Dynamic Arrival Routes: A Trajectory-Based Weather Avoidance System for Merging Arrivals and Metering

Convective weather can cause arrival traffic to fly less efficient weather avoidance routes and is the primary cause for time-based metering to be discontinued. Dynamic Arrival Routes (DAR) is a trajectory-based weather avoidance system that is designed to help improve arrival traffic flow when weather is present. The DAR system continuously analyzes airborne arrival flights for opportunities to reroute them to more efficient arrival routes or around weather that is predicted to be on their current flight plan early enough to allow the arrival time-based metering system to adjust its times of arrival for the presence of weather. Analysis of 93 hours of actual traffic over 12 different days from Fort Worth Center showed DAR proposed more efficient arrival reroutes for 352 arrival flights for an average time savings of 12.3 minutes per flight at a look-ahead time of 60 minutes from the meter fix. DAR also identified 642 arrival flights with a need to deviate around weather and proposed weather avoidance routes that were analytically shown to remain weather-free 83 percent of the time for a look-ahead time of 30 minutes from the meter fix.

Arrivals↗

An Exploratory Study of Runway Arrival Procedures: Time Based Arrival and Self-Spacing

The ability of a flight crew to deliver their aircraft to its arrival runway on time is important to the overall efficiency of the National Airspace System (NAS). Over the past several years, the NAS has been stressed almost to its limits resulting in problems such as airport congestion, flight delay, and flight cancellation to reach levels that have never been seen before in the NAS. It is predicted that this situation will worsen by the year 2025, due to an anticipated increase in air traffic operations to one-and-a-half to three times its current level. Improved arrival efficiency, in terms of both capacity and environmental impact, is an important part of improving NAS operations. One way to improve the arrival performance of an aircraft is to enable the flight crew to precisely deliver their aircraft to a specified point at either a specified time or specified interval relative to another aircraft. This gives the flight crew more control to make the necessary adjustments to their aircraft s performance with less tactical control from the controller; it may also decrease the controller s workload. Two approaches to precise time navigation have been proposed: Time-Based Arrivals (e.g., required times of arrival) and Self-Spacing. Time-Based Arrivals make use of an aircraft s Flight Management System (FMS) to deliver the aircraft to the runway threshold at a given time. Self-Spacing enables the flight crew to achieve an ATC assigned spacing goals at the runway threshold relative to another aircraft. The Joint Planning and Development Office (JPDO), a multi-agency initiative established to plan and coordinate the development of the Next Generation Air Transportation System (NextGen), has asked for data for both of these concepts to facilitate future research and development. This paper provides a first look at the delivery performance of these two concepts under various initial and environmental conditions in an air traffic simulation environment.

Houston, Vincent E.↗

Required Time of Arrival as a Control Mechanism to Mitigate Uncertainty in Arrival Traffic Demand Management

The objective of this study is to explore the use of Required Time of Arrival (RTA) capability on the flight deck as a control mechanism on arrival traffic management to improve traffic delivery accuracy by mitigating the effect of traffic demand uncertainty. The uncertainties are caused by various factors, such as departure error due to the difference between scheduled departure and the actual take-off time. A simulation study was conducted using the Multi Aircraft Control System (MACS) software, a comprehensive research platform developed in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center. The Crossing Time (CT) performance (i.e. the difference between target crossing time and actual crossing time) of the RTA for uncertainty mitigation during cruise phase was evaluated under the influence of varying two main factors: wind severity (heavy wind vs. mild wind), and wind error (1 hour, 2 hours, and 5 hours wind forecast errors). To examine the CT performance improvement made by the RTA, the comparison to the CT of the aircraft that were not assigned with RTA (Non-RTA) under the influence of the selected factors was also made. The Newark Liberty International Airport (EWR) was chosen for this study. A total 66 inbound traffic to the EWR (34 of them were airborne when the simulation was initiated, 32 were pre-departures at that time) was simulated, where the pre-scripted departure error was assigned to each pre-departure (61 conform to their Expected Departure Clearance Time, which is +-300 seconds of their scheduled departure time). The results of the study show that the delivery accuracy improvement can be achieved by assigning RTA, regardless of the influence of the selected two factors (the wind severity and the wind information inaccuracy). Across all wind variances, 66.9 (265 out of 396) of the CT performance of the RTA assigned aircraft was within +- 60 seconds (i.e. target tolerance range) and 88.9 (352 out of 396) aircraft met +-300 seconds marginal tolerance range, while only 33.6 (133 out of 396) of the Non-RTA assigned aircrafts CT performance achieved the target tolerance range and 75.5 (299 out of 396) stayed within the marginal. Examination of the impact of different error sources i.e. departure error, wind severity, and wind error suggest that although large departure errors can significantly impact the CT performance, the impacts of wind severity and errors were modest relative the targeted +- 60 second conformance range.

