Search NASA⌕ Search

SEARCH · Search NASA

Results for “advanced protection relaying”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Integration of Next Generation Critical Infrastructure Sensor Technologies

This project is focused on advancing current protective relaying and control through verifying next generation timing systems and sensors with current commercial off the shelf protective relays. This will further research in the field of advanced grid modernization and demonstrate interoperability between nextgeneration protective relays and voltage and current sensors. These commercial off the shelf (COTS) technologies were tested and integrated with next generation sensor technologies, with the results documented below.

47 OTHER INSTRUMENTATION↗

Smart Contracts for Power Grid Applications Using the Advanced DLT Cyber Grid Guard Testbed

In this study is presented two power system applications with distributed ledger technology (DLT) and smart contracts (SC) that were assessed in a Cyber-Grid-Guard System (CGGS) advanced testbed, with protective relays, power meters, communication devices, DLT devices, synchronized time source, clock displays and real time simulator. This CGGS testbed was set in the Advanced Protection Lab, 252 lab space of the Grid Research Integration and Deployment Center (GRID- C), at Oak Ridge National Laboratory. In power grids, customer-owned distributed energy resources (DERs) are more frequent than in the past, and the numbers of points of interconnection (POI) with customer-owned DERs have increased. Disruptive operation from DERs presents a risk to grid operations, and protective relays located at the POI are used to isolate out-of-tolerance or poorly behaving of DERs. Ensuring the integrity of data from the relays at the POI, and DLT could enhance the security of the power grids. The first application is a SC to define and control the allowable total power factor (TPF) of the DER (wind farm) output, and the terms of the SC are implemented using DLT with a CGGS for a customer-owned DER. The TPF SC was implemented by the CGGS using DLT. The experimental model was performed with a real-time simulator using a CGGS and relay in-the-loop. The data collected from the CGGS were used to execute the TPF SC. The TPF limits were between +0.9 and +1.0, and the breakers’ operation in the POI was controlled by the relay using the SC. The events were collected from the real-time simulator, CGGS, and SEL 700GT relay to validate a successful application of the TPF SC using DLT. The second application is a SC to measure and control the allowable voltage service limits (VSL) by the CGGS using DLT. The tests were performed by using a real-time simulator, CGGS and relay in-the-loop. The data was collected from the CGGS that executed the SC. The main constraints were defined based on ANSI C84.1 service voltage limits, and the operation of the breakers in the POI. The events were collected from the CGGS, and SEL 700GT relay to assess a successful operation of the VSL SC using DLT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges, Industry Practice, and Research Opportunities for Protection of IBR-Rich Systems

The objective of this technical report is to outline the challenges of protection design for power systems rich in inverter-based resources (IBRs), synthesize current industrial practices, review new approaches from recent literature, and explore future opportunities in protection. IBRs are experiencing widespread adoption across both transmission and distribution systems. When present in significant quantities, IBRs challenge the performance of many traditional protection functions. To address these issues, the industry has developed sophisticated protection schemes that involve advanced relaying techniques in highly engineered pilot projects. However, these schemes are expensive and time-consuming to develop, build, and test. Researchers have proposed a number of new approaches for protection in IBR-rich distribution systems. Despite their potential, these new approaches do not address some major shortcomings of industry approaches stemming from complexity, practical requirements, and reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Digital Grid Twin–Direct Communication Scheme Test Bed for Assessing Relay-to-Relay Radio Antenna and Optical Fiber Performance and Misoperations

