Search NASA⌕ Search

SEARCH · Search NASA

Results for “abandoned wells”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Monitoring Well Abandonment Completion Report for KARS Park1, Mobil Service Station, and Hypergol Maintenance Material North Solid Waste Management Units: 084, 093, and 090

The intended purpose of the Monitoring Well Abandonment project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by abandoning monitoring wells throughout KSC that have been identified and prioritized as locations that no longer serve usefulness to program. The monitoring wells were abandoned in accordance with the Brevard County Health Departments and St. Johns River Water Management Districts rules and guidelines.

Timothy M Jellett↗

Well Abandonment at Various Sites, John F. Kennedy Space Center, Florida

Between January 29 and March 9, 2016, a total of 23 monitoring wells were properly abandoned-in-place at five KSC sites (OPF-1&2, OPF-3, RDG, SRB, and HSB). The total abandonment encompassed 489.06 linear feet. The wells abandoned were constructed of PVC with diameters ranging from 1-inch to 2-inches. The shallowest well abandoned was measured to be 11.6 ft bls (OPF) and the deepest well abandoned was documented to be 51.45 feet bls (HSB). All aboveground completions were removed and each area was re-graded and/or grouted to surface to match existing surroundings. All materials (concrete pads, well casings, etc.) were disposed of accordingly.

MW↗

Artesian Well Abandonment at Launch Complex 39A

The artesian well tasked for abandonment was located on the LOX side (northwest area) of the launch complex. The exact date of well installation is unknown. The well was no longer in use at the time of the abandonment request, but was previously utilized under St. Johns River Water Management District (SJRWMD) consumptive use permit (No. 50054) for the Floridian Aquifer. The exact construction details of the LOX artesian well were also unknown; however, a similar-type artesian well was previously located on the LH2 side of the site, which was abandoned in 2012. Based on discussions with the NASA RPM and review of the LH2 artesian well abandonment completion report, the LH2 artesian well was reported to be an 8-inch diameter, 330-foot deep well. The NASA RPM communicated that the LOX artesian well was likely to be an 8-inch diameter, 380-foot deep well. This information was used for scoping, and was subsequently confirmed to be substantially accurate. No additional information could be found for the LOX artesian well using the NASA Remediation Information System (RIS).

Morgan, Lindsay↗

Development and implementation of a scrub habitat compensation plan for Kennedy Space Center

Kennedy Space Center (KSC), located on Merritt Island on the east coast of central Florida, is one of three remaining major populations of the Florida Scrub Jay (Aphelocoma coerulescens coerulescens), listed as threatened by the U.S. Fish and Wildlife Service (USFWS) since 1987. Construction of new facilities by the National Aeronautics and Space Administration (NASA) on KSC over the next five years has the potential to impact up to 193 ac (78.1 ha) of Scrub Jay habitat. Under an early consultation process with the Endangered Species Office of the USFWS, NASA agreed to a compensation plan for loss of Scrub Jay habitat. The compensation plan required NASA to restore or create scrub on KSC at a 2:1 ratio for that lost. The compensation plan emphasized restoration of scrub habitat that is of marginal or declining suitability to Scrub Jays because it has remained unburned. Although prescribed burning has been conducted by the USFWS Merritt Island National Wildlife Refuge (MINWR) for more than ten years, significant areas of scrub remain unburned because they have been excluded from fire management units or because landscape fragmentation and a period of fire suppression allowed scrub to reach heights and diameters that are fire resistant. For such areas, mechanical cutting followed by prescribed burning was recommended for restoration. A second part of the restoration plan is an experimental study of scrub reestablishment (i.e., creation) on abandoned, well drained agricultural sites by planting scrub oaks and other scrub plants. The compensation plan identified 260 ac (105 ha) of scrub restoration in four areas and a 40 ac (16 ha) scrub creation site. Monitoring of restoration sites required under the plan included: establishing permanent vegetation sample transects before treatment and resampling annually for ten years after treatment, and color banding Scrub Jays to determine territories prior to treatment followed by monitoring reproductive success and survival for ten years after treatment. Monitoring scrub creation sites included determining survival of planted material for five years and establishing permanent transects to follow vegetation development for ten years after planting. Scrub Jay monitoring of creation sites is incorporated with that of adjacent restoration sites.