required time of arrival (RTA)↗

A Fast-Time Study of Aircraft Reordering in Arrival Sequencing and Scheduling

In order to ensure that the safe capacity of the terminal area is not exceeded, Air Traffic Management ATM often places restrictions on arriving flights transitioning from en route airspace to terminal airspace. This restriction of arrival traffic is commonly referred to as arrival flow management, and includes techniques such as metering, vectoring, fix-load balancing, and the imposition of miles-in-trail separations. These restrictions are enacted without regard for the relative priority which airlines may be placing on individual flights based on factors such as crew criticality, passenger connectivity, critical turn times, gate availability, on-time performance, fuel status, or runway preference. The development of new arrival flow management techniques which take into consideration priorities expressed by air carriers will likely reduce the economic impact of ATM restrictions on the airlines and lead to increased airline economic efficiency by allowing airlines to have greater control over their individual arrival banks of aircraft. NASA and the Federal Aviation Administration (FAA) have designed and developed a suite of software decision support tools (DSTs) collectively known as the Center TRACON Automation System (CTAS). One of these tools, the Traffic Management Advisor (TMA) is currently being used at the Fort Worth Air Route Traffic Control Center to perform arrival flow management of traffic into the Dallas/Fort Worth airport (DFW). The TMA is a time-based strategic planning tool that assists Traffic Management Coordinators (TMCs) and En Route Air Traffic Controllers in efficiently balancing arrival demand with airport capacity. The primary algorithm in the TMA is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 no a. from touchdown. This scheduler will sequence aircraft so that they arrive in a first- come - first-served (FCFS) order. While FCFS sequencing establishes a fair order based on estimated times of arrival, it does not take into account individual airline priorities among incoming flights. NASA is exploring the possibility of allowing airlines to express relative arrival priorities to air traffic management through the development of new CTAS scheduling algorithms which take into consideration airline arrival preferences. The accommodation of airline priorities in arrival sequencing and scheduling would under most circumstances result in a deviation from a "natural" or FCFS arrival order. As a First step toward developing airline influenced sequencing algorithms, an investigation was conducted to determine the feasibility of reordering arrival traffic from a strict FCFS sequence. A fast-time simulation has been developed which allows statistical evaluation of sequencing and scheduling algorithms for arrival traffic at the Dallas/Fort Worth Airport. In contrast to real-time simulation or field tests, which would require on the order of ninety minutes to examine a single traffic rush period, the fast-time simulation allows examination of multiple rush periods in a matter of seconds.

Carr, Greg↗

Prediction of Weather Impacts on Airport Arrival Meter Fix Capacity

This paper introduces a data driven model for predicting airport arrival capacity with a look-ahead time 2-8 hour forecast. The model is suitable for air traffic flow management by explicitly investigating the impact of convective weather on airport arrival meter fix throughput. Estimation of the arrival airport capacity under arrival meter fix flow constraints due to severe weather is an important part of Air Traffic Management (ATM). Airport arrival capacity can be reduced if one or more airport arrival meter fixes are partially or completely blocked by convective weather. When the predicted airport arrival demands exceed the predicted available airport's arrival capacity for a sustained period, Ground Delay Program (GDP) operations will be triggered by ATM system. Serious imbalances between demand and capacity occur most frequently when the airport capacity is severely degraded due to either bad airport terminal surface weather or inclement convective weather around airport arrival fixes. A model that predicts the weather-impacted airport arrival meter fix throughput may help ATM personnel to plan GDP operations more efficiently. This paper identifies the characteristics of air traffic flow across arrival meter fixes at Newark Liberty International Airport (EWR). The proposed approach, based on machine-learning methods, is developed to predict the weather impacted EWR arrival Meter Fix (MF) throughput. Sector forecast coverage is used to envision the weather impact on airport arrival MF flow, and the validation is accomplished by using Convective Weather Avoidance Model (CWAM) 0.5 to 2-hour and Collaborative Convective Forecast Product (CCFP) 4 to 8-hour look-ahead forecast data for the period of April-September in 2014. Furthermore, the regression tree ensemble learning of random forests approach for translating a sector forecast coverage model to an EWR arrival meter fix throughput model is examined. The results suggest that ATM decision makers in charge of MF flow control and GDP planning may benefit from adopting the airport arrival meter capacity prediction models to estimate the inclement weather impacts.

