Potential Improvements to the Nuclear Safety and Launch Approval Process for Nuclear Reactors Utilized for Space Power and Propulsion Applications

This study examines potential improvements that could be made to the nuclear safety and launch approval process for fission reactors to reduce the associated uncertainties in cost and schedule while continuing to ensure public safety and environmental protection. It concentrates on the launch approval and mission safety of fission power and propulsion applications of nuclear energy. Improvements to the launch approval process for radioisotope power systems (RPSs) are being considered elsewhere but are acknowledged throughout the report. The study considered technical, process, and organizational improvements to the launch approval processes. The study exclusively evaluated reactors that would not be started up prior to achieving a “sufficiently high orbit,” per United Nations (UN) Resolution 47/68.Potential criticality accidents were considered that could occur during a launch failure or abort or during reentry. Numerous scenarios were examined that might involve one or more Earth flybys as well as potential transportation missions that could intentionally return an active, or previously active fission reactor to Earth orbit. The Study Group was guided in its deliberations according to a number of fundamental principles. These included the paramount importance of adequate and appropriate levels of public safety and environmental protection as well as the importance of the inclusion of independent scientific, engineering, and safety reviews of the applications and proposals as a critical part of the process. Also considered was the need for the development of launch approval processes that might be different, depending upon the source of the application for launch approval, whether it be derived as a governmental launch, a commercial launch, or a hybrid/combination of the two. It is clear that all launches of nuclear reactors into space should have similar safety requirements; however, the safety review effort and the details of the analysis that are required should be commensurate with the potential hazards and the actual risk, which may differ based on the reactor design and its intended purpose. Finally, the study aimed at ensuring that whatever processes and procedures are developed should maximize the sufficiency, simplicity, and transparency of the processes. The Study Group reached five Conclusions and makes thirteen Recommendations. The Conclusions and Recommendations presented here are extensions of those presented previously in other studies. This report attempts to add specificity to the actions that need to be taken in order to move forward with successful space fission reactor programs. Without action to address the perceived and real problems in the launch approval process, designers and mission managers will be reluctant to commit the resources necessary to make space fission reactors a reality.

Camp, Allen↗

RAT Requisition Approval Team - A L6S Initiative

L6S Project Description - Problem: The current cycle time for generating and approving Requisitions does not meet "Best-In-Class." . Scope: Only looking at the Florida Requisition Approval process for Orbiter (ORBF & ORBG) and Ground (GFAC) stocked items. This includes the time from when a requirement is generated by Logistics Planning and Supportability in Florida until it is approved and received by Procurement. Requisitions generated at other sites or for non stocked items will be out of scope of this Project

Hall, Valerie↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Airspace Technology Demonstration 2 project is investigating Integrated Arrival-Departure-Surface air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the areas under study are departure release-time approval request (APREQ) traffic management initiatives. Scheduling departures at downstream points and complying with approved departure release times helps flights fit smoothly into busy traffic streams. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations over fourteen months beginning in January 2018. It describes APREQ-compliance improvements observed as the electronic negotiation process has matured and discusses contributing factors, including renegotiation of departure release times.

Call for release↗

Departure Approval Request Compliance Effects on Overhead Stream Insertion

Integrated Arrival-Departure-Surface (IADS) air traffic management relies on information sharing and integration between automation systems for efficiency, predictability, and throughput improvements throughout the National Airspace System (NAS). The NASA Airspace Technology Demonstration 2 (ATD-2) project supports this effort by integrating SWIM (System Wide Information Management) information and evaluating and refining potential TFDM (Terminal Flight Data Manager) functionality in a surface traffic management system fielded at Charlotte-Douglas International Airport (CLT). Among the IADS areas under study during ATD-2 is the use of electronically negotiated departure times for efficiently inserting flights into overhead traffic streams. Stream-insertion accuracy is important for reducing excessive vectoring that negatively impacts the NAS by increasing controller workload along with aircraft fuel burn and emissions. Departure-time approval requests (APREQs) provide center-approved departure times to allow for smooth stream insertion. In this presentation, TBFM (Time-Based Flow Management) and ATD-2 flight summary data are used to empirically show that APREQ compliance leads to improved stream insertion.