Schmalzer, Paul A.↗

Listening to That Voice Inside

Many leaders who commonly use intuition are reluctant to talk about it, considering it too soft and "mystical" a process to openly acknowledge. But the more we share and discuss stories of decisions based on intuition, the more we learn about when and how to employ it. Trusting one's intuition doesn't necessarily mean one has to abandon well acceptd processes.

Stickel, Dave↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Partial Air Sparge System Abandonment at Launch Complex 39B, SWMU 009 Implementation Report

This project included AS system abandonment activities for a small portion of the LC39B AS system in support of crane operations planned at LC39B. The specific objectives are: •Remove/cap AS system components and abandon AS/monitoring wells (MWs) within identified area in support of critical mission support construction operations; •Photograph, document size, and location of any AS piping to be left in place; •Provide as-builts with survey data of piping that is left in place so it can be provided to the KSC Mater Planning office for recording by RPM; and •Properly transport concrete and other construction debris off site and dispose of at an appropriate facility in accordance with all local and federal regulations. Following completion of abandonment activities, ensure all areas of operation are graded so no trip hazards exist.

Jason J Bublitz↗

An electromagnetic noncontacting sensor for thickness measurement in a dispersive medium

This paper describes a general purpose imaging technology developed by the U.S. Bureau of Mines (USBM) that, when fully implemented, will solve the general problem of 'seeing into the earth.' A first-generation radar coal thickness sensor, the RCTS-1, has been developed and field-tested in both underground and highwall mines. The noncontacting electromagnetic technique uses spatial modulation created by moving a simple sensor antenna in a direction along each axis to be measured while the complex reflection coefficient is measured at multiple frequencies over a two-to-one bandwidth. The antenna motion imparts spatial modulation to the data that enables signal processing to solve the problems of media, target, and antenna dispersion. Knowledge of the dielectric constant of the media is not necessary because the electrical properties of the media are determined automatically along with the distance to the target and thickness of each layer of the target. The sensor was developed as a navigation guidance sensor to accurately detect the coal/noncoal interface required for the USBM computer-assisted mining machine program. Other mining applications include the location of rock fractures, water-filled voids, and abandoned gas wells. These hazards can be detected in advance of the mining operation. This initiating technology is being expanded into a full three-dimensional (3-D) imaging system that will have applications in both the underground and surface environment.

Chufo, Robert L.↗

Decommissioning of Air Sparge System at Vertical Processing Facility, Solid Waste Management Unit 077 Implementation Report

This document discusses the decommissioning of the air sparge (AS) system at the Vertical Processing Facility (VPF), Solid Waste Management Unit 077 at Kennedy Space Center, Florida completed between January 30, 2023, and February 8, 2023. A 2005 Resource Conservation and Recovery Act Facility Investigation identified chlorinated volatile organic compound impacts at the site. Following assessment activities, an AS system was in operation intermittently from April 2012 through October 2017, when the system was permanently shutdown due to equipment failure. Trichloroethene and vinyl chloride remained above their groundwater cleanup target levels in several monitoring wells and the site was moved into the Industrial Area Long Term Monitoring Program. VPF continues to be sampled biennially; the most recent event was May 2022. Successful implementation of this decommissioning project will reduce the risk of accidental AS and soil vapor extraction well damage and will lower operating costs associated with maintaining obsolete AS systems. Decommissioning the AS system at VPF included vegetation clearing to access AS wells and associated piping, abandonment of all on site AS wells, temporary electrical outage, and site restoration. At the completion of demobilization and site restoration activities, the site was returned to its original or better than original condition.

