ACCERT

The main function of ACCERT (The Algorithm for the Capital Cost Estimation of Reactor Technologies) is to provide an item-by-item estimate of the cost of a facility, at present a nuclear reactor complex, primarily nuclear power stations. The core of ACCERT is the large number of algorithms that have been developed and will continue to be developed. ACCERT is also a general methodology for identifying and organizing the individual items that are estimated using the ACCERT algorithms. ACCERT also summarize status and results; to save results and pull information from previous analyses; and to provide an interactive dynamic graphical user interface for a wide range of functions and visualizations.

Zhou, Jia [Argonne National Laboratory (ANL), Argo↗

NE-COST plug-in: Expanding ACCERT's Capabilities for Life-Cycle Cost Modeling

The Algorithm for the Capital Cost Estimation of Reactor Technologies (ACCERT) is a structured methodology and software tool designed to simplify and standardize cost estimation for nuclear reactor technologies [1]. By utilizing a relational database structure and modular cost estimation algorithms, ACCERT delivers a robust, flexible, and scalable framework for evaluating costs across various reactor types and configurations [2]. The recent integration of the NE-COST plugin further expands ACCERT’s scope by introducing detailed life-cycle cost modeling and probabilistic analysis of uncertainties. This addition enables users to evaluate costs across front-end processes such as uranium enrichment and fabrication, as well as back-end activities including waste disposal and geologic storage. Through Monte Carlo statistical cost simulations, the plugin provides probabilistic insights into cost ranges, offering critical decision-making support for stakeholders including reactor developers, policymakers, and researchers.

Zhou, Jia↗

Demonstration of ACCERT Software for Nuclear Power Plant Techno-Economics

In the past few years, there has been a renewed interest in the deployment of nuclear power for decarbonizing the electricity grid as well as a range of industrial applications. As the demonstrations of advanced nuclear power plants start to begin, there will likely be a further increase in this interest. As nuclear is being considered as a part of the energy mix, understanding the cost of nuclear energy becomes increasingly important for all stakeholders including advanced reactor vendors (for making design decisions and marketing their designs), users of nuclear energy (e.g., to estimate the cost of decarbonization of other industries using nuclear), and government (e.g., in capacity expansion models that are used in framing policy). In this summary, we demonstrate a software tool called ACCERT that is currently being developed with funding from the Systems Analysis and Integration (SA&I) program under the Department of Energy’s Office of Nuclear Energy (DOE NE). ACCERT is a cost estimation and techno-economics tool for nuclear power plant applications that includes a database of (a) cost estimates of various ‘reference’ nuclear power plant designs gathered from existing literature, and (b) algorithms developed from these costs that can be used extrapolate the existing costs and perform a bottom-up cost estimation of other designs. A companion summary describes the software and its design in more detail and this summary presents a demonstration for four different nuclear power plant designs: a pressurized water reactor (PWR), high-temperature gas reactor (HTGR), sodium fast reactor (SFR), and a heat-pipe microreactor. The demonstrations include the reference cost estimates and the cost estimates of a modified design for each reference case.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