Search NASA⌕ Search

SEARCH · Search NASA

Results for “beam loading compensation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Adaptive Beam Loading Compensation in Room Temperature Bunching Cavities

In this paper we present the design, simulation, and proof of principle results of an optimization based adaptive feedforward algorithm for beam-loading compensation in a high impedance room temperature cavity. We begin with an overview of prior developments in beam loading compensation. Then we discuss different techniques for adaptive beam loading compensation and why the use of Newton?s Method is of interest for this application. This is followed by simulation and initial experimental results of this method.

43 PARTICLE ACCELERATORS↗

RF pulse shape control in the compact linear collider test facility

The Compact Linear Collider (CLIC) is a study for an electron–positron machine aiming at accelerating and colliding particles at the next energy frontier. The CLIC concept is based on the novel two-beam acceleration scheme, where a high-current low-energy drive beam generates RF in series of power extraction and transfer structures accelerating the low-current main beam. To compensate for the transient beam-loading and meet the energy spread specification requirements for the main linac, the RF pulse shape must be carefully optimized. This was recently modelled by varying the drive beam phase switch times in the sub-harmonic buncher so that, when combined, the drive beam modulation translates into the required voltage modulation of the accelerating pulse. In this paper, the control over the RF pulse shape with the phase switches, that is crucial for the success of the developed compensation model, is studied. The results on the experimental verification of this control method are presented and a good agreement with the numerical predictions is demonstrated. Implications for the CLIC beam-loading compensation model are also discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Apex Study: Compensating Transient Beam Loading in the RHIC 28 MHZ

With the EIC on the way, it is important that developments and strategies are in place to deal with the very high beam currents that the machine will feature. Specifically, the EIC will collide beams of up to 2.5 A, three times the beam current in RHIC. This higher beam current will cause significant voltage transients in the cavity fields which can lead to longitudinal instabilities and beam loss. In anticipation of these negative effects, studies were carried out on the RHIC 28 MHz cavities using newly developed firmware and software to diagnose and combat beam loading. Diagnostic tools such as the bunch-by-bunch (BbyB) ADC firmware and digital network analyzer (DNA) were used to characterize the closed loop system and transient on the cavity voltage magnitude and phase. Then, a one-turn delay feedback (OTFB) and adaptive feed-forward (aFFWD) were used to minimize the transient beam loading. The studies were carried out with beam during 2 accelerator physics experiements (APEXs) using one of the 28 MHz accelerating cavities here at RHIC.

43 PARTICLE ACCELERATORS↗

Progress in developing a superconducting accelerator for efficient eBeam and X-ray production

The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.

43 PARTICLE ACCELERATORS↗

Timing and Synchronization in the LLRF systems of the Fermilab PIP-II Linac

The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.

Varghese, Philip↗

Hazard Analysis for 90 MeV Booster Injection Energy Limit

The NSLS-II booster is designed to accelerate 200 MeV electrons to an energy of 3 GeV to serve as a full energy injector for the NSLS-II storage ring. Electrons are supplied to the booster from the NSLS-II linac. The NSLS-II booster was specified to accept electrons with an energy as low as 170 MeV. The supplemental shielding is designed to shield all energies from 150 MeV to the booster’s maximum energy of 3.2 GeV. Due to the shielding design, the NSLS-II PPS system guarantees that the beam energy must be above 151 MeV upon transport to the booster ring for injection. Recently, problems with the linac klystrons have come to the point that operating the NSLS-II linac below the 150 MeV may be the only possible way for the linac to deliver electrons to the booster. If the NSLS-II linac were limited to operate on only 1 klystron, at full power only 120 MeV beam energy would be possible. The nominal operating energy would be 100 MeV to leave overhead for beam loading compensation and to not stress the last remaining klystron any more than necessary. Since this is below the design of the booster shielding, the supplemental shielding needs to be analyzed to ensure that it is sufficient for lower energy beams. In this report, we discuss the impact of lowering the booster injection energy to 90 MeV on the supplemental shielding. Issues relating to how the booster will perform at this lower energy are not discussed.

36 MATERIALS SCIENCE↗

Performance of the LLRF System for the Fermilab PIP-II Injector Test

PIP-II IT is a test facility for the PIP-II project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The 8-cavity half-wave-resonator (HWR) cryomodule operating at 162.5 MHz is followed by the 8-cavity single-spoke resonator(SSR1) cryomodule operating at 325 MHz. The LLRF systems for both cryomodules are based on a common SOC FPGA-based hardware platform. The resonance control systems for the two cryomodules are quite different, the first being a pneumatic system based on helium pressure and the latter a piezo/stepper motor type control. The data acquisition and control system can support both CW and Pulsed mode operations. Beam loading compensation is available which can be used for both manual/automatic control in the LLRF system. The user interfaces include EPICS, Labview, and ACNET. Testing of the RF system has progressed to the point of being ready for a 2 mA beam to be accelerated to 25 MeV. The design and performance of the field control and resonance control system operation with beam are presented in this paper.

