Search NASA⌕ Search

SEARCH · Search NASA

Results for “boulder”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

Efficacy of one-time rotenone application for Westslope Cutthroat Trout restoration in Boulder Creek, Montana

Abstract Objective Although piscicides are an important tool for native fish management, our understanding of native fish population dynamics posttreatment (i.e., in putatively vacant habitat) is limited. Methods Here, we describe long-term trends in size and abundance of Cutthroat Trout Oncorhynchus clarkii in Lower Boulder Lake and Boulder Creek (Montana). Result No significant differences were found before and after treatment with rotenone in mean length and population density in Boulder Creek. Posttreatment genetic samples from Boulder Lake and upper Boulder Creek consisted entirely of the Westslope Cutthroat Trout Oncorhynchus clarkii lewisi used to refound the population. Middle and lower Boulder Creek genetic samples contained 99.4% and 98.4% Westslope Cutthroat Trout, indicating that some nonnative (Yellowstone Cutthroat Trout Oncorhynchus clarkii bouvieri hybrid) fish survived the treatment. Population demographics showed robust recovery posttreatment; however, genetic results revealed the limitations of a one-time treatment—that is, an incomplete fish kill. Conclusion We demonstrate that Cutthroat Trout populations achieve recovery after rotenone treatment in the long term, but one-time rotenone treatments on large drainages often fail to totally eradicate populations. Therefore, managers should plan on multiple treatments and utilize environmental DNA to help achieve total removal of target species.

Lampton, Jared↗

High-speed Boulders and the Debris Field in DART Ejecta

On 2022 September 26 the Double Asteroid Redirection Test (DART) spacecraft collided with Dimorphos, the moon of the near-Earth asteroid 65803 Didymos, in a full-scale demonstration of a kinetic impactor concept. The companion Light Italian Cubesat for Imaging of Asteroids (LICIACube) spacecraft documented the aftermath, capturing images of the expansion and evolution of the ejecta from 29 to 243 s after the impact. We present results from our analyses of these observations, including an improved reduction of the data and new absolute calibration, an updated LICIACube trajectory, and a detailed description of the events and phenomena that were recorded throughout the flyby. One notable aspect of the ejecta was the existence of clusters of boulders, up to 3.6 m in radius, that were ejected at speeds of up to 52 m s −1 . Our analysis of the spatial distribution of 104 of these boulders suggests that they are likely the remnants of larger boulders shattered by the DART spacecraft in the first stages of the impact. The amount of momentum contained in these boulders is more than 3 times that of the DART spacecraft, and it is directed primarily to the south, almost perpendicular to the DART trajectory. Recoil of Dimorphos from the ejection of these boulders has the potential to change its orbital plane by up to a degree and to impart a non-principal-axis component to its rotation state. Damping timescales for these phenomena are such that the Hera spacecraft, arriving at the system in 2026, should be able to measure these effects.

asteroid dynamics↗

Origin and composition of three heterolithic boulder- and cobble-bearing deposits overlying the Murray and Stimson formations, Gale Crater, Mars

Heterolithic, boulder-containing, pebble-strewn surfaces occur along the lower slopes of Aeolis Mons (“Mt. Sharp”) in Gale crater, Mars. They were observed in HiRISE images acquired from orbit prior to the landing of the Curiosity rover. The rover was used to investigate three of these units named Blackfoot, Brandberg, and Bimbe between sols 1099 and 1410. These unconsolidated units overlie the lower Murray formation that forms the base of Mt. Sharp, and consist of pebbles, cobbles and boulders. Blackfoot also overlies portions of the Stimson formation, which consists of eolian sandstone that is understood to significantly postdate the dominantly lacustrine deposition of the Murray formation. Blackfoot is elliptical in shape (62 x 26 m), while Brandberg is nearly circular (50 x 55 m), and Bimbe is irregular in shape, covering about ten times the area of the other two. The largest boulders are 1.5–2.5 m in size and are interpreted to be sandstones. As seen from orbit, some boulders are light-toned and others are dark-toned. Rover-based observations show that both have the same gray appearance from the ground and their apparently different albedos in orbital observations result from relatively flat skyfacing surfaces. Chemical observations show that two clasts of fine sandstone at Bimbe have similar compositions and morphologies to nine ChemCam targets observed early in the mission, near Yellowknife Bay, including the Bathurst Inlet outcrop, and to at least one target (Pyramid Hills, Sol 692) and possibly a cap rock unit just north of Hidden Valley, locations that are several kilometers apart in distance and tens of meters in elevation. These findings may suggest the earlier existence of draping strata, like the Stimson formation, that would have overlain the current surface from Bimbe to Yellowknife Bay. Compositionally these extinct strata could be related to the Siccar Point group to which the Stimson formation belongs.

