Search NASASearch

SEARCH · Search NASA

Results for “building operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Environmental projects, volume 11. Environmental assessment: Addition to operations building, Mars site

An Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.

Source record

Building Operations Efficiencies into NASA's Crew Launch Vehicle Design

The U.S. Vision for Space Exploration guides NASA's challenging missions of technological innovation and scientific investigation. With the Agency's commitment to complete the International Space Station (ISS) and to retire the Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in mid 2005 to analyze options for a safer, simpler, more cost efficient launch system that could deliver timely human-rated space transportation capabilities. NASA's finite resources yield discoveries with infinite possibilities. As the Agency begins the process of replacing the Shuttle with new launch vehicles destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo systems for maximum operational efficiencies. This mandate is imperative to reduce the $4.5 billion NASA spends on space transportation each year. This paper gives top-level details of how the follow-on Crew Launch Vehicle (CLV) is being designed for reduced lifecycle costs as a primary catalyst for the expansion of future frontiers.

Dumbacher, Daniel L.

Building Operations Efficiencies into NASA's Ares I Crew Launch Vehicle Design

The U.S. Vision for Space Exploration guides the National Aeronautics and Space Administration s (NASA's) challenging missions that expand humanity s boundaries and open new routes to the space frontier. With the Agency's commitment to complete the International Space Station (ISS) and to retire the venerable Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in mid 2005 to analyze options for safe, simple, cost-efficient launch solutions that could deliver human-rated space transportation capabilities in a timely manner within fixed budget guidelines. The Exploration Launch Projects Office, chartered in October 2005, has been conducting systems engineering studies and business planning over the past few months to successively refine the design configurations and better align vehicle concepts with customer and stakeholder requirements, such as significantly reduced life-cycle costs. As the Agency begins the process of replacing the Shuttle with a new generation of spacecraft destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo launch systems for maximum operational efficiencies. To sustain the long-term exploration of space, it is imperative to reduce the $4.5 billion NASA typically spends on space transportation each year. This paper gives top-level information about how the follow-on Ares I Crew Launch Vehicle (CLV) is being designed for improved safety and reliability, coupled with reduced operations costs.

Dumbacher, Daniel

Building Operations Efficiencies into NASA's Ares I Crew Launch Vehicle Design

The U.S. Vision for Space Exploration guides the National Aeronautics and Space Administration's (NASA's) challenging missions that expand humanity's boundaries and open new routes to the space frontier. With the Agency's commitment to complete the International Space Station (ISS) and to retire the venerable Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in 2005 to analyze options for safe, simple, cost-efficient launch solutions that could deliver human-rated space transportation capabilities in a timely manner within fixed budget guidelines. The Exploration Launch Projects (ELP) Office, chartered by the Constellation Program in October 2005, has been conducting systems engineering studies and business planning to successively refine the design configurations and better align vehicle concepts with customer and stakeholder requirements, such as significantly reduced life-cycle costs. As the Agency begins the process of replacing the Shuttle with a new generation of spacecraft destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo launch systems for maximum operational efficiencies. To sustain the long-term exploration of space, it is imperative to reduce the $4 billion NASA typically spends on space transportation each year. This paper gives toplevel information about how the follow-on Ares I Crew Launch Vehicle (CLV) is being designed for improved safety and reliability, coupled with reduced operations costs. These methods include carefully developing operational requirements; conducting operability design and analysis; using the latest information technology tools to design and simulate the vehicle; and developing a learning culture across the workforce to ensure a smooth transition between Space Shuttle operations and Ares vehicle development.

Dumbacher, Daniel L.

NASA Power: Global Solar Insolation, Meteorological Parameter Data, and Web Services to Support Sustainable Building Design and Operations

The buildings industry is currently striving to adopt green solutions to make infrastructure more energy-efficient in order to meet the 2050 net-zero climate goals. This planning requires reliable environmental datasets that are crucial in designing, building, and maintaining our world’s-built environment, as well as other energy-related processes and investments. This webinar for the National Institute of Building Sciences provides an overview of NASA’s Prediction Of Worldwide Energy Resources (POWER) Project that informs decision-making and development for sustainable building design and operations by enabling public open discovery, efficient access, and convenient distribution of NASA’s Earth Observations and global atmospheric model datasets. POWER’s datastore is comprised of solar radiation and surface meteorology parameters, spanning nearly 40 years of hourly data, that are easily accessible via several access methods and tools to support three focus areas: 1) renewable energy deployment and management, 2) sustainable infrastructure, and 3) agroclimatology applications. POWER and NASA Earth Science both plan future data parameters, updated tools, and improved observations that could directly support U.S. and international sustainable development goals, climate strategies, and building information modeling. To this end, solar data from several NASA projects and meteorological data from NASA assimilation models have already been reformatted and disseminated to the public via a user-friendly web GIS-enabled based data portal through the POWER Project. POWER data is analysis-ready and accessible through an Application Programming Interface (API), ArcGIS Image Services, and the project’s Data Access Viewer enhanced (DAVe), an interactive online tool. The POWER DAVe also features data consistent with ASHRAE Climate Design Conditions and has developed web image services showing Building Climate Zones and their variability. Through those tools, the data can be downloaded into multiple formats that support the infrastructure community, including CSV and Energy Plus Weather (EPW). POWER’s entire data product catalog is available through Amazon Web Services (AWS) Open Data Registry (ODR) via a free and publicly accessible Simple Storage Service (S3). This webinar provides a full overview of the NASA POWER Project's data and services developed in collaboration with the sustainable infrastructure community. Examples of how the renewable energy and building communities have utilized POWER data products to make decisions and a preview of future data product expansion, including climate projections, and web services will also be provided. Additionally, use case stories from our broad community of users will be presented.

