Test simulation of neutron damage to electronic components using accelerator facilities
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
The Integrable Optics Test Accelerator (IOTA) at Fermilab is transitioning from an electron beam facility to a proton beam facility for studies in nonlinear accelerator optics and space-charge dominated proton beams. This project involves the commissioning and fabrication of Ionization Profile Monitors (IPMs) to enable beam profile measurements at IOTA. In general, IPMs work on principle of residual gas ionization by the beam to generate beam profile. This work focuses on a mechanical design that leverages a controlled injection of noble gases, primarily Argon, as the ultra-high vacuum of the IOTA ring provides insufficient residual gas for ionization. Efforts to understand vacuum integration to ensure compatibility with the storage ring environment, the integration of real-time data acquisition systems and the commissioning of the IPMs will be discussed. This project provides a versatile diagnostic tool, supporting IOTA’s role as a testbed for larger-scale accelerator facilities and contributing to the broader understanding of beam physics in high-intensity, high-space-charge regimes.
Explore the source record for details and available documents.
The Integrable Optics Test Accelerator (IOTA) is a storage ring for advanced beam physics research currently being built and commissioned at Fermilab. It will operate with protons and electrons using injectors with momenta of 70 and 150 MeV/c, respectively. The research program includes the study of nonlinear focusing integrable optical beam lattices based on special magnets and electron lenses, beam dynamics of space-charge effects and their compensation, optical stochastic cooling, and several other experiments. In this article, we present the design and main parameters of the facility, outline progress to date and provide the timeline of the construction, commissioning and research. Finally, the physical principles, design, and hardware implementation plans for the major IOTA experiments are also discussed.
N/A
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract Not Provided
Not Available
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Fermilab is the nation’s particle physics laboratory, supported by the DOE Office of High Energy Physics (OHEP). Fermilab is a world leader in accelerators, with a demonstrated track-record— spanning four decades—of excellence in accelerator science and technology. We describe the significant opportunity to complete, in a highly leveraged manner, a unique accelerator research facility that supports the broad strategic goals in accelerator science and technology within the OHEP. While the US accelerator-based HEP program is oriented toward the Intensity Frontier, which requires modern superconducting linear accelerators and advanced highintensity storage rings, there are no accelerator test facilities that support the accelerator science of the Intensity Frontier. Further, nearly all proposed future accelerators for Discovery Science will rely on superconducting radiofrequency (SRF) acceleration, yet there are no dedicated test facilities to study SRF capabilities for beam acceleration and manipulation in prototypic conditions. Finally, there are a wide range of experiments and research programs beyond particle physics that require the unique beam parameters that will only be available at Fermilab’s Advanced Superconducting Test Accelerator (ASTA). To address these needs we submit this proposal for an Accelerator R&D User Facility at ASTA. The ASTA program is based on the capability provided by an SRF linac (which provides electron beams from 50 MeV to nearly 1 GeV) and a small storage ring (with the ability to store either electrons or protons) to enable a broad range of beam-based experiments to study fundamental limitations to beam intensity and to develop transformative approaches to particle-beam generation, acceleration and manipulation which cannot be done elsewhere. It will also establish a unique resource for R&D towards Energy Frontier facilities and a test-bed for SRF accelerators and high brightness beam applications in support of the OHEP mission of Accelerator Stewardship.
Demonstrating the viability of Advanced Accelerator Concepts (AAC) relies on experimental validation. Over the last three decades, the U.S. has maintained a portfolio of advanced and novel accelerator test facilities to support research critical to AAC. The facilities have enabled pioneering developments in a wide variety of beam and accelerator physics, including plasma-wakefield and structure-wakefield acceleration. This work provides an overview of the current portfolio of U.S. facilities possessing charged particle drive beams with high energies, on the order of tens of joules per pulse, or drive lasers with high peak powers, on the order of a petawatt, and are actively conducting AAC research.
Demonstrating the viability of Advanced Accelerator Concepts (AAC) relies on experimental validation. Over the last three decades, the US has maintained a portfolio of advanced and novel accelerator test facilities to support research critical to AAC. The facilities have enabled pioneering developments in a wide variety of beam and accelerator physics, including plasma-wakefeld and structure-wakefeld acceleration. This paper provides an overview of the current portfolio of US facilities possessing charged particle drive beams with high energies, on the order of tens of joules per pulse, or drive lasers with high peak powers, on the order of a petawatt, and are actively conducting AAC research.
Funding is being requested pursuant to the proposals entitled Elliptical Twin Cavity for Accelerator Applications that was submitted and reviewed through the Portfolio Analysis and Management System (PAMS). The PAMS proposal identifier number is 0000219731. The proposed new type of superconducting cavity, the Elliptical Twin Cavity, is capable of accelerating or decelerating beams in two separate beam pipes. This configuration is particularly effective for high-current, low energy electron beams that will be used for bunched beam cooling of high-energy protons or ions. Having the accelerated beam physically separated from the decelerated beam, but interacting with the same RF mode, means that the low energy beam from the gun can be injected into to the superconducting cavity without bends enabling a small beam emittance to be maintained. A staff engineer who has been working with non-standard complicated cavity structures replaces the senior engineer (in the original budget) who is moving on to be a project leader. This is reflected in a slightly increased engineer time and in reduced costs. The Indirect costs for FY16 are lower than the previous projection. As a result, there is no scope reduction.
The European XFEL project launched on June 5, 2007 will require about 103 accelerator modules as a main part of the XFEL linear accelerator. All superconducting components constituting the accelerator module like cavities and magnets have to be tested before the assembly. For the tests of the individual cavities and the complete modules an XFEL Accelerator Module Test Facility (AMTF) has been erected at DESY. The process control system EPICS (Experimental Physics and Industrial Control System) is used to control and operate the cryogenic plant and all its subcomponents. A complementary component of EPICS is the Open Source software suit CSS (Control System Studio). CSS is an integrated engineering, maintenance and operating tool for EPICS. CSS enables local and remote operating and monitoring of the complete system and thus represents the human machine interface. More than 250 PROFIBUS nodes work at the accelerator module test facility. DESY installed an extensive diagnostic and condition monitoring system. With these diagnostic tools it is possible to examine the correct installation and configuration of all PROFIBUS nodes in real time. The condition monitoring system based on FDT/DTM technology shows the state of the PROFIBUS devices at a glance. This information can be used for preventive maintenance which is mandatory for continuous operation of the AMTF facility. The poster will describe all steps form engineering to implementation and commissioning.