Search NASA⌕ Search

SEARCH · Search NASA

Results for “building contamination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Use of Source Term and Air Dispersion Modeling in Planning Demolition of Highly Alpha-Contaminated Buildings

The current cleanup of structures related to cold-war production of nuclear materials includes the need to demolish a number of highly alpha-contaminated structures. The process of planning for the demolition of such structures includes unique challenges related to ensuring the protection of both workers and the public. Pre-demolition modeling analyses were conducted to evaluate potential exposures resulting from the proposed demolition of a number of these structures. Estimated emission rates of transuranic materials during demolition are used as input to an air-dispersion model. The climatological frequencies of occurrence of peak air and surface exposures at locations of interest are estimated based on years of hourly meteorological records. The modeling results indicate that downwind deposition is the main operational limitation for demolition of a highly alpha-contaminated building. The pre-demolition modeling directed the need for better contamination characterization and/or different demolition methods—and in the end, provided a basis for proceeding with the planned demolition activities. Post-demolition modeling was also conducted for several contaminated structures, based on the actual demolition schedule and conditions. Comparisons of modeled and monitoring results are shown. Recent monitoring data from the demolition of a UO3 plant shows increments in concentrations that were previously identified in the pre-demolition modeling predictions; these comparisons confirm the validity and value of the pre-demolition source-term and air dispersion computations for planning demolition activities for other buildings with high levels of radioactive contamination.

air exposure↗

Autonomous Radiation Survey Inside Contaminated Buildings at Fukushima Daiichi with the Riser UAV - 18299

Nuclear decommissioning is constrained and defined by radiation and radioactive contamination. Where radiation is high and its distribution is unknown simply gathering the data needed for project planning can become a challenge. Fukushima Daiichi epitomises this challenge. The complex sequence of events at the plant following the March 2011 earthquake and tsunami has resulted in extensive physical damage and an essentially unpredictable distribution of contamination. TEPCO have applied a range of manual and robotics techniques to map the status of the plant, but many significant areas have remained no-go zones due to a combination of high radiation, physical hazards and obstacles. Further, even in areas where manual survey is feasible, there is strong desire to minimise human exposure to radiation by deploying robots where possible. Riser is a fully autonomous UAV equipped with an infrastructure-free 3D navigation and mapping system, inspection cameras and a CZT spectrometric measurement capability. The system has been custom designed specifically to meet the needs of the nuclear inspection. Riser is capable of accessing areas with dose rates of hundreds of milli-sievert per hour and producing 3D models and radiation surveys with accurately located data points. The data from Riser can subsequently be fused using Createc's N-Visage engine to produce three-dimensional contamination maps which can be used for predictive modelling of future D and D activity. Riser has been deployed at Fukushima Daiichi since March 2017. We present examples of data and analysis outputs, as well as general learning about deploying autonomous robots at a nuclear site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Numerical Study of Water Ice and Molecular Contamination Build Up during JWST Deployment

This paper summarizes a recent numerical analysis of water vapor and volatile condensible material deposition on the James Webb Space Telescope from the initial orbit insertion up to 180 days post launch. The analysis utilized 17 distinct geometry files capturing observatory configuration changes during the deployment. Surface temperature was set from a time-dependent thermal analysis solution. A vapor pressure model was used to calculate the net water ice adsorption. Molecular contamination included a contribution from UV photopolymerization. The analysis predicted levels of ice and molecular accumulation were found to be within the allowable limits specified by the observatory contamination control plan.

James Webb Space Telescope↗

Numerical Study of Water Ice and Molecular Contamination Build Up during JWST Deployment

This paper summarizes a recent numerical analysis of water vapor and volatile condensible material deposition on the James Webb Space Telescope from the initial orbit insertion up to 180 days post launch. The analysis utilized 17 distinct geometry files capturing observatory configuration changes during the deployment. Surface temperature was set from a time-dependent thermal analysis solution. A vapor pressure model was used to calculate the net water ice adsorption. Molecular contamination included a contribution from UV photopolymerization. The analysis predicted levels of ice and molecular accumulation were found to be within the allowable limits specified by the observatory contamination control plan.