Wang, Yao X.↗

Weather Impact on Airport Arrival Meter Fix Throughput

Time-based flow management provides arrival aircraft schedules based on arrival airport conditions, airport capacity, required spacing, and weather conditions. In order to meet a scheduled time at which arrival aircraft can cross an airport arrival meter fix prior to entering the airport terminal airspace, air traffic controllers make regulations on air traffic. Severe weather may create an airport arrival bottleneck if one or more of airport arrival meter fixes are partially or completely blocked by the weather and the arrival demand has not been reduced accordingly. Under these conditions, aircraft are frequently being put in holding patterns until they can be rerouted. A model that predicts the weather impacted meter fix throughput may help air traffic controllers direct arrival flows into the airport more efficiently, minimizing arrival meter fix congestion. This paper presents an analysis of air traffic flows across arrival meter fixes at the Newark Liberty International Airport (EWR). Several scenarios of weather impacted EWR arrival fix flows are described. Furthermore, multiple linear regression and regression tree ensemble learning approaches for translating multiple sector Weather Impacted Traffic Indexes (WITI) to EWR arrival meter fix throughputs are examined. These weather translation models are developed and validated using the EWR arrival flight and weather data for the period of April-September in 2014. This study also compares the performance of the regression tree ensemble with traditional multiple linear regression models for estimating the weather impacted throughputs at each of the EWR arrival meter fixes. For all meter fixes investigated, the results from the regression tree ensemble weather translation models show a stronger correlation between model outputs and observed meter fix throughputs than that produced from multiple linear regression method.

Machine Learning Model.↗

A Human-in-the Loop Evaluation of a Coordinated Arrival Departure Scheduling Operations for Managing Departure Delays at LaGuardia Airport

LaGuardia (LGA) departure delay was identified by the stakeholders and subject matter experts as a significant bottleneck in the New York metropolitan area. Departure delay at LGA is primarily due to dependency between LGA's arrival and departure runways: LGA departures cannot begin takeoff until arrivals have cleared the runway intersection. If one-in one-out operations are not maintained and a significant arrival-to-departure imbalance occurs, the departure backup can persist through the rest of the day. At NASA Ames Research Center, a solution called "Departure-sensitive Arrival Spacing" (DSAS) was developed to maximize the departure throughput without creating significant delays in the arrival traffic. The concept leverages a Terminal Sequencing and Spacing (TSS) operations that create and manage the arrival schedule to the runway threshold and added an interface enhancement to the traffic manager's timeline to provide the ability to manually adjust inter-arrival spacing to build precise gaps for multiple departures between arrivals. A more complete solution would include a TSS algorithm enhancement that could automatically build these multi-departure gaps. With this set of capabilities, inter-arrival spacing could be controlled for optimal departure throughput. The concept was prototyped in a human-in-the- loop (HITL) simulation environment so that operational requirements such as coordination procedures, timing and magnitude of TSS schedule adjustments, and display features for Tower, TRACON and Traffic Management Unit could be determined. A HITL simulation was conducted in August 2014 to evaluate the concept in terms of feasibility, controller workload impact, and potential benefits. Three conditions were tested, namely a Baseline condition without scheduling, TSS condition that schedules the arrivals to the runway threshold, and TSS+DSAS condition that adjusts the arrival schedule to maximize the departure throughput. The results showed that during high arrival demand period, departure throughput could be incrementally increased under TSS and TSS+DSAS conditions without compromising the arrival throughput. The concept, operational procedures, and summary results were originally published in ATM20151 but detailed results were omitted. This paper expands on the earlier paper to provide the detailed results on throughput, conformance, safety, flight time/distance, etc. that provide extra insights into the feasibility and the potential benefits on the concept.