Paul W. Stackhouse

Computerized energy analysis for the Mars operations support building

A detailed computerized building load simulation of the Operations Support Building at the Mars Deep Space Station, Goldstone, California is described. Five energy conservation suggestions were investigated prior to implementation. The results showed that cost savings of about 16 percent of present energy costs are possible.

Yung, C. S.

SWS TechTalk Systems Modelling for SWS Safety Demonstrator 1 (SD-1): Wildfire Response Operations

Build out a System Safety Model for System-Wide Safety’s first Technical Challenge 5 (TC5) Safety Demonstrator (SD-1), which will be a demonstration of an In-Time Aviation Safety Management System in emerging wildfire response operations. Supporting the Systems Engineer and using Model-Based Systems Engineering (MBSE) practices, languages, and tools. Summer 2022 SD1 milestones: TC5-03-01 Initial Stakeholder Engagement Concept of Operations Development milestone and the upcoming TC5-03-02 Identification of key gaps and prioritization of NASA, SWS milestone.

model-based systems engineering

HVAC modifications and computerized energy analysis for the Operations Support Building at the Mars Deep Space Station at Goldstone

The key heating, ventilation, and air-conditioning (HVAC) modifications implemented at the Mars Deep Space Station's Operation Support Building at Jet Propulsion Laboratories (JPL) in order to reduce energy consumption and decrease operating costs are described. An energy analysis comparison between the computer simulated model for the building and the actual meter data was presented. The measurement performance data showed that the cumulative energy savings was about 21% for the period 1979 to 1981. The deviation from simulated data to measurement performance data was only about 3%.

Halperin, A.

Launch Complex 39A Operations Support Building Area SWMU 111 Year 3 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents the findings, observations, and results for Year 3 of operation, maintenance, and monitoring activities for the AS Interim Measure (IM) at the Launch Complex 39A Operations Support Building Area (AOSB) at Kennedy Space Center (KSC), Florida. This report was presented as an Advance Data Package during the October 2024 KSC Remediation Team (KSCRT) meeting. The reporting period for activities covered under this PMR is from August 2023 through October 2024.

Mark P Speranza

Managing computer-controlled operations

A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.

Plowden, J. B.

Teachers guide for building and operating weather satellite ground stations for high school science

A number of colleges and universities are operating APT direct readout stations. However, high school science teachers have often failed to realize the potential of meteorological satellites and their products as unique instructional tools. The ability to receive daily pictures from these satellites offers exciting opportunities for secondary school teachers and students to assemble the electronic hardware and to view real time pictures of Earth from outer space. The station and pictures can be used in the classroom to develop an approach to science teaching that could span many scientific disciplines and offer many opportunities for student research and participation in scientific processes. This can be accomplished with relatively small expenditures of funds for equipment. In most schools some of the equipment may already be available. Others can be constructed by teachers and/or students. Yet another source might be the purchase of used equipment from industry or through the government surplus channels. The information necessary for individuals unfamiliar with these systems to construct a direct readout for receiving real time APT photographs on a daily basis in the classroom is presented.

Summers, R. J.

Human Interfaces and Management of Information (HIMI) Challenges for “In-time” Aviation Safety Management Systems (IASMS)

The envisioned transformation of the National Airspace System to integrate an In-time Aviation Safety Management System(IASMS)to assure safety in Advanced Air Mobility(AAM)brings unprecedented challenges to the design of human interfaces and management of safety information. Safety in design and operational safety assurance are critical factors for how humans will interact with increasingly autonomous systems. The IASMS Concept of Operations builds from traditional commercial operator safety management and scales in complexity to AAM. The transformative changes in future aviation systems pose potential new critical safety risks with novel types of aircraft and other vehicles having different performance capabilities, flying in increasingly complex airspace, and using adaptive contingencies to manage normal and non-normal operations. These changes compel development of new and emerging capabilities that enable innovative ways for humans to interact with data and manage information. In-creasing complexity of AAM corresponds with use of predictive modeling, data analytics, machine learning, and artificial intelligence to effectively address known hazards and emergent risks. The roles of humans will dynamically evolve in increments with this technological and operational evolution. The interfaces for how humans will interact with increasingly complex and assured systems designed to operate autonomously and how information will need to be presented are important challenges to be resolved.