Jason J Bublitz↗

Launch Complex 39A, SWMU 008 2023 Long-Term Monitoring Report Kennedy Space Center, Florida

The 2023 Long-Term Monitoring (LTM) Report (LTMR) presents the annual and semi-annual groundwater monitoring results for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, at Kennedy Space Center (KSC), Florida. The reporting period covered under this LTMR is from January to December 2023, and represents the first year of site-wide monitoring following Air Sparge (AS) system shutdown at the end of 2022. AS system operation at LC39A began operation in 2015. The AS system consisted of a total of 173 AS wells ranging in depth from 11 to 37 feet below land surface. The overall remedial objective for the AS Interim Measure was to actively decrease concentrations of COCs to less than their respective Florida Department of Environmental Protection Natural Attenuation Default Concentrations, so that LC39A can transition into an LTM program. This objective was achieved in 2022, with 2023 marking Year 1 of the LTM program to monitor the residual groundwater plume. VOC results indicate that COC concentrations have continued to decrease or stabilize, with no rebound observed since AS system shutdown. Vinyl chloride was the only COC detected above its GCTL, with the highest concentration detected at 8.0 μg/L. PFAS results detected 15 different PFAS compounds (out of 32 analyzed) between the six monitoring wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). PFOS was detected in one of the six samples above the FDEP Provisional GCTL at a concentration of 200 ng/L. PFOA was not detected above the FDEP Provisional GCTL in any of the six samples. PFOS and PFOA also currently have United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 ng/L. PFOS was detected in all six samples above the USEPA MCL. PFOA was detected in three of the six samples above the USEPA MCL. Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the six wells. Additional PFAS sampling will occur as part of a PFAS Site Assessment to be conducted in the future. Based on Year 1 LC39A LTM results, recommendations for 2024 are to continue with the second year of LTM in 2024 with the same monitoring well network as Year 1 (18 wells). The three wells that were on a semi-annual schedule will transition to an annual schedule to align with the remaining wells. The next annual event is scheduled for May 2024. The three wells that were found to be inadvertently destroyed will be properly abandoned and a replacement well in the vicinity of former monitoring well 21ST-MW0030I will be installed. This new well will be added to the LTM sampling plan upon installation.

Deborah M. Wilson↗

Wilson Corners SWMU 001 2015 Annual Long Term Monitoring Report Kennedy Space Center, Florida

This document presents the findings of the 2015 Long Term Monitoring (LTM) that was completed at the Wilson Corners site, located at the National Aeronautics and Space Administration John F. Kennedy Space Center, Florida. The objectives of the 2015 LTM event were to evaluate the groundwater flow direction and gradient, to monitor the vertical and horizontal extent of the volatile organic compounds (VOCs; including the upgradient and sidegradient extents, which are monitored every five years), and to monitor select locations internal to the dissolved groundwater plume. The 2015 LTM event included several upgradient and sidegradient monitoring wells that are not sampled annually to verify the extent of VOCs in this portion of the site. The December 2015 LTM groundwater sampling event included, depth to groundwater measurements, 40 VOC samples collected using passive diffusion bags, and one VOC sample collected using low-flow techniques. Additionally, monitoring well MW0052DD was overdrilled and abandoned using rotasonic drilling techniques. The following conclusions can be made based on the 2015 LTM results: groundwater flow is generally to the west with northwest and southwest flow components from the water table to approximately 55 feet below land surface (ft BLS); peripheral monitoring wells generally delineate VOCs to groundwater cleanup target levels (GCTLs) except for monitoring wells MW0088, MW0090, MW0095, and NPSHMW0039, which had vinyl chloride (VC) concentrations near the GCTL and MW0062, which had trichloroethene (TCE), cis-1,2-dichloroethenen (cDCE), and VC concentrations above natural attenuation default concentrations (NADCs); VOCs in interior downgradient wells generally fluctuate within historic ranges except for monitoring wells in the north-northwest portion of the site, which have increasing VC concentrations indicating potential plume migration and expansion; Historically, the vertical extents of the VOCs were delineated by monitoring wells screened greater than 60 ft BLS (MW0083 through MW0086, and MW0078). The 2015 LTM results indicate that concentrations of daughter product cDCE is greater than the NADC in MW0078 and that cDCE and VC are greater than NADCs in MW0130. TCE was greater than the GCTL in monitoring well MW130 and not detected above method detection limits (9 micrograms per Liter) in monitoring well MW0078. No GCTL exceedances were identified in monitoring wells MW0083 or MW0086; the dissolved plume footprint appears generally stable, though not fully delineated by monitoring well data in the northeast portion of the site; and 2015 LTM results generally support the existing Conceptual Site Model. Geosyntec recommends modifying the LTM program, collecting a verification sample from monitoring well MW0062, and performing a direct push technology instigation in the northnortheastern portion of the site. A cluster of monitoring wells (MW0132 [2 to 12 ft BLS], MW0133 [15 to 25 ft BLS], and MW0134 [29 to 34 ft BLS]) is proposed to delineate impacts in the northnortheast portion of the site. Geosyntec recommends installation of a vertical extent well in the center of the site (Hot Spot 2 area) post-remediation implementation.