trajectory-based operations↗

Validation of an Automated System for Arrival Traffic Management

The fuel-efficiencies of arrival flights that were managed by an automated system were compared to the fuel-efficiencies of arrival flights that were managed by air traffic controllers. It was infeasible to have the automated system control arrivals in real operations, so the comparison was accomplished by setting up a fast-time simulation where the automated system could manage arrivals with the same initial conditions and flight plans as those that operated in real operations during a selected comparison period and in the same background traffic. For this study, Newark Liberty International Airport was selected as the arrival airport because its high traffic load and constrained arrival procedures were expected to highlight fuel-efficiency benefits of an automated system. In the simulation, the automated system managed Newark arrivals, and the other flights (arrivals to other airports, departures, and overflights) composed the background traffic. To match the simulation and the real operations background traffic, the other flights flew in simulation the same trajectory that they flew in real operations during the comparison period. Fuel-efficiency was measured by calculating fuel burns of the arrival trajectories. The fuel-efficiencies of arrival trajectories produced in the simulation were compared with the estimated fuel-efficiencies of arrival trajectories recorded from real operations during the comparison period. Results showed that automation managed arrivals burned 346 lbs less fuel per flight on average than controller managed arrivals.

air traffic control↗

Validation of an Automated System for Arrival Traffic Management

The fuel-efficiencies of arrival flights that were managed by an automated system were compared to the fuel-efficiencies of arrival flights that were managed by air traffic controllers. It was infeasible to have the automated system control arrivals in real operations, so the comparison was accomplished by setting up a fast-time simulation where the automated system could manage arrivals with the same initial conditions and flight plans as those that operated in real operations during a selected comparison period and in the same background traffic. For this study, Newark Liberty International Airport was selected as the arrival airport because its high traffic load and constrained arrival procedures were expected to highlight fuel-efficiency benefits of an automated system. In the simulation, the automated system managed Newark arrivals, and the other flights (arrivals to other airports, departures, and overflights) composed the background traffic. To match the simulation and the real operations background traffic, the other flights flew in simulation the same trajectory that they flew in real operations during the comparison period. Fuel-efficiency was measured by calculating fuel burns of the arrival trajectories. The fuel-efficiencies of arrival trajectories produced in the simulation were compared with the estimated fuel-efficiencies of arrival trajectories recorded from real operations during the comparison period. Results showed that automation managed arrivals burned 346 lbs less fuel per flight on average than controller managed arrivals.

air traffic control↗

Collaborative Arrival Planning: Data Sharing and User Preference Tools

Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.

Zelenka, Richard E.↗

Exploring Management of Arrival Spacing Using Route Extensions with Terminal Spacing Tools

Airports with shared runway operations between arrivals and departures can experience severe departure gridlock and delays during a heavy arrival push due to insufficient gaps in the arrival stream for aircraft to depart. The problem is accentuated in situations when a large gap in the arrival spacing has to be created at the last minute due to wake vortex separation requirements. At LaGuardia airport, wake vortex separation problems arise when a heavy jet, such as a B757, departing on Runway 31 needs additional spacing between arrivals on Runway 22. A standard solution for controllers in many airports in situations such as this is to extend the downwind leg of arrival aircraft to create extra space between the arrivals. The question addressed in this paper is how such route extensions would work with terminal scheduling operations, namely (1) the automated Terminal Sequencing and Spacing (TSS) tools and (2) a new scheduling tool which increases the availability of gaps for departure aircraft (Departure Sensitive Arrival Spacing or DSAS). In a simulated LaGuardia airport (LGA) Terminal Radar Approach Control (TRACON) airspace, two new RNAV arrival routes were created along with extensions to these routes. The arrival route from the south had a downwind leg extension near the airport in the final sector. The arrival route from the north had an extension in a feeder sector further from the airport. An exploratory one-hour run with the route extensions was compared to an hour run without the extensions. Topics included in the paper are 1) how the route extensions were developed, 2) a procedure outlining how the aircraft could be scheduled to the extensions and who would do it, and 3) the results of the exploratory run compared to the original run without the extensions. The results indicated that the extended downwind leg route helped to create a B757 departure gap in the middle of a packed arrival stream, resulting in a reduction of 11 minutes in average wait time for the B757s, but at a cost of increased controller self-reported workload from low to moderate.

time based flow management↗

Airspace Technology Demonstration 3 (ATD-3): Dynamic Routes for Arrivals in Weather (DRAW) Technology Transfer Document Summary Version 2.0