Overhead-Stream Insertion↗

Obtaining NASA Approval for use of Non-Metallic Materials in Manned Space Flight

Material manufacturers and suppliers are often surprised when a material commonly provided to industry is not approved for use on manned spacecraft. Often the reason is a lack of test data in environments that simulate those encountered in space applications, especially oxygen-enriched conditions, which significantly increase both the likelihood of material combustion and the propagation of a fire. This paper introduces the requirements for flight approval of non-metallic materials, focusing on material testing for human-rated space flight programs; it reviews the history of flight materials requirements and provides the rationale for such and introduces specific requirements related to testing and to good material engineering and design practices. After describing the procedure for submitting materials to be tested, the paper outlines options available if a material fails testing. In addition, this treatise introduces the National Aeronautics and Space Administration's (NASA's) Materials and Processes Technical Information System (MAPTIS), a database housing all test data produced in accordance with NASA-STD-6001, Flammability, Odor, Offgassing, and Compatibility Requirements and Test Procedures for Materials in Environments that Support Combustion.

Davis, Samuel E.↗

Evolution of Electronic Approval Request Procedures at Charlotte Douglas International Airport

At many major U.S. airports, a departure approval request, or 'APREQ,' establishes a later runway departure time for a flight, allowing it to absorb tactical delay on the ground. APREQ times are traditionally coordinated by a process known as 'call-for-release' whereby an airport surface traffic manager calls an airspace traffic manager on the telephone. This research examines new electronic APREQ coordination enabled by the NASA Airspace Technology Demonstration-2 system and compares it to the call-for-release method of coordination. During the initial deployment period, electronic APREQ coordination was used for more than half of eligible flights. A majority of electronic requests were approved in less than one minute on average. Data suggest that both the average tactical delay and compliance with the electronically coordinated departure times did not differ significantly from departure times coordinated using call-for-release.

APREQ↗

Evolution of Electronic Approval Request Procedures at Charlotte Douglas International Airport

A departure approval request, or APREQ, establishes a later runway departure time for a flight, allowing it to absorb tactical delay on the ground. APREQ times are traditionally coordinated by a process known as "call-for-release" whereby an airport surface traffic manager calls an airspace traffic manager on the telephone. This research examines new electronic APREQ coordination enabled by the NASA Airspace Technology Demonstration-2 system and compares it to the traditional call-for-release method of coordination. During the initial deployment period, electronic APREQ coordination was used for more than half of eligible flights. A majority of electronic requests were approved in less than one minute on average. Both the average tactical delay and compliance with the electronically coordinated departure times did not differ significantly from departure times coordinated using call-for-release.

APREQ↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Air Traffic Management Demonstration 2 project is investigating Integrated Arrival-Departure-Surface (IADS) air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the IADS areas under study are departure release-time approval request (APREQ) traffic management initiatives. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations. It describes APREQ-compliance improvements observed as the ATD-2 electronic negotiation process has matured and discusses contributing factors.

call for release↗

STS safety approval process for small self-contained payloads

The safety approval process established by the National Aeronautics and Space Administration for Get Away Special (GAS) payloads is described. Although the designing organization is ultimately responsible for the safe operation of its payload, the Get Away Special team at the Goddard Space Flight Center will act as advisors while iterative safety analyses are performed and the Safety Data Package inputs are submitted. This four phase communications process will ultimately give NASA confidence that the GAS payload is safe, and successful completion of the Phase 3 package and review will clear the way for flight aboard the Space Transportation System orbiter.

Gum, Mary A.↗

A perspective on the FAA approval process: Integrating rotorcraft displays, controls and workload

The FAA is responsible for making the determination that a helicopter is safe for IFR operations in the National Airspace System (NAS). This involves objective and subjective evaluations of cockpit displays, flying qualities, procedures and human factors as they affect performance and workload. After all of the objective evaluations are completed, and all Federal Regulations have been met, FAA pilots make the final subjective judgement as to suitability for use by civil pilots in the NAS. The paper uses the flying qualities and pilot workload characteristics of a small helicopter to help examine the FAA pilot's involvement in this process. The result highlights the strengths of the process and its importance to the approval of new aircraft and equipments for civil IFR helicopter applications. The paper also identifies opportunities for improvement.

