Search NASA⌕ Search

SEARCH · Search NASA

Results for “bankability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Solar Bankability Data to Advance Transactions and Access (SB-DATA) Final Technical Report

The DOE project “Solar Bankability Data to Advance Transactions and Access”, known in the solar industry and referred to in this report as “Orange Button”, had project objectives of convening key stakeholder participants in the solar project lifecycle to develop a data taxonomy that meets to the solar industry’s needs for standardized data types for use in solar projects. Additional Orange Button deliverables included the development of an online data exchange to act as a clearinghouse of data that conformed to the data standard and additional solar industry data, and a Solar Data Translation Platform that could transform legacy solar project data to conform to the Orange Button data standard. All of these objectives were achieved. The Smart Electric Power Alliance (SEPA) provided program management, industry participant recruiting and convening, worked with the solar industry to define the scope of the Orange Button data taxonomy, and documented and delivered the taxonomy data requirements to funded project partners to develop both the taxonomy and the data conversion tools. Further efforts included performing extensive industry outreach and awareness to encourage adoption of the Orange Button taxonomy by the solar industry by enumerating the cost saving benefits of using the taxonomy and the public benefit of the increased use of solar energy due to increased bankability and viability of solar development projects. Solar PV panel and component prices have fallen in the last decade, while soft costs have remained stubbornly high and can account for as much as 64% of the total cost of a new solar system. Part of the U.S. Department of Energy SunShot Initiative, Orange Button enabled the creation and adoption of industry-led open data standards for rapid and seamless information exchange across the solar value chain, from origination to decommissioning. Standardizing data will reduce soft costs by making it easier to share solar data and speeding up processes. The taxonomy is a product of solar industry participants convening to identify the pain points caused by incompatible data, and to agree on and standardize data types to be used by the actors in the solar project lifecycle. This report focuses on the SEPA led first phase of Orange Button project that included industry outreach and recruiting participants for five industry working groups, widespread industry outreach to increase awareness and encourage eventual adoption of the taxonomy, and the definition of the scope, use cases, and supporting data types of the Orange Button taxonomy. The solar industry has been receptive of the completed Orange Button taxonomy. In SEPA’s work, 401 solar industry participants facilitated by SEPA defined the scope, use cases, and requirements for the taxonomy leading to over 150 taxonomy early adopters incorporating the taxonomy into their software products serving the solar industry, and several large investors and banks have started projects to enable them to utilize the taxonomy to gain back-office efficiencies. Moving forward, as the solar industry more widely embraces the Orange Button taxonomy and begins realizing the tangible benefits of adoption at scale, we expect further pressure on solar soft costs and increases in the bankability of solar projects.

14 SOLAR ENERGY↗

PV Validation and Bankability Workshop: San Jose, California

This report is a collaboration between Sandia National Laboratories, the National Renewable Energy Laboratory, and the Florida Solar Energy Center (FSEC). The report provides feedback from the U.S. Department of Energy's (DOE) Solar Program PV Validation and Bankability Workshop in San Jose, California on August 31, 2011. It focuses on the current state of PV in the United States, private fundingto fund U.S. PV industry growth, roles and functions of the regional test center program, and ways to improve the current validation and bankability practices.

14 SOLAR ENERGY↗

Streamlining the Bankability Process using International Standards

NREL has supported the international efforts to create a streamlined process for documenting bankability and/or completion of each step of a PV project plan. IECRE was created for this purpose in 2014. This poster describes the goals, current status of this effort, and how individuals and companies can become involved.

14 SOLAR ENERGY↗

Approaches to Demonstrating Bankability and Differentiating Product Quality (Presentation)

As the PV Industry has matured, there is increasing interest in quantifying higher quality so that customers may select products that meet their needs, and investors are demanding high confidence before committing millions of dollars. The community is developing the knowledge and standard methods needed to address these. This talk will give an overview of new developments in the last year including descriptions and status of Qualification Plus (a test protocol that goes beyond the standard qualification tests), a PV-specific version of ISO 9001 (for increased confidence in manufacturing consistency), and the Regional Test Centers (where new products can be tested to quantify performance and durability in multiple climate zones.) Development of PV system-level certification will also be described.

14 SOLAR ENERGY↗

Defining Bankability for Each Step of a PV Project Using IECRE

How can a PV customer know whether a PV plant is 'good'? IECRE was created to provide a cost-effective way to identify 'good' PV plants. This presentation describes the motivation, strategy, and status of the IECRE effort as of July, 2016.

