Scale Resistant Heat Exchanger for Low Temperature Geothermal Binary Cycle Power Plant

Phase 1 of the investigation of improvements to low temperature geothermal power systems was completed. The improvements considered were reduction of scaling in heat exchangers and a hermetic turbine generator (eliminating seals, seal system, gearbox, and lube oil system). A scaling test system with several experiments was designed and operated at Coso geothermal resource with brine having a high scaling potential. Several methods were investigated at the brine temperature of 235 ºF. One method, circulation of abradable balls through the brine passages, was found to substantially reduce scale deposits. The test heat exchanger was operated with brine outlet temperatures as low as 125 ºF, which enables increased heat input available to power conversion systems. For advanced low temperature cycles, such as the Variable Phase Cycle (VPC) or Kalina Cycle, the lower brine temperature will result in a 20-30% increase in power production from low temperature resources. A preliminary design of an abradable ball system (ABS) was done for the heat exchanger of the 1 megawatt VPC system at Coso resource. The ABS will be installed and demonstrated in Phase 2 of this project, increasing the power production above that possible with the present 175 ºF brine outlet limit. A hermetic turbine generator (TGH) was designed and manufacturing drawings produced. This unit will use the working fluid (R134a) to lubricate the bearings and cool the generator. The 200 kW turbine directly drives the generator, eliminating a gearbox and lube oil system. Elimination of external seals eliminates the potential of leakage of the refrigerant or hydrocarbon working fluids, resulting in environmental improvement. A similar design has been demonstrated by Energent in an ORC waste heat recovery system. The existing VPC power plant at Coso was modified to enable the “piggyback” demonstration of the TGH. The existing heat exchanger, pumps, and condenser will be operated to provide the required process conditions for the TGH demonstration. Operation of the TGH with and without the ABS system will demonstrate an increase in geothermal resource productivity for the VPC from 1 MW/(million lb) of brine to 1.75 MW/(million lb) of brine, a 75% increase.

15 GEOTHERMAL ENERGY↗

Suzaku monitoring of hard X-ray emission from η Carinae over a single binary orbital cycle

The Suzaku X-ray observatory monitored the supermassive binary system η Carinae 10 times during the whole 5.5 yr orbital cycle between 2005 and 2011. This series of observations presents the first long-term monitoring of this enigmatic system in the extremely hard X-ray band between 15 and 40 keV. During most of the orbit, the 15-25 keV emission varied similarly to the 2-10 keV emission, indicating an origin in the hard energy tail of the kT ∼ 4 keV wind-wind collision (WWC) plasma. However, the 15-25 keV emission declined only by a factor of three around periastron when the 2-10 keV emission dropped by two orders of magnitude due probably to an eclipse of the WWC plasma. The observed minimum in the 15-25 keV emission occurred after the 2-10 keV flux had already recovered by a factor of ∼3. This may mean that the WWC activity was strong, but hidden behind the thick primary stellar wind during the eclipse. The 25-40 keV flux was rather constant through the orbital cycle, at the level measured with INTEGRAL in 2004. This result may suggest a connection of this flux component to the γ-ray source detected in this field. The helium-like Fe Kα line complex at ∼6.7 keV became strongly distorted toward periastron as seen in the previous cycle. The 5-9 keV spectra can be reproduced well with a two-component spectral model, which includes plasma in collision equilibrium and a plasma in non-equilibrium ionization (NEI) with τ ∼ 10{sup 11} cm{sup –3} s{sup –1}. The NEI plasma increases in importance toward periastron.

79 ASTRONOMY AND ASTROPHYSICS↗

Efficient data-driven models for prediction and optimization of geothermal power plant operations

Increasing the capacity of geothermal energy as a renewable resource calls for development and deployment of efficient control and optimization technologies for geothermal power plants. A data-driven prediction and optimization model is presented as a cost-effective and efficient alternative to physics-based approach. The model predicts power output and operational cost by propagating the influence of control and disturbance variables within an artificial neural network (ANN). Numerical experiments with simulated and field data from a real geothermal power plant are first used to demonstrate the prediction performance of the ANN model. The model is then adopted to maximize the net predicted power production by automatically adjusting the working fluid circulation rate. The optimization performance of the model in evaluated using a thermodynamic flowsheet simulation model. The workflow is applied to model and control the effect of ambient temperature on an air-cooled binary cycle power plant, which is complex and costly to perform using a physics-based predictive model. As a result, the performance of the method is demonstrated by applying it to both simulated and field datasets from a binary cycle geothermal power plant.

