dataset contains input and output data for the manuscript Mongird, K. et al. (under review) titled "Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection". Input data corresponds to gridded spatial siting attributes that are necessary to conduct a random forest machine learning analysis of siting feature importance. Output data includes SHAP feature analysis outputs, and classification report values. For data on power plant siting results referred to in the manuscript, please refer to the CERF: IM3 Projected Western US Power Plant Locations data download page. The downloadable data includes values for eight different future scenarios for the Western US. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Technical Information The dataset includes two sets of data files: (1) CERF gridded siting parameters and (2) Feature analysis outputs and classification reports. All downloadable data is in csv file format. Files with x/y coordinate information use the Albers Equal Area Conic projection (ESRI:102003). 1. CERF Gridded Siting Parameters This directory provides a balanced sample of gridded CERF siting parameters data for eight different scenarios for the Western US through 2055, seven different technologies, and eight timesteps. This data serves as input to the feature analysis. It contains the following parameters. region_name - name of region (i.e., state) sited - binary value representing whether the grid cell received a siting of that technology type (1=True) rcp - binary value representing scenario resource concentration pathway (0 = RCP4.5, 1 = RCP8.5) ssp - binary value representing scenario shared socioeconomic pathway (0 = SSP3, 1 = SSP5) climate - binary value representing cooler (0) or hotter (1) GCM forcing tech_name - generation technology name sited_year - year that values correspond to transmission_cost - cost of transmission interconnection pipeline_cost - cost of natural gas pipeline interconnection interconnection_cost - total interconnection cost (sum of transmission cost and gas pipeline cost) lmp - associated locational marginal value ($/MWh) associated with the grid cell, timestep, scenario, and technology xcoord - x-coordinate of location ycoord - y-coordinate of location 2a. Feature Analysis Output The dataset includes the feature analysis shap output for locational marginal price and interconnection cost. It contains the following parameters. technology - generator technology name scenario - name of scenario feature - name of feature, either locational_marginal_price or interconnection_cost value - the mean of absolute value of SHAP values for given feature 2b. Feature Analysis Classification Report This download includes the classification report associated with each random forest model. The dataset contains the following parameters. technology - generation technology name scenario - name of scenario test - one of precision (the proportion of predicted positives that are actually correct), recall (the proportion of actual positives that were correctly identified), f1-score (the harmonic mean of precision and recall) 0.0 - value of test for classification of 0 (grid cell not chosen for siting) 1.0 - value of test for classification of 1 (grid cell chosen for siting) accuracy - accuracy of model (i.e., fraction of all predictions that were right) macro avg - Simple average of test values for all classes weighted avg - Weighted average of test values for all classes, weighted based on Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor↗

IM3 Data Center Driven Grid Stress Dataset for the U.S. Western Interconnection

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from an open-source grid operations modeling framework - GO), for the Integrated Multisector, Multiscale Modeling (IM3) project, under varying levels of data center demand growth between 2025 and 2035 in the U.S. Western Interconnection. The scenarios and sensitivity experiments are combinations of different data center demand growth rates and energy, weather, population and economic pathways. Data center demand growth projections were sourced from the Electric Power Research Institute (EPRI). The data center demand growth projection names are: Low (3.71% annual data center demand growth) Moderate (5% annual data center demand growth) High (10% annual data center demand growth) Higher (15% annual data center demand growth) Energy, weather, population and economic pathways are informed by two Shared Socioeconomic Pathways (SSP3 and SSP5) and two Representative Concentration Pathways (RCP4.5 and RCP8.5) following the hotter general circulation model (GCM) forcing group from a set of perturbed thermodynamics simulations. The resulting pathway names are: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The main scenarios and sensitivity experiments are detailed below. Reference scenario: The projected grid stress and reliability results for the U.S. Western Interconnection from a previous study. This scenario does not consider data center demand growth explicitly. Data center scenario: Building on the reference scenario, this scenario considers various data center growth rates and how they impact the U.S. Western Interconnection. Data center loads are modeled as flat 8760-hr profiles. This scenario does not consider new generation and transmission capacities specifically designed to meet the new data center demands. The related folder is named "flat". Delayed generator retirements sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different levels of natural gas and nuclear generator retirement delays. The resulting scenario names are: (1) postponing 100% nuclear retirements; (2) postponing 100% nuclear and 25% natural gas retirements; (3) postponing only 50% natural gas retirements; (4) postponing 100% nuclear and 50% natural gas retirements; (5) postponing 100% nuclear and 75% natural gas retirements; and (6) postponing 100% nuclear and 100% natural gas retirements. The related folder names are: no_gen_retire_0_gas, no_gen_retire_25_gas, no_gen_retire_50_gas, no_gen_retire_50_gas_only, no_gen_retire_75_gas, and no_gen_retire_100_gas. Demand response through curtailment sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different participation and compensation levels of data center demand response. The resulting scenario names are: (1) 5% demand available for curtailment with 750 $/MWh compensation; (2) 5% demand available for curtailment with 500 $/MWh compensation; (3) 5% demand available for curtailment with 250 $/MWh compensation; (4) 15% demand available for curtailment with 750 $/MWh compensation; (5) 15% demand available for curtailment with 500 $/MWh compensation; and (6) 15% demand available for curtailment with 250 $/MWh compensation. The related folder names are: dr_cost_250_drup_0_drdown_5, dr_cost_250_drup_0_drdown_15, dr_cost_500_drup_0_drdown_5, dr_cost_500_drup_0_drdown_15, dr_cost_750_drup_0_drdown_5, and dr_cost_750_drup_0_drdown_15. Combination of delayed generator retirements and demand response through curtailment sensitivity experiment: The impact of combining postponing 100% nuclear and 25% natural gas retirements with 5% demand available for curtailment with 750 $/MWh compensation is simulated. The related folder is named "dr_cost_750_drup_0_drdown_5_nuc_100_gas_25". Please refer to the README file for a detailed description of the dataset including individual files and references.