James Webb Space Telescope↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 19217

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of 130 mSv/hr. Soil Contamination Under a Hot Cell - 17301

Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently engineering a system to safely remove and dispose of highly contaminated soil underneath Building 324 located adjacent to the Columbia River on the Hanford Site in Washington State. Cleaning up the waste site will allow for the eventual demolition of the building, which is a top priority for DOE and CH2M due to the proximity of the Columbia River and City of Richland. Building 324 at Hanford was originally constructed in 1966 and was operated for a number of years serving various missions. One of the missions involved development of treatment processes for liquid high activity waste. As of result of one particular mission, liquid high activity waste was spilled in one of the building's hot cells (known as 'B' Cell) and the liquid leaked from a breach in a sump and through construction joints in the hot cell floor and into the soil. Sampling efforts using borehole technology revealed significant under-building contamination with dose rates measuring has high as 130 mSv/hr (13,000 R/hr.). The Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) between the Washington State, Department of Ecology (Ecology), the U.S. Environmental Protection Agency and the DOE has established a 2021 milestone for demolition and removal of the Building 324. Before building demolition can be undertaken, the highly contaminated soil must be removed from beneath the hot cell while the hot cell structure remains in place to provide shielding and containment during the soil remediation. CH2M will fabricate and install remotely operated equipment that will remove debris and grout in the cell, the floor of the hot cell, and the contaminated soil beneath the hot cell and package that soil for disposal. To ensure that the structure remains intact and does not shift during soil removal, support for the building structure must also be constructed as a prerequisite for the planned work. CH2M will use a full-scale mock-up of the Building 324 B Cell and airlock area to assist in the testing of the remotely operated equipment and the training of the soil removal team in a contamination-free environment to ensure efficient and safe performance of the challenging work of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thinking Inside the Box: A Hands-on Student Activity for Building a Contamination Containment Glovebox to Encourage Problem Solving in a Collaborative Environment

Engineers from the National Aeronautics and Space Administration (NASA) and education experts from the Virginia Space Grant Consortium (VSGC) partnered together to create a hands-on student activity to teach students about problem solving, working in a collaborative environment, and about the unique career fields of contamination control and planetary protection. The activity focuses on contamination containment gloveboxes, which are sealed containers where operators outside the glovebox can safely manipulate hazardous or contamination-sensitive materials inside the glovebox through glove ports on the container. The activity utilizes common household materials and teams of students work together to design and build a glovebox using the materials provided. Once the glovebox has been constructed, students perform a task under a time constraint by using their glovebox to assemble a puzzle “contaminated” with corn starch. In a post-activity debrief, teams discuss lessons learned such as how the actual built glovebox differed from the sketched design, the challenge of managing a budget for materials, how the team dealt with surprises, and if their glovebox allowed enough room for the operator to perform the task. This activity has been part of VSGC’s Virginia Earth System Science Scholars (VESSS) summer academy program for high school students since 2016, and has been an engaging method to teach students teamwork, creativity, hands-on experimentation, communication, and reasoning skills while also teaching them about unique engineering fields such as contamination control and planetary protection.

Student activity↗

User's Manual for RESRAD-BUILD Code Version 4: Vol. 2 - User's Guide for RESRAD-BUILD Code Version 4

The RESRAD-BUILD computer code is designed to assess radiological doses to individuals who live or work in a building contaminated with radioactive material. The code is equipped with a user-friendly interface that has many features to facilitate using the computer code and understanding the results. The design of the interface provides various options, from entering data and performing calculations to displaying calculation results. General and context-specific help are available, providing information on editing and viewing the radionuclide database, the definitions of input parameters and their use in the calculations, and the selection of the calculation results for placement into other applications. Two types of sensitivity analysis are supported by the code, i.e., deterministic and probabilistic, that can be used to study the influence of input parameters on the calculation results. This user’s guide provides instructions to help users on how to install the RESRAD-BUILD code, navigate the interface, and use the various features to set up a dose/risk analysis and to view/print the results in text and graphical outputs.

61 RADIATION PROTECTION AND DOSIMETRY↗

Thinking Inside the Box: A Hands-On Student Activity for Building a Contamination Containment Glovebox to Encourage Problem Solving in a Collaborative Environment