Lawrence J Prinzel

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118, PFAS Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from February 2022 through June 2022 at the Base Support Building (previously known as the Maintenance and Operation Building), Solid Waste Management Unit (SWMU) 014, and at the Kennedy Athletic, Recreation, and Social (KARS) Park II, (SWMU 118) located within Kennedy Space Center (KSC), Florida. SWMUs 014 and 118 were investigated independently, however, the results of the investigations indicated a single PFAS groundwater plume covering both SWMUs, so the two sites are being reported together.

PFAS

Base Support Building and Kennedy Athletic, Recreation, and Social Park II SWMU 014 and SWMU 118 PFAS 2023 Site Assessment Progress Report Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report (SAPR) presents the findings of the 2023 PFAS investigation conducted between October 12, 2022, and January 24, 2024, at the Base Support Building (previously known as the Maintenance and Operation Building), Solid Waste Management Unit (SWMU) 014, and at the Kennedy Athletic, Recreation, and Social (KARS) Park II, (SWMU 118) located within Kennedy Space Center (KSC), Florida. SWMUs 014 and 118 were initially investigated independently; however, the results of the previous investigations indicated a single PFAS groundwater plume covering both SWMUs, so the two sites are being reported together.

PFAS

Selected Lessons Learned over the ISS Design, Development, Assembly, and Operations: Applicability to International Cooperation for Standardization

This slide presentation reviews some of the lessons learned in the sphere of international cooperation during the development, assembly and operation of the International Space Station. From the begining all Partners shared a common objective to build, operate and utilize a crewed laboratory in low orbit as an international partnership. The importance of standards is emphasized.

Hirsch, David B.

Intelligent Systems and Advanced User Interfaces for Design, Operation, and Maintenance of Command Management Systems

Historically Command Management Systems (CMS) have been large, expensive, spacecraft-specific software systems that were costly to build, operate, and maintain. Current and emerging hardware, software, and user interface technologies may offer an opportunity to facilitate the initial formulation and design of a spacecraft-specific CMS as well as a to develop a more generic or a set of core components for CMS systems. Current MOC (mission operations center) hardware and software include Unix workstations, the C/C++ and Java programming languages, and X and Java window interfaces representations. This configuration provides the power and flexibility to support sophisticated systems and intelligent user interfaces that exploit state-of-the-art technologies in human-machine systems engineering, decision making, artificial intelligence, and software engineering. One of the goals of this research is to explore the extent to which technologies developed in the research laboratory can be productively applied in a complex system such as spacecraft command management. Initial examination of some of the issues in CMS design and operation suggests that application of technologies such as intelligent planning, case-based reasoning, design and analysis tools from a human-machine systems engineering point of view (e.g., operator and designer models) and human-computer interaction tools, (e.g., graphics, visualization, and animation), may provide significant savings in the design, operation, and maintenance of a spacecraft-specific CMS as well as continuity for CMS design and development across spacecraft with varying needs. The savings in this case is in software reuse at all stages of the software engineering process.

Mitchell, Christine M.

Intelligent systems and advanced user interfaces for design, operation, and maintenance of command management systems

Historically, command management systems (CMS) have been large and expensive spacecraft-specific software systems that were costly to build, operate, and maintain. Current and emerging hardware, software, and user interface technologies may offer an opportunity to facilitate the initial formulation and design of a spacecraft-specific CMS as well as to develop a more generic CMS system. New technologies, in addition to a core CMS common to a range of spacecraft, may facilitate the training and enhance the efficiency of CMS operations. Current mission operations center (MOC) hardware and software include Unix workstations, the C/C++ programming languages, and an X window interface. This configuration provides the power and flexibility to support sophisticated and intelligent user interfaces that exploit state-of-the-art technologies in human-machine interaction, artificial intelligence, and software engineering. One of the goals of this research is to explore the extent to which technologies developed in the research laboratory can be productively applied in a complex system such as spacecraft command management. Initial examination of some of these issues in CMS design and operation suggests that application of technologies such as intelligent planning, case-based reasoning, human-machine systems design and analysis tools (e.g., operator and designer models), and human-computer interaction tools (e.g., graphics, visualization, and animation) may provide significant savings in the design, operation, and maintenance of the CMS for a specific spacecraft as well as continuity for CMS design and development across spacecraft. The first six months of this research saw a broad investigation by Georgia Tech researchers into the function, design, and operation of current and planned command management systems at Goddard Space Flight Center. As the first step, the researchers attempted to understand the current and anticipated horizons of command management systems at Goddard. Preliminary results are given on CMS commonalities and causes of low re-use, and methods are proposed to facilitate increased re-use.

Potter, William J.