15 GEOTHERMAL ENERGY↗

Chapter 2: Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

The global geothermal power market has shown significant growth since the last decade and is expected to reach a total installed capacity of 18.4 gigawatts electric (GWe) by the end of 2021 (GEA, 2016). The global geothermal power plant turbine market is dominated by a small number of manufacturers. Between 2005 and 2015, 82% of the geothermal steam turbines were manufactured in Japan, and 74% of the geothermal binary cycle turboexpanders were manufactured in Israel. During this period, the United States played an important role in the global trade flow of fully assembled turbine units and turbine parts, with a high volume of imports and exports. Another significant growth area was in Italian turbine/turboexpander manufacturers, who have increased their market share in the last couple of years. One other important change in the manufacturing market was in Turkey, where the bonus on feed-in-tariff (FIT) for domestic hardware components boosted the national manufacturing sector between 2010 and 2020. When planning geothermal power projects, developers customize their power plant size to fit the available geothermal resource capacity. The turbine is designed and sized to optimize the efficiency and utilization of resource and revenue production. The rest of the power plant components such as heat exchangers (HX), water-cooled cooling towers (WCCT), or air-cooled condensers (ACC) are then chosen to complement the turbine size and design. These one-off manufacturing custom design turbines have relatively higher manufacturing set-up costs, longer lead times, and higher capital costs than the standard design turbines manufactured in larger volumes. However, turbines produced in standard increments and in larger manufacturing volumes could result in lower costs per turbine, but potentially lower efficiency. Based on pipeline projects and resource assessments, there is significant potential value in creating standard turbine sizes that could offer an economic advantage, as is done for modular microturbines.

40 EE - Geothermal Technologies Office (EE-4G)↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗

Solar-Driven Steam Topping Cycle for a Binary Geothermal Power Plant

Solar-thermal hybridization is a way to boost power generation of geothermal power plants, especially when the geothermal resource cannot supply the design flow or temperature. A new process using a high-pressure steam topping turbine can almost double the conversion rate of solar energy to power compared to the common practice of solar brine heating, and thus improve economic viability.

15 GEOTHERMAL ENERGY↗

Variability in Diurnal and Seasonal Ambient Conditions on Geothermal Plant Performance and Cost: Preprint

Geothermal plant performance is bounded by the second law efficiency, which accounts for the quantity of exergy that can be converted into useful work. This in turn is dependent on the geothermal resource temperature and the temperature of the heat sink (i.e., the ambient temperature). In this study we show that ambient temperature variability on a diurnal and seasonal basis can affect performance and cost estimations for geothermal plants. We have utilized the updated System Advisor Model (SAM) to assess nine geothermal sites with existing resource capacities across three climate zones. Our analysis shows that both evaporatively-cooled flash and air-cooled binary cycle plants are affected by temperature, with a slightly higher effect in EGS binary sites. By assuming an ambient (wet bulb) temperature baseline of 15.6 degrees C (60 degrees F) and comparing baseline results to those from site-specific data we observe up to 15% underestimation of plant performance and up to 20% overestimation of cost.

ambient temperature↗

Variability in Diurnal and Seasonal Ambient Conditions on Geothermal Plant Performance and Cost

Geothermal plant performance is bounded by the second law efficiency, which accounts for the quantity of exergy that can be converted into useful work. This, in turn, is dependent on the geothermal resource temperature and the temperature of the heat sink (i.e., the ambient temperature). In this study, we show that ambient temperature variability on a diurnal and seasonal basis can affect performance and cost estimations for geothermal plants. We have utilized the updated System Advisor Model (SAM) to assess nine geothermal sites with existing resource capacities across three climate zones. Our analysis shows that both evaporatively-cooled flash and air-cooled binary cycle plants are affected by temperature, with a slightly higher effect in enhanced geothermal system binary sites. By assuming an ambient (wet bulb) temperature baseline of 15.6 degrees C (60 degrees F) and comparing baseline results to those from site-specific data, we observe up to 15% underestimation of plant performance and up to 20% overestimation of cost. These results make a case for the inclusion of location-based weather data as inputs to supply curves that are used in capacity expansion models for the prediction of future geothermal deployment scenarios.

ambient temperature↗

August 2014 Dixie Valley DOE Production Data

Binary Engineering production data for August 2014. Used to demonstrate the techno-economic feasibility of utilizing the available unused heat to generate additional electric power from a binary power plant.