This study introduces a novel “Digital Grid Twin–Direct Communication Scheme” test bed. This advanced platform evaluates point-to-point communication between transmitter and receiver relays with optical fiber and radio omnidirectional antenna systems, implemented at the Advanced Protection lab in the Grid Research Innovation and Development Center at Oak Ridge National Laboratory. The increased diversity of energy sources has led to more protective relay misoperations. In North America, microgrid protection schemes now use point-to-point communication along distribution lines between relays to implement advanced logic in nonradial grids that include both high- and low-inertia generators. This trend challenges utilities to minimize misoperations while ensuring rapid fault clearance and accurate selectivity coordination between primary and backup relays. This study assesses relay-to-relay communication schemes by introducing an advanced testing platform based on a digital grid twin protection test bed using a synchronized time source system. The platform evaluates the communication system using radio antennas or optical fiber links by integrating protective relays that operate breakers within the digital twin and record relay events and communication signals. In the experiments, transmitter and receiver relays were configured with inverse time overcurrent and breaker trip detection logic to assess the total time of the communication protection schemes based on the sum of the relay protection element operating time, radio latency, propagation delay, baud rate delay, and relay processing time. These delays were derived from recorded relay events and communication signals from the interface of a real-time simulator set as a digital grid twin. The test bed successfully simulated various electrical faults along a distribution line while ensuring effective and reliable point-to-point communication between transmitter and receiver relays. The radio antenna communication system exhibited latency because of the radio. This latency depends on the baud rate setting and type of radio application; in general, the higher the baud rate, the lower the radio latency. The measured radio latency (for Mirrored Bits with an encryption card at 9,600 bps) was about 9–10 ms. Additionally, calculated propagation delay per mile for radio antennas and optical fiber was 5.36 µs/mi and 8.04 µs/mi, respectively. Optical fiber communication did not demonstrate radio latency. Instead, the protection element operating time depends mainly on the protection logic function set in the relay, and the relay processing time depends on the processing rate of the relay in samples per power system cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

pnnl/DPVPROT

Distributed photovoltaics protection software toolkit The code package includes several important functions for design and analysis of new grid protection schemes, for scenarios of distributed photovoltaic (DPV) generation approaching 100% of the peak feeder load, i.e., high-penetration DPV. Convert distribution feeder models, used by planning engineers, to electromagnetic transient (EMT) models that produce waveforms for advanced relay algorithms. Visualize the results of protection scheme operation. Tools to determine distance relay settings on distribution systems. Tools to predict the performance of time-domain, incremental distance relay algorithms

McDermott, Tom↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Precise synchronization of phasor measurements in electric power systems

Phasors representing positive sequence voltages and currents in a power network are in the most important parameters in several monitoring, control, and protection functions in interconnected electric power networks. Recent advances in computer relaying have led to very efficient and accurate phasor measurement systems. When the phasors to be measured are separated by hundreds of miles, it becomes necessary to synchronize the measurement processes, so that a consistent description of the state of the power system can be established. Global Positioning System (GPS) transmissions offer an ideal source for synchronization of phasor measurements. The concept and implementation of this technique are described. Several uses of synchronized phasor measurements are also described. Among these are improved state estimation algorithms, state estimator enhancements, dynamic state estimates, improved control techniques, and improved protection concepts.

Phadke, Arun G.↗

Medium-Voltage Testbed for Comparing Advanced Power Line Sensors vs. Measurement Transformers with Electrical Grid Events

Electrical utilities have relied upon potential transformers (PTs) and current transformers (CTs) for very accurate metering and to provide reliable signals for protective relays. Less expensive alternative sensing technologies offer the possibility of wider deployment, particularly in grids that employ distributed energy resources. In this work, the performance of an advanced medi-um-voltage sensor is compared with a reference PT and CT and experimentally evaluated for different power grid scenarios on an advanced outdoor power line sensor testbed at the US De-partment of Energy’s Oak Ridge National Laboratory. The sensor is based on a capacitive divider for voltage monitoring and a Rogowski coil with integrator for current monitoring. The advanced outdoor power line sensor testbed has a real-time simulator that was used to generate transient scenarios (e.g., electrical faults, capacitor bank operation, service restoration), while the analog signals were recorded by the same high resolution power meter. The behavior of analog signals, harmonic components, total harmonic distortion, and crest factors were assessed for this power line sensor compared with the reference PT/CT, because of the absence for testing standards for advanced outdoor power line sensors.

