High Voltage Pulse Generator for High-Energy Beam Kickers Final Scientific/Technical Report
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
A Blumlein modulator is a relatively inexpensive pulsed power device that can deliver highly repeatable pulses that can be used to change the path of beam pulses. The modulator is primarily built with transmission line cable which is relatively inexpensive. Due to the highly repeatable nature of a Blumlein modulator it is a great tool for kicking beam pulses while producing very little spill or losses in beam current. One of the challenges with a Blumlein kicker is that the length of the kicking pulse output by the modulator is determined by the length of the cables. Cable lengths are set prior to implementation for the desired kicking pulse width. The Blumlein modulator at LANSCE uses a single thyratron which can deliver two 50-kilovolt 1,000-amp pulses of opposite polarity to kicking plates at the same time. This method makes for a very strong kick that is highly repeatable. A method that has been discussed, to deliver a different pulse width, is to add a second trigger that would be fired, once the desired pulse width has been delivered, cutting out the remaining pulse. The second trigger would offer a lot of variability with the pulse width of the kicker. This method has only ever been attempted using low current and relatively low voltages compared to the scale needed to properly kick a beam pulse. This in turn allows for the use of power supplies with a higher repetition rate. The advancement of this standard kicker technology in the accelerator facilities would attract attention within the scientific and engineering communities. The project detailed within will investigate the capabilities of different triggering topologies and design a prototype dual triggered Blumlein kicker modulator capable of variable kicking pulse width.
A harmonically resonant kicker cavity designed for beam exchange in a circulator cooler was built and successfully tested at the Upgraded Injector Test Facility (UITF) at Jefferson Lab. This type of cavity is being considered for the injection scheme of the Rapid Cycling Synchrotron at the Electron-Ion Collider, where the spacing of neighboring bunches demands very short kicks. Operating with five transversely deflecting modes simultaneously that resonate at 86.6 MHz and consecutive odd harmonics thereof, the prototype cavity selectively deflects 1 of 11 electron bunches while leaving the others unperturbed. An RF driver was developed to synthesize phase- and amplitude-controlled harmonic signals and combine them to drive the cavity while also separating the modes from a field-probe antenna for RF feedback and dynamic tuning. Beam deflection was measured by sweeping the cavity phase; the deflection waveform agrees with expectations, having sub-nanosecond rise and fall times. No emittance increase is observed. Harmonically resonant cavities like the one described provide a new capability for injection and extraction at circulators and rings.
A harmonic kicker, a beam exchange device that can deflect the beam at an ultra-fast time scale (a few ns), has been developed in Jefferson Lab *, **. The high power prototype that can deliver more than a 100 kV kick at 7 kW was fabricated. The RF performance of cavity such as the harmonic resonant frequencies, kick profiles, it’s stability, and electric center is tested at bench. The cavity will eventually be tested with a beam at Upgraded Injector Test Facility (UITF) in Jefferson Lab. In this paper, we report some features of fabrication and bench test results. We also briefly describe our beam test plan in the future.
We explore the relative merits of transporting the beam from the H + ion source and from the H - ion source to Area-A for low current applications. Transporting the H - beam to Area-A using the laser neutralization approach has some risk associated with it and will require some development. Alternative method of delivering H - beam to Area-A includes replacing LDBM00 bending magnet with kicker for sharing beam between Line D and modified Line A. Transporting the H + beam to Area-A will have significant impact on the operation the IPF facility and maintaining high pulse rate to IPF will require major modifications to the transition region of the accelerator and Drift Tube Linac.
The design of the high power prototype of the harmonic kicker cavity for the Circulator Cooler Ring (CCR) of the Jefferson Lab Electron-Ion Collider (JLEIC) is complete and fabrication is underway. In this report, we present some of impedance study with a high beam current of the JLEIC (average current ~ 0.76 A) for the HOM and RF power estimation.
Nonlinear kickers (NLKs) enable off-axis injection in ultralow-emittance storage rings by providing a strong kick to the injected beam while remaining nearly transparent to the stored beam. In hybrid schemes, a conventional four-kicker bump defines the injected trajectory, and the NLK reduces the first-turn action under constrained beam offset and optics conditions. Effective operation additionally requires stable and reproducible first-turn injection trajectories. We develop a compact action–angle framework that expresses NLK dynamics in terms of Courant–Snyder invariants and yields an analytical bound on achievable action reduction. This formulation provides direct design rules for NLK placement, phase advance, injected-beam offset, and kicker field profile. Within this framework, we identify the 8-wire NLK as a practical baseline and extend its design by relaxing the square-geometry constraint, enabling inward shifting of the off-axis field peak while preserving on-axis field and gradient cancellation. Application to the NSLS-II lattice shows how aperture, pulsed-power, and mechanical constraints combine to determine a coupled design solution. Multi-turn tracking confirms that candidate NLK locations maintain sufficient stay-clear (aperture-clearance) margin, while the optimized wire geometry reduces the required current and Lorentz force load. The results establish a unified approach for NLK-assisted injection design and provide a practical pathway for upgrades in diffraction-limited storage rings.
The present RHIC beam-injection-system and one of its components the Lambertson septum magnet will be used by the EIC project to inject the hadrons from the AGS into the EIC hadron ring for further acceleration. The number of hadron bunches injected to fill the EIC ring will be almost three times as many as compared to the number of bunches to fill RHIC. The increase of the injected bunches requires new type of kickers known as “transmission line” or “strip line” kickers which provide faster rise time of ~18 nsec, but this type of kickers may not be strong enough to provide the kick required to place the injected beam trajectory into the reference orbit of the circulating beam. In this technical note we provide a modification of the RHIC injection system which consists of lowering the Lambertson septum to decrease the strength of the kickers required to place the injected beam into the reference orbit of the circulating beam.
