Search NASA⌕ Search

SEARCH · Search NASA

Results for “battery anomaly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Rapid Detection of Anomalies in Battery Energy Storage System Data

Data analytics is pivotal in assessing the technical characteristics and performance of Battery Energy Storage Systems (BESS), underpinning BESS modeling, optimization, and control. However, raw datasets frequently harbor anomalies from measurement errors and equipment malfunctions, impacting BESS reliability and analysis accuracy To address the challenge, this paper presents a novel methodology for the rapid detection of anomalous charge or discharge cycles within BESS operational data, expediting the cleaning process while ensuring data integrity. We’ve collected diverse and comprehensive real-world BESS operational datasets in collaboration with the Electric Power Research Institute and multiple Washington State utilities. These datasets serve dual roles: enabling comprehensive data exploration and analysis for understanding underlying challenges and method development, while also acting as a vital validation resource, demonstrating practical effectiveness. The proposed method detects anomalies and aids in their resolution, improving system performance characterization precision. It also reveals recurring data anomaly sources, offering insights for data collection and handling enhancement. Practitioners can gain valuable insights from the identified anomalous cycles in the real-world datasets along with the investigative process for root cause analyses and essential data cleaning steps.

Crawford, Aladsair J.↗

Biases in CloudSat Falling Snow Estimates Resulting from Daylight-Only Operations

Falling snow is a key component of the Earth’s water cycle, and space-based observations provide the best current capability to evaluate it globally. The Cloud Profiling Radar (CPR) on board CloudSat is sensitive to snowfall, and other satellite missions and climatological models have used snowfall properties measured by it for evaluating and comparing against their snowfall products. Since a battery anomaly in 2011, the CPR has operated in a Daylight-Only Operations (DO-Op) mode, in which it makes measurements primarily during only the daylit portion of its orbit. This work provides estimates of biases inherent in global snowfall amounts derived from CPR measurements due to this shift to DO-Op mode. We use CloudSat’s snowfall measurements during its Full Operations (Full-Op) period prior to the battery anomaly to evaluate the impact of the DO-Op mode sampling. For multi-year global mean values, the snowfall fraction during DO-Op changes by −10.16% and the mean snowfall rate changes by −8.21% compared with Full-Op. These changes are driven by the changes in sampling in DO-Op and are very little influenced by changes in meteorology between the Full-Op and DO-Op periods. The results highlight the need to sample consistently with the CloudSat observations or to adjust snowfall estimates derived from CloudSat when using DO-Op data to evaluate other precipitation products.

Lisa Milani↗

CloudSat Anomaly Recovery and Operational Lessons Learned

In April 2011, NASA's pioneering cloud profiling radar satellite, CloudSat, experienced a battery anomaly that placed it into emergency mode and rendered it operations incapable. All initial attempts to recover the spacecraft failed as the resultant power limitations could not support even the lowest power mode. Originally part of a six-satellite constellation known as the "A-Train", CloudSat was unable to stay within its assigned control box, posing a threat to other A-Train satellites. CloudSat needed to exit the constellation, but with the tenuous power profile, conducting maneuvers was very risky. The team was able to execute a complex sequence of operations which recovered control, conducted an orbit lower maneuver, and returned the satellite to safe mode, within one 65 minute sunlit period. During the course of the anomaly recovery, the team developed several bold, innovative operational strategies. Details of the investigation into the root-cause and the multiple approaches to revive CloudSat are examined. Satellite communication and commanding during the anomaly are presented. A radical new system of "Daylight Only Operations" (DO-OP) was developed, which cycles the payload and subsystem components off in tune with earth eclipse entry and exit in order to maintain positive power and thermal profiles. The scientific methodology and operational results behind the graduated testing and ramp-up to DO-OP are analyzed. In November 2011, the CloudSat team successfully restored the vehicle to consistent operational collection of cloud radar data during sunlit portions of the orbit. Lessons learned throughout the six-month return-to-operations recovery effort are discussed and offered for application to other R&D satellites, in the context of on-orbit anomaly resolution efforts.

cloud profiling radar satellite↗

Nickel-Cadmium Battery Operation Management Optimization Using Robust Design

In recent years following several spacecraft battery anomalies, it was determined that managing the operational factors of NASA flight NiCd rechargeable battery was very important in order to maintain space flight battery nominal performance. The optimization of existing flight battery operational performance was viewed as something new for a Taguchi Methods application.