Artificial Intelligence↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Comparative Analysis of Inter-Area Oscillations in the US Eastern and Western Interconnections

This paper presents a comparative analysis of interarea oscillations in the US Eastern and Western Interconnections using frequency disturbance data collected from the advanced wide-area Frequency Monitoring Network (FNET/GridEye), enabling us to investigate and compare the oscillation characteristics of both regions. The study analyzes the statistical data from the two interconnections, including total oscillation events, average dominant frequencies, damping ratios, and maximum amplitudes. We also explore the impact of seasonal and daily variations on oscillation occurrences and the influence of different grid topologies and operational practices. The results provide insights into both interconnections' stability and control characteristics, offering valuable information for power system operators to enhance grid stability and oscillation suppression measures.

Fu, Hao [University of Tennessee, Knoxville (UTK)]↗

Western Interconnect Transmission Line Wildfire Risk

The datasets contain wildfire risk probabilities for transmission lines in the Western Interconnect, identified only by the HIFLD dataset identifier. The dataset is generated using PNNL's WREST Tool (https://www.pnnl.gov/projects/wildfire-risk-resilience/tools/wrest). The input dataset includes HIFLD datasets on transmission lines and wildfire burn potentials and flame lengths from the PNNL RADR-FIRE Tool for 2025.

psps↗

How a Large-Scale Deployment of Grid-Forming Inverters May Impact Inter-Area Oscillation Modes: An Investigation in the US Western Interconnection

This report describes work performed to evaluate the impact of high grid-forming (GFM) inverter penetration on the inter-area oscillation mode characteristics of the Western Interconnection. Using simulations, this work analyzes how: a) replacing fossil-fuel-based synchronous generators by GFM inverters will impact properties of the North-South mode, and b) replacing the Colstrip power plant by grid-following (GFL) and GFM inverters will change the characteristics of the Montana mode. Results obtained indicate that high penetration of GFM inverters will significantly alter inter-area oscillation characteristics in interconnections. Low frequency oscillations in the 0.11 Hz range will be predominantly driven by remaining synchronous machines, and hence their relative distribution in the interconnection will impact mode characteristics and observability.

20 FOSSIL-FUELED POWER PLANTS↗

The Effect of Power Electronic Loads on Western Interconnection Stability

The prevalence of power electronics in the bulk power system is increasing rapidly in both the generation and consumption of electricity. This work focuses on the effect of changing load composition - specifically the transition from single phase air conditioner motors to power electronics backed air conditioners - on power system stability. Various transmission and generation contingency events for the Western Interconnection were simulated using Positive Sequence Load Flow software and planning models from the Western Electricity Coordinating Council. In general, an increased proportion of power electronic load leads to more instability. For some specific faults resulting in fault-induced delayed voltage recovery, transitioning to higher proportions of power electronic loads helps expedite system recovery. These results demonstrate that load composition should be examined in conjunction with generation composition when evaluating system stability.

