Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.

17 WIND ENERGY↗

NREL and Clemson University Drivetrain Test Facility Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-13-509

The National Renewable Energy Laboratory (NREL) and Clemson University have a mutual interest in collaborating in the development of wind turbine drivetrain testing facilities and grid simulators. NREL and Clemson University will work together to share resources and experiences in the development of future wind energy test facilities and capabilities. The CRADA includes sharing of facility topologies and capabilities, modeling efforts, commissioning plans, test protocols, infrastructure cost data, test plans, pro forma contracting instruments, and safe operating strategies. Further, NREL and Clemson University will exchange staff for training and development purposes, including collaborative participation in commissioning and customer testing. DOE has provided NREL with over 10 years of support in developing custom facilities and capabilities to enable testing of full-scale integrated wind turbine drivetrain systems in accordance with the needs of the US wind industry. NREL currently operates a 2.5MW dynamometer and is in the processes of building a 5MW dynamometer and a grid simulator (referred to as a 'Controllable Grid Interface' or CGI). Clemson University is currently building a drivetrain testing facility with two dynamometers, 7.5 MW and 15 MW, and 15 MW Hardware in the loop grid simulator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of dynamic testing of full-scale wind turbine drivetrains with hardware-in-the-loop

Dynamometer testing of full-scale wind turbine drivetrains involves subjecting integrated components to extreme static loads, fatigue loads, or dynamic loads to replicate field conditions. This paper provides a detailed evaluation of the uncertainty and errors in applied loads and measured responses, and their magnitude relative to established repeatability bounds for a drivetrain subjected to static and dynamic loads on the 7.5 MW test bench at the Clemson University Wind Turbine Drivetrain Testing Facility. An ideal drivetrain simulation model is utilized to isolate the influence of load tracking errors on test article responses. It is shown that the test article response variations are mainly driven by run out and clearances inherent to the drivetrain. For the dynamic profiles, the load tracking errors are within acceptable limits. Furthermore, a frequency analysis is used to show that the test bench controller tracking performance is acceptable for profiles with frequency content up to 1.5 Hz.

17 WIND ENERGY↗

Structural Testing Technology Development: Cooperative Research and Development Final Report, CRADA Number CRD-06-00200

NREL is the only organization in the US that is accredited to conduct tests of wind turbine systems and components in accordance with International Electrotechnical Commission (IEC) test standards. The National Wind Technology Center houses the only full-scale wind turbine blade drivetrain test facilities in the US. To maintain these facilities, accreditation, and the acceptance of the wind industry, NREL must strive continuously to maintain and improve staff capabilities, procedures, facility and equipment. In addition, as wind turbines continue to increase in size, NREL must improve its capability to test the larger components associated with these new turbines. NREL is currently investigating methods to increase blade and drivetrain testing capabilities. Mitsubishi Power Systems (MPS) must also strive to meet the demands of the evolving wind energy industry by developing, proving and manufacturing new, cost-effective blades for its turbines. Mitsubishi has established a joint venture with TPI composites of Rhode Island for manufacturing blades to be installed on US wind turbines. There is an obvious advantage to test these prototype blades in a US facility. The NREL blade test facility is uniquely capable of fulfilling this need. In addition, NREL can provide other testing support to MPS through the use of its dynamometer facility for drivetrain testing and through the use of NREL’s field-testing capabilities for testing wind turbine systems. This CRADA provides the opportunity for both organizations to achieve critical goals in development of wind energy in the US. MPS obtains verification of its wind turbine components and system. NREL obtains improved test capabilities.

17 WIND ENERGY↗

NWTC Dynamometer and Controllable Grid Interface Commissioning and Testing of General Electric Wind Turbine Drivetrain: Cooperative Research and Development Final Report, CRADA Number CRD 14-551

This CRADA (1) facilitates commissioning of the new NWTC 5MW dynamometer facility while testing a General Electric (Participant) 2.75MW wind turbine drivetrain under loaded conditions, (2) facilitates commissioning of the new NWTC the Controllable Grid Interface (CGI) as part of testing the GE 2.75MW drivetrain, (3) facilitates further wind turbine drivetrain testing utilizing the commissioned dynamometer and CGI test facilities.