NiCd rechargeable battery Taguchi Methods applicat↗

CloudSat Anomaly and Return to the A-Train: Lessons Learned for Satellite Constellations

In April 2011, CloudSat suffered a severe battery anomaly, leaving the space-craft in emergency mode without the ability to command or maneuver the spacecraft. Before the team was able to recover spacecraft operability, CloudSat passed close to the Aqua satellite in the A-Train and then exited the A-Train. A new mode of operations, termed Daylight Only Operations (DO-Op) mode was developed to enable CloudSat to resume science operations in an orbit under the A-Train by November 2011, and in July 2012 CloudSat re-entered the A-Train. This paper describes challenges and lessons-learned during the anomaly, the exit from the A-Train and the return to the A-Train. These lessons-learned may ap-ply to other current and future satellite constellations in Earth orbit.

formation-flying↗

CloudSat - From the A-Train to the C-Train

The CloudSat satellite was launched from Vandenberg Air Force Base, in California, on April 28, 2006. It was launched with the CALIPSO satellite, a joint mission between the National Aeronautics and Space Administration (NASA) and the Centre National D'Etudes Spatiales (CNES). CloudSat and CALIPSO were designed to fly in formation with each other, to combine their complimentary scientific measurements. The two missions were maneuvered into the Earth Science Afternoon Constellation (A-Train) shortly after launch and have flown in formation together since then. Originally designed to fly for 22 months, the CloudSat satellite has far exceeded expectations. Inflight anomalies on CloudSat necessitated changes to both the daily concept of operations and formation flying operations with CALIPSO. In 2011, a severe battery anomaly restricted CloudSat science data collection and maneuverability to the sunlit portions of the orbit. In 2017, CloudSat suffered a reaction wheel failure, triggering the criteria established to exit the A-Train. CloudSat successfully exited the A-Train in early 2018, suspending formation flying and joint science observations with CALIPSO. The joint CloudSat/CALIPSO science team continued collaboration with discussions focused on resuming joint observations. As both satellites were aging and CALIPSO was nearing the exhaustion of satellite propellant, the decision was made to lower CloudSat to the CALIPSO graveyard orbit, to be joined by CALIPSO as soon as feasible. With NASA’s approval, CloudSat was maneuvered to the lower orbit over the course of several months in mid-2018. Once CloudSat was in place, and with approval from CNES, CALIPSO began the delicate dance of lowering their orbit and re-aligning the satellite ground tracks. CloudSat and CALIPSO resumed formation flying in the newly dubbed C-Train (CloudSat and CALIPSO) orbit in the Fall of 2018. The ingenuity of the CloudSat and CALIPSO teams made the concept of the C-Train a reality. This paper will discuss the decision processes and the operational challenges the CloudSat flight team faced while designing and implementing the C-Train.

Witkowski, M.M.↗

Lessons Learned During the Transition of SORCE Science Operations to Daylight Only Operations

In July 2013, NASA's Solar Radiation and Climate Experiment experienced a battery anomaly which placed it into safemode halting all science observations. Initial attempts to recover the spacecraft to an operational configuration failed due to the reduced capacity of the battery. As the keystone mission for measuring total solar irradiance, and the cornerstone mission for measuring the solar spectral irradiance there was a strong motivation for developing a new operations concept that would allow SORCE to resume daily measurements of the Sun. The operations team faced many challenges over the next several months. For a five-day period in late 2013 the operations team was able resume science observations to cross-calibrate SORCE data with a new instrument launched in November 2013. After the cross-calibration campaign was completed a new operations concept was deployed which allowed SORCE to perform daylight only operations. In this mode of operations all non-essential components are powered off at each eclipse entry and then turned back on at sunrise. In March 2014 SORCE resumed making daily measurements of the Sun. This paper will review the events and lessons learned from the six-month recovery effort.

