Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

AGR-3/4 Compact 1-4 Examination Plan

This plan describes the post irradiation examination (PIE) activities to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compact 1-4 taken from the Advanced Gas Reactor (AGR) experiment, AGR-3/4. This work will be performed in accordance with the general objectives outlined in the AGR 3/4 PIE Plan and guidance in the ORNL PIE Statement of Work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Destructive PIE and Safety Testing of Six AGR-5/6/7 Capsule 2 Compacts

This study evaluates fission product retention and particle failure mechanisms in AGR-5/6/7 Capsule 2 uranium carbide and uranium oxide (UCO) tristructural isotropic (TRISO) fuel under high-temperature gas reactor accident-relevant conditions using high-temperature safety tests and destructive postirradiation examination. Three Capsule 2 compacts were held isothermally at 1600°C for approximately 300 hours and one compact at 1800°C for approximately 300 hours; two additional compacts were examined in the as-irradiated state. Post-test deconsolidation–leach–burn–leach (DLBL) quantified nuclide inventories in matrix and particles. Individual particles were surveyed for radioisotope inventories, and microanalytical approaches resolved microstructural evolution and fission product distributions within the coating layers. At 1600°C, no krypton was detected above the minimum detectable limit, and cesium releases were far below a single particle equivalent, indicating the absence of full TRISO failure or SiC failures. Silver releases were limited and primarily reflected depleted postirradiation inventories, consistent with prior compact-level exams indicating substantial in-pile 110mAg loss. At 1800°C, cumulative 134Cs release of approximately 2.5 particle equivalents and delayed 85Kr totaling approximately 0.53 particle equivalents were consistent with one full TRISO failure and two SiC failures. Europium and strontium releases were roughly one order of magnitude higher than at 1600°C and comparable to AGR-1/AGR-2 high-temperature tests, with sustained late-hold rates indicating diffusion through intact coatings coupled with matrix depletion. Overall, AGR-5/6/7 Capsule 2 UCO fuel demonstrated fission product retention during safety testing consistent with prior AGR campaigns, while distinctive in-pile 110mAg depletion and measurable 1600°C europium loss motivate targeted follow-on studies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Destructive PIE and Safety Testing of Six AGR-5/6/7 Capsule 2 Compacts

This study evaluates fission product retention and particle failure mechanisms in AGR-5/6/7 Capsule 2 uranium carbide and uranium oxide (UCO) tristructural isotropic (TRISO) fuel under high-temperature gas reactor accident-relevant conditions using high-temperature safety tests and destructive post-irradiation examination. Three Capsule 2 compacts were held isothermally at 1600°C for approximately 300 hours and one compact at 1800°C for approximately 300 hours; two additional compacts were examined in the as-irradiated state. Post-test deconsolidation–leach–burn–leach (DLBL) quantified nuclide inventories in matrix and particles. Individual particles were surveyed for radioisotope inventories, and microanalytical approaches resolved microstructural evolution and fission product distributions within the coating layers. At 1600°C, no krypton was detected above the minimum detectable limit, and cesium releases were far below a single particle equivalent, indicating the absence of full TRISO failure or SiC failures. Silver releases were limited and primarily reflected depleted post-irradiation inventories, consistent with prior compact-level exams indicating substantial in-pile 110m Ag loss. At 1800°C, cumulative 134 Cs release of approximately 2.5 particle equivalents and delayed 85 Kr totaling approximately 0.53 particle equivalents were consistent with one full TRISO failure and two SiC failures. Europium and strontium releases were roughly one order of magnitude higher than at 1600°C and comparable to AGR-1/AGR-2 high-temperature tests, with sustained late-hold rates indicating diffusion through intact coatings coupled with matrix depletion. Overall, AGR-5/6/7 Capsule 2 UCO fuel demonstrated fission product retention during safety testing consistent with prior AGR campaigns, while distinctive in-pile 110m Ag depletion and measurable 1600°C europium loss motivate targeted follow-on studies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