58 GEOSCIENCES↗

Concentration-discharge relationships during an extreme event: Contrasting behavior of solutes and changes to chemical quality of dissolved organic material in the Boulder Creek Watershed during the September 2013 flood: SOLUTE FLUX IN A FLOOD EVENT

During the week of September 10-17, 2013, close to 20 inches of rain fell across Boulder County, Colorado, USA. This rainfall represented a 1000-year event that caused massive hillslope erosion, landslides, and mobilization of sediments. The resultant stream flows corresponded to a 100-year flood. For the Boulder Creek Critical Zone Observatory (BC-CZO), this event provided an opportunity to study the effect of extreme rainfall on solute concentration-discharge relationships and biogeochemical catchment processes. We observed base cation and dissolved organic carbon (DOC) concentrations at two sites on Boulder Creek following the recession of peak flow. We also isolated three distinct fractions of dissolved organic matter (DOM) for chemical characterization. At the upper site, which represented the forested mountain catchment, the concentrations of the base cations Ca, Mg and Na were greatest at the peak flood and decreased only slightly, in contrast with DOC and K concentrations, which decreased substantially. At the lower site within urban corridor, all solutes decreased abruptly after the first week of flow recession, with base cation concentrations stabilizing while DOC and K continued to decrease. Additionally, we found significant spatiotemporal trends in the chemical quality of organic matter exported during the flood recession, as measured by fluorescence, 13C-NMR spectroscopy, and FTICR-MS. Similar to the effect of extreme rainfall events in driving landslides and mobilizing sediments, our findings suggest that such events mobilize solutes by the flushing of the deeper layers of the critical zone, and that this flushing regulates terrestrial-aquatic biogeochemical linkages during the flow recession.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluation of Boulder, CO, SmartRegs Ordinance and Better Buildings Program

Under the SmartRegs ordinance in the city of Boulder, Colorado, all rental properties in the city must achieve an energy efficiency level comparable to a HERS Index of approximately 120 points or lower by the year 2019. The City of Boulder received a $12 million grant from the DOE’s Better Buildings initiative to create and incentivize their EnergySmart Program. In this report, the Consortium for Advanced Residential Buildings (CARB) describes its work with the program, including energy audits of rental properties, developing training programs for insulators and inspectors, and conducting interviews with property owners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Interdependencies and Risk to People and Critical Food, Energy, and Water Systems: 2013 Flood, Boulder, Colorado, USA

Abstract This paper examines the interdependencies mediating the cascading negative consequences triggered by the September 2013 flood, in Boulder, Colorado, USA. By illustrating the risks to people and critical food‐energy‐water systems of a low probability, high‐impact event, we draw lessons on what is likely to occur in the future. Other scholars have modeled the influence of interdependent infrastructures on cascading effects. But this is one of the first studies integrating stakeholders' understanding of the influence of interdependent actions, institutions, and infrastructures. These interdependencies create the conditions for vulnerability, which is a product of multiscale and dynamic sociodemographic, economic, technologic, environmental, and governance interactions. Political histories and historical decisions on where and how to design infrastructure exert a deep influence on short‐ and long‐term capacity to manage risk. Boulder's high socio‐institutional and learning capacity, while key, is not enough to influence integrative, transformative changes. Contrary to current approaches to nexus thinking, the regimes in which emergency and recovery actions are embedded are dynamically stable, thus imposing a logic for incremental change along established pathways of understanding and action. Our study offers some lessons on the challenges of bringing together diverse sectoral and jurisdictional sectors during and after an extreme event.