Spacecraft Anomaly↗

CloudSat Bias on Falling Snow Estimates Over the Daylight Only Operational Period (2012-2019)

Falling snow is a key component for the global atmospheric, hydrological and energy cycles, and its retrieval from space-based observations represents the best current capability to evaluate it globally. The Global Precipitation Measurement (GPM) Mission Core Observatory, launched in 2014, together with its constellation sensors, can provide quasi-global precipitation estimates every 30 minutes (for level 3 products). Evaluation and validation efforts for such products are crucial, and for global evaluations, one of the most suitable instruments is the Cloud Profiling Radar (CPR) on board CloudSat, which is sensitive to light rain and falling snow. However, due to a battery anomaly in 2011, during its period of overlapping observations with GPM the CPR has operated in a Daylight Only Operations mode (DO-Op) in which it makes measurements primarily during only the daylit portion of its orbit. The goal of this work is to estimate biases inherent in global snowfall amounts derived from CPR measurements due to this shift to DO-Op mode. We use CloudSat's snowfall measurements during its Full Operations (Full-Op) period from 2006 to 2010 to evaluate the impact DO-Op mode would have had during this period. Results indicate that omitting the nocturnal component of the diurnal cycle of snowfall has nonnegligible impact on snowfall amounts in some regions. The lack of nighttime data during DO-Op biases the latitudinally averaged mean snowfall rates as well as some regional values. Hemispheric differences in bias may be due to more pronounced diurnal variability in the northern hemisphere owing to more prevalent land surface versus the southern hemisphere. The results highlight the need to sample consistently with the CloudSat observations or to adjust snowfall estimates derived from CloudSat when using DO-Op data to evaluate other precipitation products.

Milani, Lisa↗

TERRA Battery Thermal Control Anomaly - Simulation and Corrective Actions

The TERRA spacecraft was launched in December 1999 from Vandenberg Air Force Base, becoming the flagship of NASA's Earth Observing System program to gather data on how the planet's processes create climate. Originally planned as a 5 year mission, it still provides valuable science data after nearly 10 years on orbit. On October 13th, 2009 at 16:23z following a routine inclination maneuver, TERRA experienced a battery cell failure and a simultaneous failure of several battery heater control circuits used to maintain cell temperatures and gradients within the battery. With several cells nearing the minimum survival temperature, preventing the electrolyte from freezing was the first priority. After several reset attempts and power cycling of the control electronics failed to reestablish control authority on the primary side of the controller, it was switched to the redundant side, but anomalous performance again prevented full heater control of the battery cells. As the investigation into the cause of the anomaly and corrective action continued, a battery thermal model was developed to be used in determining the control ability remaining and to simulate and assess corrective actions. Although no thermal model or detailed reference data of the battery was available, sufficient information was found to allow a simplified model to be constructed, correlated against pre-anomaly telemetry, and used to simulate the thermal behavior at several points after the anomaly. It was then used to simulate subsequent corrective actions to assess their impact on cell temperatures. This paper describes the rapid development of this thermal model, including correlation to flight data before and after the anomaly., along with a comparative assessment of the analysis results used to interpret the telemetry to determine the extent of damage to the thermal control hardware, with near-term corrective actions and long-term operations plan to overcome the anomaly.

Grob, Eric W.↗

Zn 2+ -mediated catalysis for fast-charging aqueous Zn-ion batteries

Rechargeable aqueous zinc-ion batteries (AZIBs), renowned for their safety, high energy density and rapid charging, are prime choices for grid-scale energy storage. Historically, ion-shuttling models centring on ion-migration behaviour have dominated explanations for charge/discharge processes in aqueous batteries, like classical ion insertion/extraction and pseudocapacitance mechanisms. However, these models struggle to account for the exceptional performance of AZIBs compared to other aqueous metal-ion batteries. Here, in this study, we present a catalysis model elucidating the Zn 2+ anomaly in aqueous batteries, explaining it through the concept of adsorption in catalysis. Such behaviour can serve the charge/discharge role, predominantly dictated by solvated metal cations and cathode materials. First-principles calculations suggest optimal adsorption/desorption behaviour (water dissociation process) with the Zn 2+ -vanadium nitride (VN) combination. Experimentally, AZIBs implementing VN cathodes demonstrate fast-charging kinetics, showing a capacity of 577.1 mAh g -1 at a current density of 300,000 mA g -1 . The grasp of catalysis steps within AZIBs can drive solutions beyond state-of-the-art fast-charging batteries.