Green, David L.↗

Application of artificial intelligence (AI) concepts to the development of space flight parts approval model

A cost effective model which uses the artificial intelligence techniques in the selection and approval of parts is presented. The knowledge which is acquired from the specialists for different part types are represented in a knowledge base in the form of rules and objects. The parts information is stored separately in a data base and is isolated from the knowledge base. Validation, verification and performance issues are highlighted.

Krishnan, G. S.↗

Ground-Based Calibration Support for Two Approved HST Programs

This final report is a summary of the study on ground-based calibration support for two approved HST programs. A large set of new rotational periods for low mass stars in the Pleiades open cluster have been published and used to help interpret chromospheric and coronal activity indicators for low mass stars in the cluster. The Caltech/TJC/NASA Keck telescope in Hawaii has also been used to obtain spectra of brown dwarf candidates in the Pleiades. Those spectra help to derive an accurate and precise new age for that fiducial open cluster.

Stauffer, John R.↗

Key Decision Record Creation and Approval Module

Retaining good key decision records is critical to ensuring the success of a project or operation. Having adequately documented decisions with supporting documents and rationale can greatly reduce the amount of rework or reinvention over a project's, vehicle's, or facility's lifecycle. Stennis Space Center developed and uses a software tool that automates the Key Decision Record (KDR) process for its engineering and test projects. It provides the ability for a user to log key decisions that are made during the course of a project. By customizing Parametric Technology Corporation's (PTC) Windchill product, the team was able to log all information about a decision, and electronically route that information for approval. Customizing the Windchill product allowed the team to directly connect these decisions to the engineering data that it might affect and notify data owners of the decision. The user interface was created in JSP and Javascript, within the OOTB (Out of the Box) Windchill product, allowing users to create KDRs. Not only does this interface allow users to create and track KDRs, but it also plugs directly into the OOTB ability to associate these decision records with other relevant engineering data such as drawings, designs, models, requirements, or specifications

Hebert, Barrt↗

TASAR Certification and Operational Approval Requirements - Analyses and Results

This report documents the results of research and development work performed by Rockwell Collins in addressing the Task 1 objectives under NASA Contract NNL12AA11C. Under this contract Rockwell Collins provided analytical support to the NASA Langley Research Center (LaRC) in NASA's development of a Traffic Aware Strategic Aircrew Requests (TASAR) flight deck Electronic Flight Bag (EFB) application for technology transition into operational use. The two primary objectives of this contract were for Rockwell Collins and the University of Iowa OPL to 1) perform an implementation assessment of TASAR toward early certification and operational approval of TASAR as an EFB application (Task 1 of this contract), and 2) design, develop and conduct two Human-in-the-Loop (HITL) simulation experiments that evaluate TASAR and the associated Traffic Aware Planner (TAP) software application to determine the situational awareness and workload impacts of TASAR in the flight deck, while also assessing the level of comprehension, usefulness, and usability of the features of TAP (Task 2 of this contract). This report represents the Task 1 summary report. The Task 2 summary report is provided in [0].

Koczo, Stefan, Jr.↗

Increasing Efficiency of Fecal Coliform Testing Through EPA-Approved Alternate Method Colilert*-18

The 21 SM 9221 E multiple-tube fermentation method for fecal coliform analysis requires a large time and reagent investment for the performing laboratory. In late 2010, the EPA approved an alternative procedure for the determination of fecal coliforms designated as Colilert*-18. However, as of late 2016, only two VELAP-certified laboratories in the Commonwealth of Virginia have been certified in this method.

Cornwell, Brian↗

Evaluation of Approval Request 47; Call for Release Procedures for Charlotte Douglas International Airport

NASA is collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goals of the IADS capabilities in the ATD-2 project is to increase predictability and throughput of airspace operations by improving Traffic Management Initiative (TMI) compliance. This paper focuses on the Approval Request (APREQ) procedures developed for the ATD-2 project between the Air Traffic Control (ATC) Tower at Charlotte Douglas International Airport and Washington Center. In March 2017, NASA conducted a Human-in-the-Loop (HITL) simulation to evaluate the operational procedures and information requirements for the APREQ procedures in the ATD-2 IADS system between ATC Tower and Center. The findings from the HITL are used to compare ATD-2 APREQ procedures with information about current day APREQ procedures.

Stevens, Lindsay↗