Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation

As modern power systems are experiencing exceptional changes with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system could obtain high system resilience by not relying on the bulk power system restoration, which requires significant human intervention and procedure. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and the technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by- phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and startup behaviors as well as network dynamics. In addition, active involvement of grid- following distributed energy resources is also studied to facilitate the black-start process. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, we demonstrate that a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start, using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation: Preprint

As the modern power systems are experiencing exceptional changes with increasing penetration of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system would obtain high system resilience, by not relying on the bulk power system restoration requiring significant human intervention and procedure to restore. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and start-up behaviors as well as network dynamics. In addition, active involvement of grid-following distributed energy resources (DER) is also studied to facilitate the black start process. It is shown that, by allowing multiple GFM inverters to collectively black start without master-slave coordination, a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Parallel Grid-Forming Inverter-Driven Black Start: Power-Hardware-in-the-Loop Validation: Preprint

With power systems encountering increasing deployment levels of inverter-based resources (IBRs), system restoration using grid-forming (GFM) IBRs has gained attention. Engineered to establish grid voltages in the absence of a stiff grid, black-start-capable GFM IBRs are expected to enhance power system resilience by playing a critical role in bottom-up system restoration. This paper experimentally studies the feasibility of the novel approach through power-hardware-in-the-loop (PHIL) testing and validation with a commercial GFM inverter. The PHIL test setup demonstrates an inverter-driven black start of a 5-MW unbalanced distribution feeder where two GFM inverters collectively black start the feeder: one is a commercial hardware GFM inverter interacting through the PHIL interface, and the other is a software GFM emulated by a real-time simulation with full electromagnetic transient (EMT) models. Both GFM inverters are equipped with negative-sequence voltage control to suppress the voltage imbalance resulting from the unbalanced loading, allowing us to study the dynamic interactions between the GFMs with their control parameters unknown. To evaluate the dynamic behavior of the GFM inverters under the entire black-start process, the EMT model of the distribution system details the transformer and motor dynamics to emulate their inrush and startup behaviors. It abstracts conventional grid-connected inverter dynamics, i.e., grid-following inverters. Oscilloscope measurements of the hardware GFM inverter are also presented for critical steps. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Autonomous Restoration of Networked Microgrids Using Communication-Free Smart Sensing and Protection Units

Here this paper presents autonomous restoration of networked microgrids using distributed energy resources (DERs), inverter-based resources (IBRs) in general, and controllable assets of intelligence without communication to achieve a extremely resilient power system restoration. The main innovation of this work lies in use of real-time smart sensing and decision making that enable autonomous recombination of islanded microgrids, which are individually black-started by local grid-forming (GFM) inverter units. The smart circuit breakers (SCBs) designed and demonstrated here play critical roles in the restoration process to achieve autonomy; the autonomous restoration scheme is not pre-engineered and may be subject to encounter overloading, live or downed segments as the boundary of the microgrids dynamically expands without prior knowledge and only with local measurement. We demonstrate autonomous microgrid restoration both in simulation of a modified IEEE 13-bus system, and in a hardware testbed comprising 24 GFM-IBRs and 6-SCBs, depicting several scenarios to evaluate their functionalities and interoperability. This work validates high potential of extremely resilient microgrid using novel approaches for inverter-based bottom-up system restoration in a communication-free paradigm.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters

This paper examines state-of-the-art microgrid (MG) black-start technologies with grid-forming (GFM) inverter-based resources (IBRs) and proposes black start and interconnection methods for 100% inverter-based MGs. A multiple-MG approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units that enable the autonomous synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and distribution system operators for next-generation, multi-MG, GFM inverter-based, black-start procedures.

black start↗

Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters: Preprint

This paper examines state-of-the-art microgrid (MG) black-start technologies with high IBR penetrations and proposes black-start and interconnection methods for 100% grid-forming (GFM) inverter-based MGs. A multiple-microgrid approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units called "synchrobreakers," which enable the synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters with ideal voltage sources. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and DSOs for the next-generation GFM inverter-based multi-MG black-start procedures.

black start↗

Black-Starting Microgrids Using Inverter-Based Distributed Energy Resources

Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.

black start↗

Small Hydro Power Plants with Integrated BESS for Enhance Resiliency

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a black start- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFM controlled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of Power System Black Start with Hydropower Generator and Battery Energy Storage: Preprint

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a blackstart- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFMcontrolled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Confinement-Driven Segregation Enables Glassy Polymer Hybrid Materials Featuring Disordered Hyperuniformity and Integrated Self-Healing

The blending of glassy copolymer-brush modified colloids with a viscoelastic linear copolymer featuring intrinsic self-healing enabled disordered hyperuniform hybrid materials that combined mechanical robustness with structural color, processability, environmental stability, and the ability to recover structure and properties after incurring physical damage via ‘integrated self-healing’. Symmetric linear n-butyl acrylate/methyl methacrylate (BA/MMA) were co-assembled with asymmetric glassy BA/MMA statistical copolymer brush (silica) particles. ‘Confinement-driven segregation’ resulted in a microphase-separated morphology in which the linear copolymer resided within the interstitial regions of a rigid (∼1 GPa) copolymer brush particle template with disordered hyperuniform microstructure. Diffusion of the self-healing copolymer additive into damage regions drove the recovery after damage, along with the restoration of structural color due to the materials hyperuniform microstructure. The synergistic action of intrinsic and extrinsic healing mechanisms could provide a versatile platform for the bottom-up fabrication of multifunctional hybrid materials with increased damage resistance and functional longevity.