Airspace Technology Demonstration – 3 (ATD-3) is part of NASA’s Airspace Operations and Safety Program (AOSP) – specifically, its Airspace Technology Demonstrations (ATD) Project. ATD-3 is a multi-year research and development effort which proposes to develop and demonstrate automation technologies and operating concepts that enable air navigation service providers and airspace users to continuously assess weather, winds, traffic, and other information to identify, evaluate, and implement workable opportunities for flight plan route corrections that can result in significant flight time and fuel savings in en route airspace. In order to ensure that the products of this tech-transfer are relevant and useful, NASA has created strong partnerships with the FAA and key industry stakeholders. This summary document and accompanying technology artifacts satisfy the third Research Transition Product (RTP) defined in the Applied Traffic Flow Management (ATFM) Research Transition Team (RTT) Plan, which is Dynamic Routes for Arrivals in Weather (DRAW). This technology transfer consists of artifacts for DRAW Arrival Metering (AM) Operations delivered in June 2018, DRAW AM updates, and DRAW Extended Metering (XM) Operations. Blue highlighting indicates the new or modified deliverables. Some of the artifacts in this technology transfer have distribution restrictions that need to be followed. Distribution information is noted in each section. DRAW is a trajectory-based system that combines the legacy Dynamic Weather Routes (DWR) weather avoidance technology with an arrival-specific rerouting algorithm and arrival scheduler to improve traffic flows on weather-impacted arrival routes into major airports. First, DRAW identifies flights that could be rerouted to more efficient Standard Terminal Arrival Routes (STARs) that may have previously been impacted by weather. Second, when weather is impacting the arrival routing, DRAW proposes simple arrival route corrections that enable aircraft to stay on their flight plan while avoiding weather. The DRAW system proposes reroutes early enough to allow Time Based Flow Management (TBFM) to make the necessary schedule adjustments. As a result, metering operations can be sustained longer and more consistently in the presence of weather because the arrival schedule accounts for the dynamic routing intent of arrival flights to deviate around weather. The first DRAW tech transfer in June 2018 focused on arrival metering operations with the DRAW algorithm implemented in the NASA Center TRACON Automation System (CTAS) automation software. This tech transfer delivery includes updates for DRAW implemented in FAA’s TBFM 4.7 automation software and preliminary research into DRAW for XM operations.

Isaacson, Douglas R.↗

Scheduling and Separating Departures Crossing Arrival Flows in Shared Airspace

Flight efficiency and reduction of flight delays are among the primary goals of NextGen. In this paper, we propose a concept of shared airspace where departures fly across arrival flows, provided gaps are available in these flows. We have explored solutions to separate departures temporally from arrival traffic and pre-arranged procedures to support controllers' decisions. We conducted a Human-in-the-Loop simulation and assessed the efficiency and safety of 96 departures from the San Jose airport (SJC) climbing across the arrival airspace of the Oakland and San Francisco arrival flows. In our simulation, the SJC tower had a tool to schedule departures to fly across predicted gaps in the arrival flow. When departures were mistimed and separation could not be ensured, a safe but less efficient route was provided to the departures to fly under the arrival flows. A coordination using a point-out procedure allowed the arrival controller to control the SJC departures right after takeoff. We manipulated the accuracy of departure time (accurate vs. inaccurate) as well as which sector took control of the departures after takeoff (departure vs. arrival sector) in a 2x2 full factorial plan. Results show that coordination time decreased and climb efficiency increased when the arrival sector controlled the aircraft right after takeoff. Also, climb efficiency increased when the departure times were more accurate. Coordination was shown to be a critical component of tactical operations in shared airspace. Although workload, coordination, and safety were judged by controllers as acceptable in the simulation, it appears that in the field, controllers would need improved tools and coordination procedures to support this procedure.

shared airspace↗

Laboratory Evaluation of Dynamic Routing of Air Traffic in an En Route Arrival Metering Environment

Arrival air traffic operations in the presence of convective weather are subject to uncertainty in aircraft routing and subsequently in flight trajectory predictability. Current management of arrival operations in weather-impacted airspace results in significant flight delay and suspension of arrival metering operations. The Dynamic Routing for Arrivals in Weather (DRAW) concept provides flight route amendment advisories to Traffic Management Coordinators to mitigate the impacts of convective weather on arrival operations. DRAW provides both weather conflict and schedule information for proposed route amendments, allowing air traffic managers to simultaneously evaluate weather avoidance routing and potential schedule and delay impacts. Subject matter experts consisting of retired Traffic Management Coordinators and retired Sector Controllers with arrival metering experience participated in a simulation study of Fort Worth Air Route Traffic Control Center arrival operations. Data were collected for Traffic Management Coordinator and Sector Controller participants over three weeks of simulation activities in October, 2017. Traffic Management Coordinators reported acceptable workload levels, a positive impact on their ability to manage arrival traffic while using DRAW, and initiated weather mitigation reroutes earlier while using DRAW. Sector Controllers also reported acceptable workload levels while using DRAW.