groundwater↗

Adapting New Space System Designs into Existing Ground Infrastructure

As routine space operations extend beyond earth orbit, the ability for ground infrastructures to take on new launch vehicle systems and a more complex suite of spacecraft and payloads has become a new challenge. The U.S. Vision for Space Exploration and its Constellation Program provides opportunities for our space operations community to meet this challenge. Presently, as new flight and ground systems add to the overall groundbased and space-based capabilities for NASA and its international partners, specific choices are being made as to what to abandon, what to retain, as well as what to build new. The total ground and space-based infrastructure must support a long-term, sustainable operation after it is all constructed, deployed, and activated. This paper addresses key areas of engineering concern during conceptual design, development, and routine operations, with a particular focus on: (1) legacy system reusability, (2) system supportability attributes and operations characteristics, (3) ground systems design trades and criteria, and (4) technology application survey. Each key area explored weighs the merits of reusability of the infrastructure in terms of: engineering analysis methods and techniques; top-level facility, systems, and equipment design criteria; and some suggested methods for making the operational system attributes (the "-ilities") highly visible to the design teams and decisionmakers throughout the design process.

ground system↗

Weathering in the Forelands of Two Rapidly Retreating Alpine Glaciers of Volcanic Bedrock in the Three Sisters, Oregon, USA

The glaciers of the Three Sisters volcanoes in Cascadia have retreated dramatically over the past century. In order to understand ongoing chemical weathering and solute transport in the proglacial valleys, waters were sampled from glacier outwash streams, local snowmelt, and proglacial springs and lakes at Collier and Diller Glaciers. To understand weathering and transport processes in the proglacial plains, infrared orbital remote sensing data was used to map compositional variability and highlight weathering products, which were then ground-truthed with laboratory mineralogical and chemical analyses of sediments. The hydrochemistry is significantly affected by a sub- and proglacial mafic weathering system lacking carbonate minerals. Here we report major ion concentrations in meltwaters for the summer 2016 and 2017 melt seasons. Total cation concentrations range from 3 to 250 μeq/l and dissolved bicarbonate concentrations range from 2 to 200 μeq/l. Other dissolved anions are negligible compared to bicarbonate. Dissolved silica concentrations range from 2 to 260 μmol/l, comparable to total dissolved cation concentrations. The highest cation and silica concentrations were measured in moraine-sourced springs. Compositional remote sensing analysis identified alteration zones in the proglacial plains at both Collier and Diller indicating potential hydrated silica. This analysis is consistent with laboratory analysis of sediment samples, which indicate the presence of poorly crystalline phases weathering products, including hydrated silica. Weathered materials are preferentially deposited on moraines due to aeolian and glacial transport, as well as intra-moraine alteration, and at abandoned stream terraces due to fluvial transport. Geochemical measurements indicate that the predominant form of chemical weathering in these periglacial mafic systems is the carbonation of feldspar as well as reactive volcanic glass. The presence of poorly crystalline silicates, as indicated by remote sensing datasets and laboratory analysis, is consistent with rapid weathering of feldspars and glass and formation of Fe-Al-Si-bearing mineraloids in these proglacial valleys. This weathering regime has wide-ranging implications for atmospheric CO2 drawdown due to cold-climate volcanic rock weathering.

