Search NASA⌕ Search

SEARCH · Search NASA

Results for “automation GPS data processing orbit determination TOPEX/Poseidon”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Automated Precision Orbit Determination for TOPEX/Poseidon with GPS

A highly automated GPS data processing system for the orbit determination of TOPEX/Poseidon is described. The orbit is recovered to an estimated accuracy of better than 4 cm in altitude, 6 cm crosstrack, and 11 cm down track. The RMS postfit residuals on the ionospherically calibrated carrier phase observable are less than 5 mm. The RMS difference over a 4.5-hour overlap period between two 30-hour data arcs is 1 cm in altitude, 5 cm cross track, and 4 cm down track. These results can be obtained within two days of onboard GPS data collection. Most of the data processing for a 30-hour arc of GPS data can be performed on a single workstation in less than 6 hours of CPU time. The estimation scenarios are explained, the automated data processing steps are described, and means to assess solution quality are discussed.

automation GPS data processing orbit determination↗

Results of an Automated GPS Tracking System in Support of Topex/Poseidon and GPSMet

A fully automated near real-time GPS tracking system has been developed around JPL's GIPSY/OASIS II software. The system produces <25 cm (3D rms) GPS orbits and one-half nanosecond (15 cm) clock estimates. The process starts automatically when a favorable global distribution of ground data from the IGS network (International GPS Service for Geodynamics) becomes available. Ionospherically corrected phase and pseudorange data are optimally combined to remove satellite and ground receiver clock errors, including selective availability. After the GPS orbits are determined within the data arc, they are then propagated with empirically determined dynamic force models. Real-time <2 meter (3D rms) GPS orbits are always available. As a by-product of this process, other calibration estimates such as station clocks, troposphere estimates, and Earth orientation parameters are also produced. For daily arc fits, the process requires 7-8 hours of CPU time on an HP9000/735 workstation.

GPS↗