Air Traffic Management↗

Laboratory Evaluation of Dynamic Routing of Air Traffic in an En Route Arrival Metering Environment

Arrival air traffic operations in the presence of convective weather are subject to uncertainty in aircraft routing and subsequently in flight trajectory predictability. Current management of arrival operations in weather-impacted airspace results in significant flight delay and suspension of arrival metering operations. The Dynamic Routing for Arrivals in Weather (DRAW) concept provides flight route amendment advisories to Traffic Management Coordinators to mitigate the impacts of convective weather on arrival operations. DRAW provides both weather conflict and schedule information for proposed route amendments, allowing air traffic managers to simultaneously evaluate weather avoidance routing and potential schedule and delay impacts. Subject matter experts consisting of retired Traffic Management Coordinators and retired Sector Controllers with arrival metering experience participated in a simulation study of Fort Worth Air Route Traffic Control Center arrival operations. Data were collected for Traffic Management Coordinator and Sector Controller participants over three weeks of simulation activities in October, 2017. Traffic Management Coordinators reported acceptable workload levels, a positive impact on their ability to manage arrival traffic while using DRAW, and initiated weather mitigation reroutes earlier while using DRAW. Sector Controllers also reported acceptable workload levels while using DRAW.

Air Traffic Management↗

TRACON Aircraft Arrival Planning and Optimization Through Spatial Constraint Satisfaction

A new aircraft arrival planning and optimization algorithm has been incorporated into the Final Approach Spacing Tool (FAST) in the Center-TRACON Automation System (CTAS) developed at NASA-Ames Research Center. FAST simulations have been conducted over three years involving full-proficiency, level five air traffic controllers from around the United States. From these simulations an algorithm, called Spatial Constraint Satisfaction, has been designed, coded, undergone testing, and soon will begin field evaluation at the Dallas-Fort Worth and Denver International airport facilities. The purpose of this new design is an attempt to show that the generation of efficient and conflict free aircraft arrival plans at the runway does not guarantee an operationally acceptable arrival plan upstream from the runway -information encompassing the entire arrival airspace must be used in order to create an acceptable aircraft arrival plan. This new design includes functions available previously but additionally includes necessary representations of controller preferences and workload, operationally required amounts of extra separation, and integrates aircraft conflict resolution. As a result, the Spatial Constraint Satisfaction algorithm produces an optimized aircraft arrival plan that is more acceptable in terms of arrival procedures and air traffic controller workload. This paper discusses the current Air Traffic Control arrival planning procedures, previous work in this field, the design of the Spatial Constraint Satisfaction algorithm, and the results of recent evaluations of the algorithm.

Bergh, Christopher P.↗

Improvement to Airport Throughput Using Intelligent Arrival Scheduling and an Expanded Planning Horizon

The first phase of this study investigated the amount of time a flight can be delayed or expedited within the Terminal Airspace using only speed changes. The Arrival Capacity Calculator analysis tool was used to predict the time adjustment envelope for standard descent arrivals and then for CDA arrivals. Results ranged from 0.77 to 5.38 minutes. STAR routes were configured for the ACES simulation, and a validation of the ACC results was conducted comparing the maximum predicted time adjustments to those seen in ACES. The final phase investigated full runway-to-runway trajectories using ACES. The radial distance used by the arrival scheduler was incrementally increased from 50 to 150 nautical miles (nmi). The increased Planning Horizon radii allowed the arrival scheduler to arrange, path stretch, and speed-adjust flights to more fully load the arrival stream. The average throughput for the high volume portion of the day increased from 30 aircraft per runway for the 50 nmi radius to 40 aircraft per runway for the 150 nmi radius for a traffic set representative of high volume 2018. The recommended radius for the arrival scheduler s Planning Horizon was found to be 130 nmi, which allowed more than 95% loading of the arrival stream.

Glaab, Patricia C.↗