Romero‐Lankao, Patricia↗

Meeting report for the 1st skin microbiota workshop, Boulder, CO, October 15-16, 2012

This report details the outcome of the 1st Skin Microbiota Workshop, Boulder, CO, held on October 15th-16th 2012. The workshop was arranged to bring Department of Defense personnel together with experts in microbial ecology, human skin physiology and anatomy, and computational techniques for interrogating the microbiome to define research frontiers at the intersection of these important areas. The workshop outlined a series of questions and created several working groups to address those questions, specifically to promote interdisciplinary activity and potential future collaboration. The US Army provided generous grant support and the meeting was organized and hosted by the University of Colorado at Boulder. A primary forward vision of the meeting was the importance of understanding skin microbial communities to improve the health and stealth of US Army warfighters.

59 BASIC BIOLOGICAL SCIENCES↗

AmeriFlux US-UR1 Boulder - UCRB

This is the AmeriFlux version of the carbon flux data for the site US-UR1 Boulder - UCRB. Site Description - This site is located in Boulder, Wyoming, in a high-altitude grassland ecosystem. The region experiences cold winters and mild summers, with relatively low precipitation throughout the year. Snowfall is common during the winter months, contributing to the seasonal water availability. The landscape is primarily covered by grass vegetation, with some areas supported by a center pivot irrigation system, which helps sustain plant growth in the dry environment.

Neale, C. U. [Daugherty Water for Food Global Inst↗

Evaluation of Boulder, CO, SmartRegs Ordinance and Better Buildings Program

Under the SmartRegs ordinance in the city of Boulder, Colorado, all rental properties in the city must achieve an energy efficiency level comparable to a HERS Index of approximately 120 points or lower by the year 2019. The City of Boulder received a $\$$12 million grant from the DOE's Better Buildings initiative to create and incentivize their EnergySmart Program. In this report, the Consortium forAdvanced Residential Buildings (CARB) describes its work with the program, including energy audits of rental properties, developing training programs for insulators and inspectors, and conducting interviews with property owners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of a Multifamily Retrofit in Climate Zone 5, Boulder, Colorado (Fact Sheet)

In 2009, a 37-unit apartment complex located in Boulder, Colorado, underwent an energy retrofit to comply with Boulder SmartRegs Ordinance, a mandate that requires all rental properties to meet certain energy efficiency standards by 2018. The Consortium of Advanced Residential Buildings (CARB), a U.S. Department of Energy Building America team, worked with city planners and building owners to evaluate this program and recently completed a case study evaluating the effectiveness of a collection of retrofit measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Predicted Versus Actual Savings for a Low-Rise Multifamily Retrofit in Boulder, Colorado

To determine the most cost-effective methods of improving buildings, accurate analysis and prediction of the energy use of existing buildings is essential. However, multiple studies confirm that analysis methods tend to over-predict energy use in poorly insulated, leaky homes and thus, the savings associated with improving those homes. In NREL's report titled 'Assessing and Improving the Accuracy of Energy Analysis of Residential Buildings,' researchers propose a method for improving the accuracy of residential energy analysis methods. A key step in this process involves the comparisons of predicted versus metered energy use and savings. In support of this research need, CARB evaluated the retrofit of a multifamily building in Boulder, CO. The updated property is a 37 unit, 2 story apartment complex built in 1950, which underwent renovations in early 2009 to bring it into compliance with Boulder, CO's SmartRegs ordinance. Goals of the study were to: 1) evaluate predicted versus actual savings due to the improvements, 2) identify areas where the modeling assumptions may need to be changed, and 3) determine common changes made by renters that would negatively impact energy savings. In this study, CARB seeks to improve the accuracy of modeling software while assessing retrofit measures to specifically determine which are most effective for large multifamily complexes in the cold climate region. Other issues that were investigated include the effects of improving building efficiency on tenant comfort, the impact on tenant turnover rates, and the potential market barriers for this type of community scale project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Predicted Versus Actual Savings for a Low-Rise Multifamily Retrofit in Boulder, Colorado