FIDVR↗

Evaluating the Impact of Retiring Synchronous Fossil Fuel Generators on Inter-Area Oscillations in the U.S. Western Interconnection

To facilitate the decarbonization of the power grid, fossil-fuel-based synchronous generators are gradually being retired and replaced by inverter-interfaced renewable energy resources. As synchronous machines get displaced, the characteristics of inter-area oscillation modes in electrical interconnections will change. This paper describes a model-based study of the impact of the retirement of synchronous fossil-fuel generators on the oscillatory characteristics of the US Western Interconnection (WI). Results show that if fossil-fuel-based synchronous machines are replaced by grid-forming inverters, then dominant inter-area modes seen in the WI today will change. New inter-area modes may appear due to the electromechanical energy exchange among remaining hydropower generators clustered in geographical proximity in the northwestern part of the WI. This observation indicates that the evolution in modal properties needs to be closely tracked as the resource mix in electrical interconnections changes.

grid forming inverter, wide area oscillation, Inte↗

Impact of Quaternary Pumped Storage Hydropower on Frequency Response of U.S. Western Interconnection with High Renewable Penetrations

As renewable penetration increases in the United States, maintaining stability and reliability of low-inertia power grid by providing sufficient frequency control capability becomes a challenge. Advanced pumped storage hydro technologies (APSH) will be expected to play an important role for future grid as not only an energy supplier, but also as an ancillary services provider. This paper studies the impact of using quaternary pumped storage hydropower (Q-PSH), as one of the newly proposed APSH technology, to provide primary frequency response. To quantify the impact of Q-PSH on frequency response of the U.S. Western Interconnection, a user-defined dynamic model of Q-PSH is developed on the GE Positive Sequence Load Flow (PSLF) platform and is implemented in a set of detailed U.S. Western Electricity Coordination Council (WECC) planning cases in which renewable penetration levels are 20%, 40%, 60% and 80%. Simulation results show that Q-PSH can help improve frequency nadir and settling frequency comparing to the conventional PSH.

frequency response↗

Impact of Quaternary-Pumped Storage Hydropower on Frequency Response of U.S. Western Interconnection with High Renewable Penetrations: Preprint

As renewable penetration increases in the United States, maintaining stability and reliability of low-inertia power grid by providing sufficient frequency control capability becomes a challenge. Advanced pumped storage hydro technologies (APSH) will be expected to play an important role for future grid as not only an energy supplier, but also as an ancillary services provider. This paper studies the impact of using quaternary pumped storage hydropower (Q-PSH), as one of the newly proposed APSH technology, to provide primary frequency response. To quantify the impact of Q-PSH on frequency response of the U.S. Western Interconnection, a user-defined dynamic model of Q-PSH is developed on the GE Positive Sequence Load Flow (PSLF) platform and is implemented in a set of detailed U.S. Western Electricity Coordination Council (WECC) planning cases in which renewable penetration levels are 20%, 40%, 60% and 80%. Simulation results show that Q-PSH can help improve frequency nadir and settling frequency comparing to the conventional PSH.

frequency response↗

Measurement-Based Approach for Inertia-Trend Analysis of the US Western Interconnection

Rising deployment of inverter-based resources (IBRs), characterized by a lack of rotating mass, is decreasing the total inertia of the system. This can lead to an increased Rate of Change of Frequency (RoCoF) during the disturbance and false activation of protective devices. There is a need to assess the inertia over the past decade amidst the evolving landscape of renewable energy sources to develop strategies for integrating energy storage, enhancing resilience measures, and ensuring the stable and reliable operation of the grid. Therefore, a realistic assessment of the inertia trend using a measurement-based approach that addresses the limitations of existing models is proposed. An inertia study of the Western Interconnection in the United States is performed utilizing the data from 2013 to 2022, obtained from FNET/ GridEye network. The three-second RoCoF time window is chosen for the study as it showed an optimum balance between a strong correlation with the power imbalance (ΔP) and minimum inclusion of primary response from governor. The obtained inertia trend result shows a small percentage declination of inertia over the decade. By examining the result alongside a generation mix graph, insights are gained into the dynamic interplay between shifting energy landscape and system inertia.

Dulal, Saurav↗

Enhanced Distributed Solar Photovoltaic Deployment via Barrier Mitigation or Removal in the Western Interconnection (Final Technical Report)

In 2017, the Western Electricity Coordinating Council (WECC) 2026 Common Case projected that distributed solar PV deployment in the Western U.S. would meet or exceed 16,106 MW of installed capacity by 2026. Of this total, 12,218 MW was projected to be deployed in California and another 3,888 MW was projected to be deployed across Arizona, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. However, WIEB recognized that barriers to distributed solar PV deployment could cause the region to fall short of these projections. WIEB identified three types of perceived barriers that might interfere with the deployment of distributed solar PV generation in the West, including: (1) interconnection barriers; (2) utility rate-design barriers; and (3) reliability barriers.

14 SOLAR ENERGY↗