Contamination containment gloveboxes are sealed containers where operators outside the glovebox can safely manipulate hazardous or contamination-sensitive materials inside the glovebox through glove ports on the container. Containment gloveboxes are used in the space industry to study sample materials returned from space such as lunar, asteroid, and comet materials, to manufacture sensitive instruments and space ight hardware, and to perform contamination-sensitive experiments. A hands-on activity has been developed by contamination control engineer and STEM education experts as part of the Virginia Earth System Science Scholars (VESSS) summer academy program to teach high school students about gloveboxes and about problem solving in a collaborative environment. In this activity, student teams are given a list of common household materials (e.g. plastic bags, plastic straws, aluminum foil, tape, disposable gloves, etc.) for building their own glovebox. Students work together to sketch and design their glovebox before being provided a kit of materials, which they must purchase along with any extra materials with a mock team budget. They are given 30 minutes to build their glovebox, however, they do not know what will be placed inside the glovebox or what operations they will need to perform within the glovebox. At the end of the build time, teams are given a small, sealed paper envelope which they place in the glovebox. Each team selects a team member to be designated as the operator, and the operator places their hands in the gloves of the glovebox. The operator uses their gloves to open the envelope in the glovebox, and they discover they have 20 minutes to assemble a jigsaw puzzle. However, the puzzle is \contaminated" with talcum powder. After the 20 minute time period, teams are judged on how well they completed and cleaned the contaminated puzzle. In a post-activity debrief, teams discuss lessons learned such as how the actual built box di ered from the sketched design, the challenge of managing a budget for materials, how the team dealt with surprises, and if their glovebox allowed enough room for the operator to perform the task. This activity has been part of the VESSS summer academy since 2016, and teaches students teamwork, creativity, hands-on experimentation, communication, and reasoning skills. In a demonstration at IAC, a volunteer from the audience will be chosen to assemble a glovebox during the presentation using the same kit of materials and will demonstrate handling puzzle pieces in the completed glovebox.

Elaine Seasly↗

User’s Manual for RESRAD-BUILD Code V.4: Vol. 1 – Methodology and Models Used in RESRAD-BUILD Code

The RESRAD-BUILD computer code models radionuclide release and transport in indoor environments and performs pathway analyses to evaluate the potential radiological dose and risk incurred by an individual who works or lives in a building contaminated with radioactive material or housing radioactively contaminated furniture or equipment. The code provides four geometries to characterize a radiation source: point, line, area, and volume, in which radionuclides are homogeneously distributed. Radionuclides contained in a source are considered to be released to the indoor air due to various processes including erosion (mechanically or weathering), diffusion (for tritium and radon in a volume source), or emanation (radon in a point, line, or area source). The release can proceed through different time phases with different rates. In RESRAD-BUILD Version 4.0, a dynamic ventilation model is implemented to simulate the fate and transport of source material particles and radionuclides after their releases. This dynamic ventilation model considers (1) air exchange between rooms in the building and between the rooms and the outdoor environment, (2) deposition from air to floor, (3) resuspension from the floor to the air, and (4) periodical vacuuming that reduces the floor deposition. The fate and transport modeling provides estimates of radionuclide concentrations in the source, in the air, and on the floor at different times, which are then integrated over the exposure duration for the calculation of radiation doses and cancer risks. A single run of the RESRAD-BUILD code can model a building with up to 9 rooms, 10 sources, and 10 receptors. The potential radiation dose and cancer risk incurred by each receptor are calculated for seven exposure pathways: (1) external radiation directly from the sources (accounting for shielding), (2) external radiation from radioactive particles deposited on the floors, (3) external radiation from airborne radionuclides, (4) inhalation of airborne radionuclides, (5) inhalation of radon and radon progenies, (6) inadvertent ingestion of radioactive particles directly from the source, and (7) ingestion of radioactive particles deposited on the floors. Various exposure scenarios can be modeled with RESRAD-BUILD, including but are not limited to, office worker, renovation worker, decontamination worker, building visitor, and resident. Both deterministic and probabilistic analyses can be performed to obtain results in both text reports and graphic displays.

61 RADIATION PROTECTION AND DOSIMETRY↗

Remediation of uranium impacted sediments in a watercourse

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work located in Windsor, Connecticut, USA. Radiological contaminants consisted primarily of high enriched uranium (HEU). Other radionuclides encountered in relatively minor amounts in certain areas of the clean-up included Co-60, Cs- 137, Ra-226, Th-232 and low enriched uranium (LEU).Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Planning Tool for Estimating Waste Generated by a Radiological Incident and Subsequent Decontamination Efforts - 13569