To determine the most cost-effective methods of improving buildings, accurate analysis and prediction of the energy use of existing buildings is essential. However, multiple studies confirm that analysis methods tend to over-predict energy use in poorly insulated, leaky homes and thus, the savings associated with improving those homes. In this project, the Building America CARB team evaluated the retrofit of a multifamily building in Boulder, CO. The updated property is a 37 unit, 2 story apartment complex built in 1950, which underwent renovations in early 2009 to bring it into compliance with Boulder, CO's SmartRegs ordinance. Goals of the study were to: 1) evaluate predicted versus actual savings due to the improvements, 2) identify areas where the modeling assumptions may need to be changed, and 3) determine common changes made by renters that would negatively impact energy savings. Other issues that were investigated include the effects of improving building efficiency on tenant comfort, the impact on tenant turnover rates, and the potential market barriers for this type of community scale project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Existing Whole-House Solutions Case Study: Evaluation of a Multifamily Retrofit in Climate Zone 5, Boulder, Colorado

In 2009, a 37-unit apartment complex located in Boulder, Colorado, underwent an energy retrofit to comply with Boulder SmartRegs Ordinance, a mandate that requires all rental properties to meet certain energy efficiency standards by 2018. The Consortium of Advanced Residential Buildings (CARB), a U.S. Department of Energy Building America team, worked with city planners and building owners to evaluate this program and recently completed a case study evaluating the effectiveness of a collection of retrofit measures.

apartments↗

Boulder Wind Power Advanced Gearless Drivetrain: Cooperative Research and Development (Final Report)

The Boulder Wind Power (BWP) Advanced Gearless Drivetrain Project explored the application of BWP's innovative, axial-gap, air-core, permanent-magnet direct-drive generator in offshore wind turbines. The objective of this CRADA is to assess the benefits that result from reduced towerhead mass of BWP's technology when used in 6 MW offshore turbines installed on a monopile or a floating spar foundation.

17 WIND ENERGY↗

Solar Row Zero Energy Townhomes - Boulder, CO

Wonderland Development has constructed a new "near zero energy" row home design in North Boulder consisting of 9 units: one 5-plex and two duplexes. NREL has performed short-term tests and installed long-term monitoring equipment in three of these units. Two of these units used a solar thermal combi system with a boiler for radiant space heating and water heating and mini-split system for space conditioning. The third unit used a high efficiency tank water heater for space heating. In addition to studying the overall performance of the homes, one unit was used for a detailed study on hot water draws at each fixture. Several reports and presentations were produced on this project, however, due to shifting funding and staffing priorities, a comprehensive final report for this project was never completed. This dataset contains a wealth of raw and analyzed data and several unpublished reports.

Array↗

Boulder damage symposium annual thin film laser damage competition

Optical instruments and laser systems are often fluence-limited by multilayer thin films deposited on the optical surfaces. When comparing publications within the laser damage literature, there can be confusing and conflicting laser damage results. This is due to differences in testing protocols between research groups studying very different applications. In this series of competitions, samples from multiple vendors are compared under identical testing parameters and a single testing service. Unlike a typical study where a hypothesis is tested within a well-controlled experiment with isolated variables, this competition isolates the laser damage testing variables so that trends can be observed between different deposition processes, coating materials, cleaning techniques, and multiple coating suppliers. The resulting series of damage competitions has also been designed to observe general trends of damage morphologies and mechanisms over a wide range of coating types (high reflector and antireflector), wavelengths (193 to 1064 nm), and pulse lengths (180 fs to 13 ns). A double blind test assured sample and submitter anonymity were used in each of the competitions so only a summary of the deposition process, coating materials, layer count and spectral results are presented. Laser resistance was strongly affected by substrate cleaning, coating deposition method, and coating material selection whereas layer count and spectral properties had minimal impact.

42 ENGINEERING↗