15 GEOTHERMAL ENERGY↗

July 2014 Dixie DOE Data

Binary production Data. Used to demonstrate the techno-economic feasibility of utilizing the available unused heat to generate additional electric power from a binary power plant.

15 GEOTHERMAL ENERGY↗

GEOTHERMAL / SOLAR HYBRID DESIGNS: USE OF GEOTHERMAL ENERGY FOR CSP FEEDWATER HEATING

This paper examines a hybrid geothermal / solar thermal plant design that uses geothermal energy to provide feedwater heating in a conventional steam-Rankine power cycle deployed by a concentrating solar power (CSP) plant. The geothermal energy represents slightly over 10% of the total thermal input to the hybrid plant. The geothermal energy allows power output from the hybrid plant to increase by about 8% relative to a stand-alone CSP plant with the same solar-thermal input. Geothermal energy is converted to electricity at an efficiency of 1.7 to 2.5 times greater than would occur in a stand-alone, binary-cycle geothermal plant using the same geothermal resource. While the design exhibits a clear advantage during hybrid plant operation, the annual advantage of the hybrid versus two stand-alone power plants depends on the total annual operating hours of the hybrid plant. The annual results in this draft paper are preliminary, and further results are expected prior to submission of a final paper.

14 SOLAR ENERGY↗

Evaluation of sintered bauxite proppant for binary enhanced geothermal systems

Abstract Solid granular proppant particles are widely used in oil and gas development to sustain permeability through fractures after hydraulic stimulation. Similar proppants are of interest for geothermal applications where the goal of sustaining permeability is the same, but the harsh geothermal environment risks rapid proppant degradation that will reduce fracture permeability. Here, we present proppant conductivity experiments using saw cut granite, tensile fractured granite, and aluminum control specimens packed with sintered bauxite ceramic proppants at concentrations of 0.0, 0.1, and 1.0 kg/m 2 . Simulated geothermal conditions included temperatures up to 130 °C and normal closure stresses up to 60 MPa. Compared to unpropped specimens, peak fracture conductivity enhancement was up to 6 orders of magnitude. At simulated geothermal conditions, proppants were able to sustain fracture conductivity over 60 h, but chemical dissolution and decreasing permeability over time were evident. Irreversible conductivity reductions with crushing and embedment of proppants during loading stages were also observed. Overall, sintered bauxite proppant remains a promising option for low-temperature binary-cycle enhanced geothermal systems.

58 GEOSCIENCES↗

Numerical analysis of downhole heat exchanger designed for geothermal energy production

A traditional way of geothermal energy production implies hot brine extraction from the reservoir to a surface facility. This method is economically profitable only for high enthalpy reservoirs associated with shallow depths and high temperatures. The low enthalpy geothermal (LEG) projects are out of consideration due to the high cost of produced electric power related to expensive drilling, cost of the binary cycle system, and long term installation cost. This paper presents a new zero mass extraction method utilizing downhole heat exchanger (DHE) with no geo-fluid production to the surface. The well design stays as a single horizontal well with coupled production and injection sections. The brine pump is located between the sections providing hot brine circulation through the DHE. The coupled fluid flow and heat transfer mathematical model was developed and simulated using nodal analysis method. The LEG reservoir prototype located in South Louisiana was used to study several cases of the DHE lengths, inclination angles, reservoir permeabilities, and flow rates optimization. According to the analysis, the power unit is able to provide 160 kW of net electric power with CO2 working fluid circulating inside a single lateral well. Increasing the reservoir temperature and the number of laterals, the available power production rises up to 600 kW with an attractive electricity cost of $21.84/MWh at 7000 m well depth. This methods opens a new prospective for the depleted petroleum wells converting them to the electricity production units.