One of the challenges of designing the Electron-Ion Col lider (EIC) is to mitigate beam-induced heating due to the intense electron and hadron beams. Heating of the ESR vac uum chamber components is mainly due to beam-induced resistive wall (RW) losses and synchrotron radiation. For the HSR heating is mainly due to large radial offsets and heat conduction from room temperature to cryogenic tem perature for cryo-components. In this paper, we provide an update on the beam-induced heating and thermal analysis of some critical ESR vacuum chamber components, such as the ESR Large Angle Bremhustraulung Monitor (LABM). We also provide a similar update for critical HSR vacuum com ponents, including the cryo-cooled BPM button assembly, beam screen, abort kicker, and polarimeter. To perform the thermal analyses, the resistive wall loss on individual compo nents is calculated with CST and the synchrotron radiation (if exists) is evaluated using SynRad. These losses, along with realistic boundary conditions are then fed to ANSYS to determine the temperature distribution.
The Electron-Ion Collider (EIC), the next-generation nuclear science facility, is under the design at the Brookhaven National Laboratory. The present RHIC rings will be reconfigured as the Hadron Storage Ring (HSR) for the EIC. Design of a stripline injection kicker for the HSR for beams with the rigidity of ~ 81 T-m poses some technical challenges due to the expected shorter bunch spacing, heating due to higher peak current and the larger number of bunches, and the required higher pulsed voltage. Recently, we updated its mechanical design to optimize the characteristic and beam coupling impedances. In addition, we incorporated the impedance tuning capability by introducing the kicker aperture adjustment mechanism. Finally, we incorporated high voltage FID feedthroughs (FC26) to this kicker. This paper reports the design and optimization updates of the HSR injection kicker including the impedance tuning capability, optimization of both the characteristic and the beam coupling impedances, and finally the incorporation of a high voltage feedthrough design.
The Electron-Ion Collider (EIC), to be built at Brookhaven National Laboratory, will be a high luminosity (~10 34 cm –2 s –1 ) nuclear science facility. To facilitate EIC experiments, the existing yellow ring of the Relativistic Heavy Ion Collider (RHIC) will be reconfigured to serve as the Hadron Storage Ring (HSR). Designing a stripline injection kicker for the HSR beams, with high magnetic rigidity (~ 82 Tm), poses some technical challenges due to the required large pulsed voltage with long flattop duration, very fast rise time, expected shorter bunch spacing, and potential heating due to higher peak current. In addition, minimizing impedance mismatch in the transition region between the feedthrough and the stripline electrode is challenging. This paper focuses on the mechanical design and optimization of the HSR injection kicker, highlighting a novel impedance tuning capability achieved through an innovative kicker aperture adjustment mechanism. We comprehensively cover the design, including impedance optimization (both beam coupling and characteristic), beam-induced heating, and thermal analysis, and investigation of the maximum electric field due to high voltage signal excitation to ensure safe and reliable operation.
Ionization scattering of electron beams with residual gas molecules causes ion trapping in electron rings, both in a collider and electron cooling system. These trapped ions may cause emittance growth, tune shift, halo formation, and coherent coupled bunch instabilities. In order to clear the ions and prevent them from accumulating turn after turn, the gaps in a temporal structure of the beam are typically used. Typically, the gap in the bunch train has a length of a few percent of the ring circumference. In those regions, the extraction electrodes with high pulsed voltages are introduced. In this paper, we present the design consideration and initial test results of the high-voltage pulsed kicker hardware that includes vacuum device and pulsed voltage driver, capable of achieving over 3 kV of deflecting voltage amplitude, rise and fall times of less than 10 ns, 100 ns flat-top duration at 1.4 MHz repetition rate.
The electron injector for the Electron-Ion Collider (EIC) consists of a linear accelerator, a beam accumulation ring, and the Rapid Cycling Synchrotron (RCS) before the electrons are injected into the Electron Storage Ring (ESR) and collided. Extraction out of the RCS is complicated by limited space and the nominal beam pipe aperture, while injection into the ESR is complicated due to the limitation of kicker strength, so that the kickers will not impact the proton beam in the adjacent Hadron Storage Ring (HSR); additionally, the ESR kickers must also provide enough kick to the stored bunch for the swap-out scheme. This paper covers the injection into and extraction out of the RCS, as well as injection into the ESR, detailing layout, optics, and anticipated parameters of the septa and different kickers.
Not Available
A dedicated electron transfer line from Rapid Cycling Synchrotron (RCS) to Electron Storage Ring (ESR), referred to as the RTE line has been designed for the Electron-Ion Collider (EIC). The beamline follows a straight-line geometry, with a length of 133 m, and is consists with two matching sections and a FODO section for beam diagnostics. Imperfections with magnet alignments introduce orbit distortions, making orbit correction scheme a critical component in the design. To facilitate orbit correction, each quadrupole magnet is equipped with a pair of beam position monitors (BPMs) and kickers. The Singular Value Decomposition (SVD) algorithm is used for orbit correction and tolerance studies. This paper presents the ongoing progress in the optics design and error correction scheme of the RTE line.
We present analytic cooling and diffusion rates for a simplified model of coherent electron cooling (CEC), based on a proton energy kick at each turn. This model also allows to estimate analytically the rms value of electron beam density fluctuations in the "kicker" section. Having such analytic expressions should allow for better understanding of the CEC mechanism, and for a quicker analysis and optimization of main system parameters. Our analysis is applicable to any CEC amplification mechanism, as long as the wake (kick) function is available.
An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.