25 ENERGY STORAGE↗

Anomaly Detection and Mitigation for Dynamic Frequency Regulation in Hydropower-Battery Systems

Hydropower operators and energy storage providers are increasingly interested in participating in frequency regulation services, driven by the incentives offered by independent system operators, such as the PJM Interconnection. This transition, however, unfolds against the backdrop of a modernizing and rapidly digitizing power grid, exposing the integrated legacy infrastructure to a multitude of cybersecurity threats. This work presents an approach for developing an anomaly detection and mitigation system to address cybersecurity challenges during the participation of a hydropower-integrated battery energy storage system (BESS) in a frequency regulation market. The applied anomaly detector utilizes machine learning algorithms to provide detailed classification of cyber-physical events. Later, the applied mitigation system triggers predefined corrective actions to minimize the impact of data integrity attacks on the regulation market and system stability. We evaluated the proposed approach on a hydropower-integrated BESS topology, specifically analyzing the slow regulation signal (Reg A) coming from the PJM market. Our simulation results demonstrate that the proposed approach performs well in detecting data integrity attacks within the allocated time frame and also minimizes the system's transient instability during the participation of hydropower and BESS in the regulation market.

battery energy storage system↗

International Ultraviolet Explorer (IUE) spacecraft battery performance update

January 26, 1987 marks the ninth inflight aniversary of the IUE spacecraft, launched into an eccentric synchronous orbit. The orbital path has subjected the spacecraft to 18 solar eclipse seasons since launch. Nine years of inflight operations culminate a major milestone for battery support to a spacecraft, which is well in excess of the initial 3 year design life. A brief outline of events, power system characteristics, and papers presented a previous battery workshops are provided. The IUE battery cell performance is excellent with the exception of the third electrode anomaly and temperature delta between batteries. Data indicates that battery depth-of-discharge (DOD) may be more critical to extend battery life than small operational temperature deltas between batteries. It is predicted that several additional years of battery life may be obtained by a reduction in operational battery DOD.

Tiller, Smith E.↗

Anomaly Detection and Mitigation for Dynamic Frequency Regulation in Hydropower-Battery Systems: Preprint

Hydropower operators and energy storage providers are increasingly interested in participating in frequency regulation services, driven by the incentives offered by independent system operators, such as the Pennsylvania-New Jersey-Maryland Interconnection (PJM), in a competitive electricity market. This transition, however, unfolds against the backdrop of a modernizing and rapidly digitizing power grid, exposing the integrated legacy infrastructure and vulnerable communication networks to a multitude of cybersecurity threats. These evolving threats not only endanger grid operations but also have the potential to trigger cascading disruptions across the broader grid network and influence regulation markets. This work presents an approach for developing an anomaly detection and mitigation system to address cybersecurity challenges during the participation of a hydropower-integrated battery energy storage system (BESS) in a frequency regulation market. The applied anomaly detector utilizes machine learning algorithms to provide detailed classification of cyber-physical events and provide a comprehensive situation awareness to grid operators. Later, the applied mitigation system triggers predefined corrective actions to minimize the impact of data integrity attacks on the regulation market and system stability. We evaluated the proposed approach on a fully active BESS topology using the slow regulation signal (Reg A) coming from the PJM market. Our simulation results reveal that the proposed approach performs well in detecting data integrity attacks within the allocated time frame and also minimizes the system's instability and economic loss during the participation of hydropower and BESS in the regulation market.

battery energy storage system↗