43 PARTICLE ACCELERATORS↗

Study of the effect of loop inductance on the RF transmission line to cavity coupling coefficient

Coupling of RF power is an important aspect in the design and development of RF accelerating structures. RF power coupling employing coupler loops has the advantage of tunability of β, the transmission line to cavity coupling coefficient. Analytical expressions available in literature for determination of size of the coupler loop using Faraday’s law of induction show reasonably good agreement with experimentally measured values of β below critical coupling (β ≤ 1) but show large deviation with experimentally measured values and predictions by simulations for higher values of β. In actual accelerator application, many RF cavities need to be over-coupled with β > 1 for reasons of beam loading compensation, reduction of cavity filling time, etc. This paper discusses a modified analytical formulation by including the effect of loop inductance in the determination of loop size for any desired coupling coefficient. The analytical formulation shows good agreement with 3D simulations and with experimentally measured values. It has been successfully qualified by the design and development of power coupler loops for two 476 MHz pre-buncher RF cavities, which have successfully been conditioned at rated power levels using these coupler loops.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Baseband Digital Network Analyzer Upgrade for LLRF Controllers

Digital Network Analyzers (DNA) have been implemented in many Low-Level Radio Frequency (LLRF) systems, notably NSLS-II and CERN, to help tune feedback loops. DNA characterizes feedback loops by measuring the frequency-dependent magnitude and phase transfer functions. It enables the measurement of open loop gains, gain/phase margins, and loop delays to help fine-tune feedback loops. An FPGA-based DNA has been developed and integrated into the current Relativistic Heavy Ion Collider (RHIC) LLRF infrastructure. Its performance has been tested with an implementation of one-turn delay feedback (OTFB) on the bench to maximize gain and stability. The DNA has been used to characterize a RHIC 28 MHz cavity in a RHIC Accelerator Physics Experiment (APEX) to test transient beam loading compensation strategies.

43 PARTICLE ACCELERATORS↗

Development of a Marx Modulator for FNAL Linac

A Marx-topology modulator has been designed and developed at the Fermi National Accelerator Laboratory under the Proton Improvement Plan (PIP). This modulator replaces the previous triode hard-tube design, increasing reliability, lowering operational costs, and maintaining waveform accuracy. The Marx modulator supplies the anode of the 7835 VHF power triode tube with a 35 kV, 375 Amp, 460 μs pulse at 15 Hz. It consists of 54 individual Marx cells, each containing a 639 μF capacitor charged to 900 Volts, combined in series with IGBT switches to create the desired output waveform. This requires variable rise and fall times, flattening of capacitive droop, and feedforward beam loading compensation. All five 201.25 MHz RF systems have been upgraded to Marx modulators to ensure continued operation of the linear accelerator.

43 PARTICLE ACCELERATORS↗

Development of a Marx Modulator for FNAL Linac

A Marx-topology modulator has been designed and developed at the Fermi National Accelerator Laboratory under the Proton Improvement Plan (PIP). This modulator replaces the previous triode hard-tube design, increasing reliability, lowering operational costs, and maintaining waveform accuracy. The Marx modulator supplies the anode of the 7835 VHF power triode tube with a 35 kV, 375 Amp, 460 µs pulse at 15 Hz. It consists of 54 indi-vidual Marx cells, each containing a 639 µF capacitor charged to 900 Volts, combined in series with IGBT switches to create the desired output waveform. This requires variable rise and fall times, flattening of capaci-tive droop, and feedforward beam loading compensation. All five 201.25 MHz RF systems have been upgraded to Marx modulators to ensure continued operation of the linear accelerator.

43 PARTICLE ACCELERATORS↗

Design of a Marx-Topology Modulator for FNAL Linac

The Fermilab Proton Improvement Plan (PIP) was formed in late 2011 to address important and necessary upgrades to the Proton Source machines (Injector line, Linac and Booster). The goal is to increase the proton flux by doubling the Booster beam cycle rate while maintaining the same intensity per cycle, the same uptime, and the same residual activation in the enclosure. For the Linac, the main focus within PIP is to address reliability. One of the main tasks is to replace the present hard-tube modulator used on the 200 MHz RF system. Plans to replace this high power system with a Marx-topology modulator, capable of providing the required waveform shaping to stabilize the accelerating gradient and compensate for beam loading, will be presented, along with development data from the prototype unit.

43 PARTICLE ACCELERATORS↗

TRANSIENT BEAM LOADING DUE TO THE BUNCH TRAIN GAP AND ITS COMPENSATION EXPERIMENTS AT BEPC-II AND ALS

Non-uniform bunch fill patterns in storage rings, driven by the need to provide gaps for beam aborting and ion clearing cause a large beam loading change in the RF cavities. The induced turn-periodic transient in the cavity voltage modulates longitudinal beam properties along the train, such as synchronous phase and bunch length. We have carried out beam based experiments on the BEPC-II at IHEP and on the ALS at LBNL, using bunch-by-bunch diagnostic capabilities of the coupled-bunch feedback systems to study this transient effect. A modulated bunch filling pattern with higher charge density around the gap has been demonstrated to be effective in partially compensating this transient modulation. Details of the experimental setups and the data analysis will be presented.

Wang, H.↗

Capture, acceleration and bunching rf systems for the MEIC booster and storage rings

The Medium-energy Electron Ion Collider (MEIC), proposed by Jefferson Lab, consists of a series of accelerators. The electron collider ring accepts electrons from CEBAF at energies from 3 to 12 GeV. Protons and ions are delivered to a booster and captured in a long bunch before being ramped and transferred to the ion collider ring. The ion collider ring accelerates a small number of long ion bunches to colliding energy before they are re-bunched into a high frequency train of very short bunches for colliding. Two sets of low frequency RF systems are needed for the long ion bunch energy ramping in the booster and ion collider ring. Another two sets of high frequency RF cavities are needed for re-bunching in the ion collider ring and compensating synchrotron radiation energy loss in the electron collider ring. The requirements from energy ramping, ion beam bunching, electron beam energy compensation, collective effects, beam loading and feedback capability, RF power capability, etc. are presented. The preliminary designs of these RF systems are presented. Concepts for the baseline cavity and RF station configurations are described, as well as some options that may allow more flexible injection and acceleration schemes.

Wang, Shaoheng↗