Piesciorovsky, Emilio↗

Digital Grid Twin–Direct Communication Scheme Test Bed for Assessing Relay-to-Relay Radio Antenna and Optical Fiber Performance and Misoperations

This study introduces a novel “Digital Grid Twin–Direct Communication Scheme” test bed. This advanced platform evaluates point-to-point communication between transmitter and receiver relays with optical fiber and radio omnidirectional antenna systems, implemented at the Advanced Protection lab in the Grid Research Innovation and Development Center at Oak Ridge National Laboratory.

99 GENERAL AND MISCELLANEOUS↗

DOE AGM and NAERM FY23 Annual Accomplishments

This document summarizes FY2023 work performed by Lawrence Livermore National Laboratory (LLNL) in support of the DOE Office of Electricity’s (OE) Advanced Grid Modeling (AGM) program, North American Energy Resilience Model (NAERM), and Protective Relaying (PR) program.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Medium Voltage Testbed for Comparing Advanced Power Line Sensors vs. Transformers with Electrical Grid Events

Electrical utilities have relied upon potential transformers (PTs) and current transformers (CTs) for very accurate metering and to provide reliable signals for protective relays. These devices measure phase voltages and currents and are commissioned by electrical engineers. PTs/CTs can detect and react to various electrical anomalies that could adversely affect electrical grid operations. Less expensive alternative sensing technologies offer the possibility of wider deployment, particularly in grids that employ distributed energy resources. In this work, the performance of an advanced medium-voltage sensor is compared with that of a reference PT and a CT and experimentally evaluated for different power grid scenarios on an advanced outdoor power line sensor testbed at the U.S. Department of Energy’s Oak Ridge National Laboratory. The sensor is based on a capacitive divider for voltage monitoring and a Rogowski coil with an integrator for current monitoring. This study simulated a power grid model based on a utility circuit at the Riverside EPB of Chattanooga. The simulation circuit was created with MATLAB/Simulink software and was integrated into an RT-LAB project to run with the OP4510 real-time simulator at the OPLST. During the tests, the real-time simulations were run for 40 s, and the signal to record the test event with the power meter was set at 30 s for the event-trigger circuit. The advanced outdoor power line sensor testbed has a real-time simulator that is used to generate transient scenarios (e.g., electrical faults, capacitor bank operation, and service restoration), while the analog signals are recorded by the same high-resolution power meter. The behaviors of analog signals, harmonic components, total harmonic distortion, and crest factors are assessed for this power line sensor and compared with those of the reference PT/CT because of the absence of testing standards for advanced outdoor power line sensors. The results showed that this OPLS technology responded identically to the PT and CT under all conditions.

Piesciorovsky, Emilio [ORNL]↗

Inverter Design with High Short-Circuit Fault Current Contribution to Enable Legacy Overcurrent Protection for Islanded Microgrids

The resiliency offered by a microgrid may be lost if the microgrid is not properly protected during short-circuit faults inside its boundaries. Many studies conclude that protecting microgrids in islanded mode is very challenging due to the limited short-circuit capability of distributed energy resources (DERs). The limited short-circuit capability of DERs typically inhibits the use of reliable and affordable overcurrent protective devices in microgrids. Although extensive research on microgrid protection is available in the literature, to date this research has not led to a cost-effective, commercially available relay that effectively tackles the challenges of microgrid protection. This work proposes hardware modifications to enhance the current contribution of an energy storage inverter with the objective of enabling the use of legacy overcurrent protection for islanded microgrids. This paper demonstrates through experimental results that few modifications are required in the inverter to significantly enhance its current contribution. In this study, a three-phase energy storage inverter was modified to provide three times its rated current during three-phase faults, which proved sufficient current for enough time to enable fuse-relay, and relay-to-relay coordination. The proposed modifications effectively increase the current contribution of the inverter, which is a promising advancement to allow the adoption of overcurrent protective devices for protecting microgrids.