14 SOLAR ENERGY↗

Expert Connections Empower Bankable Solar Projects

The International Solar Alliance (ISA) formed in 2015 to serve as a collaborative platform for increasing solar energy technology deployment worldwide. Currently, the ISA includes more than 65 signatory countries that are working with global partners to improve their access to affordable and reliable clean energy. In support of ISA member countries, the U.S. Department of Energy and the Australian Government's Department of Environment and Energy selected the Clean Energy Solutions Center (Solutions Center) to help mobilize private investment in solar technologies associated with this global effort. The Solutions Center is partnering with ISA selected partners to provide a range of technical assistance services, training programs, and other capacity building resources. The U.S. Department of Energy's National Renewable Energy Laboratory serves as the operating agent for the Clean Energy Solutions Center. The International Solar Alliance is Headquartered in India where the National Institute of Solar Energy serves as interim Secretariat.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PACT Data Management Plan (V.1.0)

The Perovskite PV Accelerator for Commercial Technology (PACT) is an independent validation center for the evaluation of perovskite PV technologies and their bankability. The center is led by Sandia National Laboratories and the National Renewable Energy Laboratory (NREL) and includes as part of its team Los Alamos National Laboratory (LANL), CFV Labs, Black and Veatch (B&V), and the Electric Power Research Institute (EPRI). The goals of the center are to: Develop and improve indoor and outdoor performance characterization methods, Develop and validate accelerated qualification testing for early failures (5-10 years), Research degradation and failure modes, Validate outdoor performance, and Provide bankability services to US perovskite PV (PSC) industry. The importance of data and data management to the success and outcomes of the PACT center is paramount. This report describes how data will be managed and protected by PACT and identifies important data management principles that will guide our approach.

14 SOLAR ENERGY↗

Bifacial PV Module Energy Modeling Validation Study

The cost delta between monofacial and bifacial photovoltaic (PV) modules was decreasing in 2018 when this study was initially proposed, making bifacial modules an attractive offering. However, there were limited field studies available that could be considered utility-scale representative, and PV module manufacturers were stating large ranges for the expected energy yield improvements of bifacial technology. This generated uncertainties regarding bifacial performance gains and the actual LCOE (levelized cost of energy). There was also relatively low confidence in the industry’s energy modeling tools’ ability to accurately predict bifacial energy yield, meaning that early adopters of bifacial modules were not able to fully account for the increased energy yield in their energy and financial models. The intent of this project was to provide the solar industry with greater certainty on the energy yield gains of bifacial modules and provide higher confidence in the ability for different energy modeling software to model bifacial PV site performance. Achieving this would allow for bifacial technology to become bankable (i.e. accepted by Independent Engineers, site financiers and other PV site stakeholders), offering a step change in PV site performance that had not been seen since the widespread adoption of the single-axis tracker. Over the course of this study other economic factors including a significant tariff exemption for bifacial modules resulted in accelerated adoption of bifacial technology throughout the US utility scale solar segment. The number of early adopters increased rapidly, and with many investors accepting this module choice the question of bifacial bankability was seemingly answered faster than expected. However, PVEL’s study has still achieved significant accomplishments in demonstrating the accuracy of bifacial modeling across three different software platforms. The results of this study have shown that the mean biased error (MBE) between the field data and the predicted values from all three software platforms were aligned with a maximum MBE of 1.3% and a minimum MBE of -1.8%.

14 SOLAR ENERGY↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary survey on site-adaptation techniques for satellite-derived and reanalysis solar radiation datasets

At any site, the bankability of a projected solar power plant largely depends on the accuracy and general quality of the solar radiation data generated during the solar resource assessment phase. The term 'site adaptation' has recently started to be used in the framework of solar energy projects to refer to the improvement that can be achieved in satellite-derived solar irradiance and model data when short-term local ground measurements are used to correct systematic errors and bias in the original dataset. This contribution presents a preliminary survey of different possible techniques that can improve long-term satellite-derived and model-derived solar radiation data through the use of short-term on-site ground measurements. The possible approaches that are reported here may be applied in different ways, depending on the origin and characteristics of the uncertainties in the modeled data. This work, which is the first step of a forthcoming in-depth assessment of methodologies for site adaptation, has been done within the framework of the International Energy Agency Solar Heating and Cooling Programme Task 46 'Solar Resource Assessment and Forecasting.'

14 SOLAR ENERGY↗

Radiometer calibration methods and resulting irradiance differences

Accurate solar radiation measured by radiometers depends on instrument performance specifications, installation method, calibration procedure, measurement conditions, maintenance practices, location, and environmental conditions. This study addresses the effect of different calibration methodologies and resulting differences provided by radiometric calibration service providers such as the National Renewable Energy Laboratory (NREL) and manufacturers of radiometers. Some of these methods calibrate radiometers indoors and some outdoors. To establish or understand the differences in calibration methodologies, we processed and analyzed field-measured data from radiometers deployed for 10 months at NREL's Solar Radiation Research Laboratory. These different methods of calibration resulted in a difference of ±1% to ±2% in solar irradiance measurements. Here by analyzing these differences will ultimately assist in determining the uncertainties of the field radiometer data and will help develop a consensus on a standard for calibration. Further advancing procedures for precisely calibrating radiometers to world reference standards that reduce measurement uncertainties will help the accurate prediction of the output of planned solar conversion projects and improve the bankability of financing solar projects.

14 SOLAR ENERGY↗