36 MATERIALS SCIENCE↗

Revising Apetrei’s bounding volume hierarchy construction algorithm to allow stackless traversal

Stackless traversal is a technique to speed up range queries by avoiding usage of a stack during the tree traversal. One way to achieve that is to transform a given binary tree to store a left child and a skip-connection (also called an escape index). In general, this operation requires an additional tree traversal during the tree construction. For some tree structures, however, it is possible to achieve the same result at a reduced cost. We propose one such algorithm for a GPU hierarchy construction algorithm proposed by Karras in Karras 2012. Furthermore, we show that our algorithm also works with the improved algorithm proposed by Apetrei in Apetrei 2014, despite a different ordering of the internal nodes. We achieve that by modifying Apetrei’s algorithm to restore the original Karras’ ordering of the internal nodes. Using the modified algorithm, we show how to construct a hierarchy suitable for a stackless traversal in a single bottom-up pass.

97 MATHEMATICS AND COMPUTING↗

Super-resolution imaging reveals resistance to mass transfer in functionalized stationary phases

Chemical separations are costly in terms of energy, time, and money. Separation methods are optimized with inefficient trial-and-error approaches that lack insight into the molecular dynamics that lead to the success or failure of a separation and, hence, ways to improve the process. We perform super-resolution imaging of fluorescent analytes in five different commercial liquid chromatography materials. Unexpectedly, we observe that chemical functionalization can block more than 50% of the material’s porous interior, rendering it inaccessible to small-molecule analytes. Only in situ imaging unveils the inaccessibility when compared to the industry-accepted ex situ characterization methods. Selectively removing some of the functionalization with solvent restores pore access without substantially altering the single-molecule kinetics that underlie the separation and agree with bulk chromatography measurements. Our molecular results determine that commercial “fully porous” stationary phases are over-functionalized and provide an alternative avenue to characterize and direct separation material design from the bottom-up.

Science & Technology - Other Topics↗

Regional Power System Black Start with Run-of-river Hydropower Plant and Battery Energy Storage

Battery energy storage systems (BESSs) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various critical services to the power grid. This paper presents the real-world experience of using a megawatt-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to restore a regional power system. To demonstrate this, we carry out power-hardware-in-the-loop experiments integrating an actual GFL- or GFM-controlled BESS and a load bank. Both the simulation and experimental results presented in this paper show the different roles of GFL- or GFM-controlled BESS in power system black starts. The results provide further insight for system operators on how GFL- or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS. The results show that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method, thus enhancing the system resiliency and robustness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validating Greater Sage-Grouse Individual-based Model (IBM) Tool (Final Report)

The project focused on validating the previously developed Greater Sage-Grouse Individual-based Model (GrSG IBM; LaGory et al. 2012, 2021). The objective was to transform this predictive, spatially and temporally explicit model into a portable resource to assist siting/resource managers in proactively assessing the cumulative impacts of wind energy development on the greater sage-grouse. Utilizing a bottom-up, individual-based approach, the GrSG IBM accounts for landscape context and species behavior, aiming to reduce uncertainty in estimating development impacts and support ecologically mindful land-based wind energy development. The validation effort covered approximately 6,540 km 2 near the Seven Mile Hill Wind Project in Wyoming. The GrSG IBM tool, built on the NetLogo platform (Tisue and Wilensky 2004), was executed over a 50-year period, with the analysis focusing on years following a 10-year initialization phase. Key results demonstrated the tool’s biological soundness across five key biological metrics: non-chick age class distribution (older than 10 weeks), adult sex ratio, life expectancy, population size, and overall population growth. For instance, the tool estimated that 58.6% of the non-chick population was reproductively immature, while the reference ranges from 51.4% to 57.8% (Patterson 1952, Rogers 1964). Experts confirmed the tool’s estimate was within a reasonable range for the species. The tool estimated average life expectancy of 1.43 years, while the reference ranges from 0.9 years to 1.1 years (Ammann 1957, Hamerstrom 1949). Experts also supported the model’s life-expectancy estimate as ecologically sound for the species in the study area. In terms of population change, the model estimated an annual shift between a 0.6% decline and a 1.0% increase over 50 years. While the reference suggests 2.9% annual decline in range-wide populations (Cortes et al. 2023), that includes many at-risk populations in South Dakota and Washington, for example. Our study area—in the northeastern part of Carbon County and western-edge of Albany County, Wyoming—is one of the remaining greater sage-grouse habitats supporting some of the most stable populations. Experts confirmed that the range of the annual population change spanning from a 0.6% decline to a 1.0% increase estimated by the tool was reasonable for our study area for this reason and confirmed that aligned with population estimates from existing studies on the greater sage-grouse and wind energy development in the study area (LeBeau et al. 2017a, Smith et al. 2024). Furthermore, the project showed that temporally explicit biological metrics generated by the GrSG IBM tool can complement the USGS’ Prioritizing Restoration of Sagebrush Ecosystems Tool (PReSET; Duchardt et al. 2021) by incorporating habitat restoration strategies into seasonal habitat suitability models to visualize population responses over time.

17 WIND ENERGY↗