17 WIND ENERGY↗

15 MW HArdware-in-the-loop Grid Simulation Project

The 15MW Hardware-in-the-loop (HIL) Grid Simulator project was to (1) design, (2) construct and (3) commission a state-of-the-art grid integration testing facility for testing of multi-megawatt devices through a ‘shared facility’ model open to all innovators to promote the rapid introduction of new technology in the energy market to lower the cost of energy delivered. The 15 MW HIL Grid Simulator project now serves as the cornerstone of the Duke Energy Electric Grid Research, Innovation and Development (eGRID) Center. This project leveraged the 24 kV utility interconnection and electrical infrastructure of the US DOE EERE funded WTDTF project at the Clemson University Restoration Institute in North Charleston, SC. Additionally, the project has spurred interest from other technology sectors, including large PV inverter and energy storage testing and several leading edge research proposals dealing with smart grid technologies, grid modernization and grid cyber security. The key components of the project are the power amplifier units capable of providing up to 20MW of defined power to the research grid. The project has also developed a one of a kind solution to performing fault ride-through testing by combining a reactive divider network and a large power converter into a hybrid method. This unique hybrid method of performing fault ride-through analysis will allow for the research team at the eGRID Center to investigate the complex differences between the alternative methods of performing fault ride-through evaluations and will ultimately further the science behind this testing. With the final goal of being able to perform HIL experiments and demonstration projects, the eGRID team undertook a significant challenge with respect to developing a control system that is capable of communicating with several different pieces of equipment with different communication protocols in real-time. The eGRID team developed a custom fiber optical network that is based upon FPGA hardware that allows for communication between the key real-time interfaces and reduces the latency between these interfaces to acceptable levels for HIL experiments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL and DONG Energy Collaboration for Grid Simulator Controls and Testing: Cooperative Research and Development Final Report, CRADA Number CRD-13-527

The National Renewable Energy Laboratory (NREL) and DONG Energy are interested in collaborating for the development of control algorithms, modeling, and grid simulator testing of wind turbine generator systems involving NWTC's advanced Controllable Grid Interface (CGI). NREL and DONG Energy will work together to develop control algorithms, models, test methods, and protocols involving NREL's CGI, as well as appropriate data acquisition systems for grid simulation testing. The CRADA also includes work on joint publication of results achieved from modeling and testing efforts. Further, DONG Energy will send staff to NREL on a long-term basis for collaborative work including modeling and testing. NREL will send staff to DONG Energy on a short-term basis to visit wind power sites and participate in meetings relevant to this collaborative effort. DOE has provided NREL with over 10 years of support in developing custom facilities and capabilities to enable testing of full-scale integrated wind turbine drivetrain systems in accordance with the needs of the US wind industry. NREL currently operates a 2.5MW dynamometer and is in the processes of commissioning a 5MW dynamometer and a grid simulator (referred to as a 'Controllable Grid Interface' or CGI). DONG Energy is the market leader in offshore wind power development, with currently over 1 GW of on- and offshore wind power in operation, and 1.3 GW under construction. DONG Energy has on-going R&D projects involving high voltage DC (HVDC) transmission.

17 WIND ENERGY↗

Wind Turbine Drivetrain Reliability Collaborative Workshop: A Recap

The Wind Turbine Drivetrain Reliability Collaborative Workshop was convened by the National Renewable Energy Laboratory (NREL), Argonne National Laboratory, and the U.S. Department of Energy to explore the state of the art in wind turbine drivetrain mechanical system reliability as well as research and development (R&D) challenges that if solved could have significant benefits. The workshop was held at the Research Support Facility on NREL's main campus in Golden, Colorado, from February 16-17, 2016. More than 120 attendees participated from industry, academia, and government. Plenary presentations covered wind turbine drivetrain design, testing, and analysis; tribology -- the science and engineering of interacting surfaces in relative motion -- and failure modes; and condition monitoring and data analytics. In addition to the presentations, workshops were held in each of these areas to discuss R&D challenges. This report serves as a summary of the presentations, workshops, and conclusions on R&D challenges in wind turbine drivetrain reliability.

16 TIDAL AND WAVE POWER↗

National Wind Technology Center Dynamic 5-Megawatt Dynamometer

The National Wind Technology Center (NWTC) offers wind industry engineers a unique opportunity to conduct a wide range of tests. Its custom-designed dynamometers can test wind turbine systems from 1 kilowatt (kW) to 5 megawatts (MW). The NWTC's new dynamometer facility simulates operating field conditions to assess the reliability and performance of wind turbine prototypes and commercial machines, thereby reducing deployment time, failures, and maintenance or replacement costs. Funded by the U.S. Department of Energy with American Recovery and Reinvestment Act (ARRA) funds, the 5-MW dynamometer will provide the ability to test wind turbine drivetrains and connect those drivetrains directly to the electricity grid or through a controllable grid interface (CGI). The CGI tests the low-voltage ride-through capability of a drivetrain as well as its response to faults and other abnormal grid conditions.