15 GEOTHERMAL ENERGY↗

Magnetic Flux Plays an Important Role during a Black Hole X-Ray Binary Outburst in Radiative Two-temperature General Relativistic Magnetohydrodynamic Simulations

Abstract Black hole (Bh) X-ray binaries cycle through different spectral states of accretion over the course of months to years. Although persistent changes in the Bh mass accretion rate are generally recognized as the most important component of state transitions, it is becoming increasingly evident that magnetic fields play a similarly important role. In this article, we present the first radiative two-temperature general relativistic magnetohydrodynamics simulations in which an accretion disk transitions from a quiescent state at an accretion rate of M ̇ ∼ 10 − 10 M ̇ Edd to a hard-intermediate state at an accretion rate of M ̇ ∼ 10 − 2 M ̇ Edd . This huge parameter space in mass accretion rate is bridged by artificially rescaling the gas density scale of the simulations. We present two jetted BH models with varying degrees of magnetic flux saturation. We demonstrate that in “standard and normal evolution” models, which are unsaturated with magnetic flux, the hot torus collapses into a thin and cold accretion disk when M ̇ ≳ 5 × 10 − 3 M ̇ Edd . On the other hand, in “magnetically arrested disk” models, which are fully saturated with vertical magnetic flux, the plasma remains mostly hot with substructures that condense into cold clumps of gas when M ̇ ≳ 1 × 10 − 2 M ̇ Edd . This suggests that the spectral signatures observed during state transitions are closely tied to the level of magnetic flux saturation.

Astronomy & Astrophysics↗

THREE FUNDAMENTAL PERIODS IN AN 87 YEAR LIGHT CURVE OF THE SYMBIOTIC STAR MWC 560

We construct a visual light curve of the symbiotic star MWC covering the last 87 years of its history. The data were assembled from the literature and from the AAVSO data bank. Most of the periodic components of the system brightness variation can be accounted for by the operation of three basic clocks of the periods P1 = 19,000 days, P2 = 1943 days, and P3 = 722 days. These periods can plausibly, and consistently with the observations, be attributed to three physical mechanisms in the system: the working of a solar-like magnetic dynamo cycle in the outer layers of the giant star of the system, the binary orbit cycle, and the sidereal rotation cycle of the giant star. MWC 560 is the seventh symbiotic star with historical light curves that reveal similar basic characteristics of the systems. The light curves of all these stars are well interpreted on the basis of the current understanding of the physical processes that are the major sources of the optical luminosity of these symbiotic systems.

79 ASTRONOMY AND ASTROPHYSICS↗

Binary Power Plant CO2 Life Cycle Emissions Including Isobutane Fugitive Emission

Geothermal energy production has one of the lowest life cycle CO2 emission factors (~ 15 g-CO2/kWh) for plants producing electricity (Hondo, 2005). This life cycle factor includes indirect emissions from plant construction as well as ongoing operations such as additional well drilling and equipment replacement. Not included in this calculation are direct emissions from geothermal power production. Geothermal flash plants emit CO2 at rates related to the reservoir concentration. Binary plants report “near zero” emissions of high global warming potential gases because of their closed loop system design. Binary plants use working fluids to drive the turbine generators and leakage of these working fluids have not yet been quantified. To assess the working fluid emissions from geothermal power production using an Organic Rankine Cycle, reported isobutane emissions were accessed for 3 California binary plants from the Great Basin Unified and Imperial County Air Pollution Control Districts as well as the California Air Resource Board. Each binary plant used in this study has been operating for more than 25 years. From the data, two types of isobutane emissions were accounted for over a 15 month period: ‘normal’ equipment leakage and equipment breakdown emissions. This preliminary analysis of working fluid emissions from these plants suggest that if a binary plant has equipment failures, the majority of the isobutane releases can be due to these events. The results indicate that a well maintained binary plant releases approximately 0.13 g-Isobutane/kWh where as a plant with equipment failures releases approximately 6 g-Isobutane/kWh. Assuming a greenhouse warming potential of 3 for isobutane, these emission values become 0.4 and 18 g-CO2e/kWh (where CO2e is the CO2 equivalent effect). The direct operation isobutane leakage for a well maintained binary plant does not significant increase the life cycle CO2 emission factor whereas a plant with significant equipment issues can effectively double the life cycle CO2 emissions. This limited data set suggests that when direct CO2e fugitive emission are add to the indirect CO2 emissions, the total CO2 emissions from binary power plants are equivalent or less than nuclear, as well as other renewables power production such as wind and solar.

15 GEOTHERMAL ENERGY↗

Energy 101 Geothermal [Slides]

The Energy 101: Geothermal presentation, developed for the Energy Technology Innovation Partnership Project (ETIPP), provides an overview of geothermal energy. It covers fundamental concepts, technologies, considerations, case studies, and additional resources.

15 GEOTHERMAL ENERGY↗