Ferrari Maglia, Max↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technical Learning and Integration of Interns in Advanced Protection Lab Space: Enhancements to Testbed and Experiments to Improve Workflows for Producing Datasets

This report presents a successful technical learning integration of student interns in the Advanced Protection Laboratory space, located in the Grid Research Integration and Deployment Center (GRID-C) at the Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL). The Advanced Protection Laboratory was created for the primary goal of supporting DOE’s research projects and technical staff at ORNL. As a secondary goal, the space was used for collaborating with ORNL’s intern programs, providing support to the lab’s mentors and student interns. In 2024, three student interns spent a summer in the Advanced Protection lab space and were involved in the DarkNet Distributed Ledger Technology (DLT) project. The students had a great opportunity to gain hands-on experience with communication and protective relay equipment focused on information technology, data analytics, and cybersecurity. Experiences in the lab space with real equipment and software integration offer education and professional development for students, which is especially important because of a need in the energy industry to recruit highly skilled power and communication engineers.

42 ENGINEERING↗

Intelligent Hierarchical Resilient Operation of Distribution Systems: Implementation and Validation in a Power Hardware-in-the-Loop Simulation Testbed

This paper reports on the structure of a power hardware-in-the-loop (PHIL) simulation testbed that implements, tests, and validates a novel AI-based hierarchical resilient operation model for distribution systems. The testbed implements the central and distributed controllers of the hierarchical resilient operation model and integrates a Digital Real-Time Simulator (DRTS), protective relays, a Real-Time Automation Controller (RTAC), a Software Defined Network (SDN) switch, and a battery energy storage (BES) system. The testbed provides comprehensive real-time visualization and monitoring capability as an advanced situational awareness and operator interface solution. The IEEE 33-node system is used as a test case to test and validate the operation of the model in normal operation and recovery operation after major outages in a fully automated fashion.

Ganjkhani, Mehdi↗

Use of Machine Learning on PMU Data for Transmission System Fault Analysis

Synchrophasor technology has been used for monitoring, control, and protection of bulk power system for over 10 years. Deployment of phasor measurement units (PMUs) in the USA power system has surpassed 3000 units installed in the transmission substations as stand-alone intelligent electronic devices (IEDs) or as a software add-on to other devices such as digital protective relays (DPRs) or digital fault recorders (DFRs). By now, thousands of terabytes of PMU data may have been captured and stored by various transmission system operators (TSOs) and independent system operators (ISOs). This creates an opportunity to deploy advanced machine learning (ML) techniques to detect and classify faults recorded by PMUs automatically to be used by the system operators for rapid, critical decision-making when manual analysis of the past or unfolding events is not feasible. In this paper we offer a brief background on how the automated fault analysis may be done using DPR and/or DFR data, and compare some of the legacy approaches to the new ML approaches in the context of the system-wide PMU recordings. We then offer insights from developing practical ML solutions that have been applied on field recordings captured by close to 450 PMUs from all three US interconnections (Western, Eastern and ERCOT) over two years (2016-2017). We identify and illustrate ML challenges we addressed: inaccurate data, data with scarce and temporally imprecise fault labels, data recorded by PMUs sparsely located at substations resulting in the fault records taken afar from the ends of the faulted lines, data containing only positive sequence values, and data taken at different voltage levels. We then illustrate the ML model results for fault analysis under different application scenarios. The novelty of this study is not only in the design, implementation, and performance analysis of the ML algorithms, but also in the use of advanced fault modelling and simulation approaches to improve the training results when developing supervised ML models for fault detection and classification. Extensive simulations of faults were conducted on a 14-bus power system to create a training dataset with over 1400 accurately labelled faults. This dataset was applied to enhance the accuracy of fault detection and classification of machine learning-based models trained with small number of labelled faults in large datasets recorded in the grid interconnections ranging from 5,000 to 70,000 buses.

Synchrophasors, Machine Learning, Fault Analysis, ↗