Rutledge, Alicia M.↗

Polarization signatures for abandoned agricultural fields in the Manix Basin area of the Mojave Desert

Polarimetric signatures from abandoned circular alfalfa fields in the Manix Basin area of the Mojave desert show systematic changes with length of abandonment. The obliteration of circular planting rows by surface processes could account for the disappearance of bright 'spokes', which seems to be reflection patterns from remnants of the planting rows, with increasing length of abandonment. An observed shift in the location of the maximum L-band copolarization return away from VV, as well as an increase in surface roughness, both occurring with increasing age of abandonment, seems to be attributable to the formation of wind ripple on the relatively vegetationless fields. A Late Pleistocene/Holocene sand bar deposit, which can be identified in the radar images, is probably responsible for the failure of three fields to match the age sequence patterns in roughness and peak shift.

Ray, Terrill W.↗

Polarization signatures for abandoned agricultural fields in the Manix Basin area of the Mojave Desert - Can polarimetric SAR detect desertification?

Radar backscatter from abandoned circular alfalfa fields in the Manix Basin area of the Mojave desert shows systematic changes with length of abandonment. The obliteration of circular planting rows by surface processes could account for the disappearance of bright spokes, which seem to be reflection patterns from remnants of the planting rows, with increasing length of abandonment. An observed shift in the location of the maximum L-band copolarization return away from VV, as well as an increase in surface roughness, both occurring with increasing age of abandonment, seems to be attributable to the formation of wind ripples on the relatively vegetationless fields.

Ray, Terrill W.↗

Mapping Process to Pattern in the Landscape Change of the Amazonian Frontier

Changes in land use and land cover are dynamic processes reflecting a sequence of decisions made by individual land managers. In developing economies, these decisions may be embedded in the evolution of individual households, as is often the case in indigenous areas and agricultural frontiers. One goal of the present article is to address the land use and land-cover decisions of colonist farmers in the Amazon Basin as a function, in part, of household characteristics. Another goal is to generalize the issue of tropical deforestation into a broader discussion on forest dynamics. The extent of secondary forest in tropical areas has been well documented in South America and Africa. Agricultural-plot abandonment often occurs in tandem with primary forest clearance and as part of the same decision-making calculus. Consequently, tropical deforestation and forest succession are not independent processes in the landscape. This article presents a framework that integrates them into a model of forest dynamics at household level, and in so doing provides an account of the spatial pattern of deforestation that has been observed in the Amazon's colonization frontiers.

Walker, Robert↗

Further improvements of a new model for turbulent convection in stars

The effects of including a variable molecular weight and of using the newest opacities of Rogers and Iglesias (1991) as inputs to a recent model by Canuto and Mazzitelli (1991) for stellar turbulent convection are studied. Solar evolutionary tracks are used to conclude that the the original model for turbulence with mixing length Lambda = z, Giuli's variable Q unequal to 1 and the new opacities yields a fit to solar T(eff) within 0.5 percent. A formulation of Lambda is proposed that extends the purely nonlocal Lambda = z expression to include local effects. A new expression for Lambda is obtained which generalizes both the mixing length theory (MLT) phenomenological expression for Lambda as well as the model Lambda = z. It is argued that the MLT should now be abandoned.

Canuto, V. M.↗