Management of debris and waste from a wide-area radiological incident would probably constitute a significant percentage of the total remediation cost and effort. The U.S. Environmental Protection Agency's (EPA's) Waste Estimation Support Tool (WEST) is a unique planning tool for estimating the potential volume and radioactivity levels of waste generated by a radiological incident and subsequent decontamination efforts. The WEST was developed to support planners and decision makers by generating a first-order estimate of the quantity and characteristics of waste resulting from a radiological incident. The tool then allows the user to evaluate the impact of various decontamination/demolition strategies on the waste types and volumes generated. WEST consists of a suite of standalone applications and Esri{sup R} ArcGIS{sup R} scripts for rapidly estimating waste inventories and levels of radioactivity generated from a radiological contamination incident as a function of user-defined decontamination and demolition approaches. WEST accepts Geographic Information System (GIS) shape-files defining contaminated areas and extent of contamination. Building stock information, including square footage, building counts, and building composition estimates are then generated using the Federal Emergency Management Agency's (FEMA's) Hazus{sup R}-MH software. WEST then identifies outdoor surfaces based on the application of pattern recognition to overhead aerial imagery. The results from the GIS calculations are then fed into a Microsoft Excel{sup R} 2007 spreadsheet with a custom graphical user interface where the user can examine the impact of various decontamination/demolition scenarios on the quantity, characteristics, and residual radioactivity of the resulting waste streams. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Road to 2020: Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA): Cleanup of the East Tennessee Technology Park - 17425

Uranium enrichment activities at the 890-ha (2,200-acre) East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, date back to the World War II Manhattan Project. The site produced nuclear fuel for weapons and reactors for four decades. Because of these operations, ETTP has a legacy of radiologically and chemically contaminated buildings, soil, sediment, and groundwater that required remedial action to reduce the risk to human health and the environment. Since the early 1990's, the DOE Oak Ridge Office of Environmental Management (OREM) has directed the environmental cleanup of this contaminated site through the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) process. Cleanup activities have included the demolition of contaminated facilities and structures, including five gaseous diffusion buildings; remediation of contaminated soils; disposal of associated waste; and treatment of contaminated groundwater. In August 2016, DOE realized its Vision 2016, demolition of all five gaseous diffusion buildings at ETTP. This milestone marked the first time that an entire uranium enrichment complex has been demolished. The landmark cleanup included deactivation and demolition of 418,064 m{sup 2} (4.5 million ft{sup 2}) of radiologically and chemically contaminated facilities, and disposal of more than 55,000 truckloads of debris. Fulfillment of Vision 2016 was a major step toward completing ETTP cleanup by 2020. To attain 2020 cleanup, DOE and its cleanup contractor, URS - CH2M Oak Ridge LLC (UCOR), must complete demolition of the following areas: - Poplar Creek Facilities; - K-731 Switch House; - Building K-1037; - Central Neutralization Facility; - K-1200 Complex; - Toxic Substances Control Act Incinerator facilities; - Balance of Site Facilities. In addition, DOE will complete all remedial actions in accordance with current Records of Decision (RODs); as well as cleanup activities involving surface water, sediment, and groundwater that will be addressed in a final site-wide ROD. All waste, including soils, debris, and rubble from demolition and remediation activities, will be dispositioned. Final cleanup of ETTP further advances DOE's goal for re-industrialization of the site as a private sector industrial park. With risks reduced, hazards removed, and the environment restored, DOE can transfer usable ETTP building and land assets to the community for redevelopment and reuse. A history center, equipment building, viewing tower, and wayside exhibits will tell the story of the site, honoring its contributions to the nation's defense and energy needs. Approximately 1,214 ha (3,000 acres) of adjoining lands, now the Black Oak Ridge Conservation Easement (BORCE), will be used for conservation and recreational purposes, including green-ways and trail systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Remediation Technology Development for Lower East Fork Poplar Creek - FY 2016 Progress Report

Mercury remediation is a high priority for the US Department of Energy (DOE) Oak Ridge Office of Environmental Management (OREM), especially at and near the Y-12 National Security Complex (Y-12) where historical mercury use has resulted in contaminated buildings, soils, and downstream surface waters. To address mercury contamination of East Fork Poplar Creek (EFPC), the DOE has adopted a phased, adaptive management approach to remediation, which includes mercury treatment actions at Y-12 in the short-term and research and technology development (TD) to evaluate longer-term solutions in the downstream environment (US Department of Energy 2014).

54 ENVIRONMENTAL SCIENCES↗

Mercury Remediation Technology Development for Lower East Fork Poplar Creek—FY 2017 Progress Report

Mercury (Hg) remediation is a high priority for the US Department of Energy (DOE) Oak Ridge Office of Environmental Management, especially at and near the Y-12 National Security Complex (Y-12) where historical Hg use has resulted in contaminated buildings, soils, and downstream surface waters. To address Hg contamination of East Fork Poplar Creek (EFPC), DOE has adopted a phased, adaptive management approach to remediation, which includes Hg treatment actions at Y-12 in the short-term and research and technology development (TD) to evaluate longer-term solutions in the downstream environment (US Department of Energy 2014).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