Search NASASearch

SEARCH · Search NASA

Results for “cable routing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Reference floating wind array designs for three representative regions

This work presents the systematic development of three open-source reference floating wind array designs. The designs are tailored to representative site conditions for three regions of the United States: Humboldt Bay off the coast of California, the Gulf of Maine, and the Gulf of America. We adopted existing reference designs for the individual 15 MW turbines, semisubmersible floating platforms, substations, mooring systems, and power cables – integrating and adapting them as needed for each location. We adapted existing dynamic cable designs to use larger conductor sizes to meet the arrays' power transmission requirements, and we set up redundant mooring systems for each substation. The layout of each array is a uniform-grid design optimized to approximately minimize the levelized cost of energy (LCOE) within a square lease area while satisfying spatial constraints. These constraints ensure adequate clearances between adjacent turbines and between underwater components during the layout optimization to prevent clashing and ensure that all components reside within the lease boundaries. Substations are included to allow accounting for intra-array cable costs. They are placed within the uniform grid to maintain the navigability of the arrays. For each feasible layout considered, annual energy production and cable routing costs are calculated and updated in the LCOE objective function. After the optimization, we refined the cable routing with a mix of algorithmic and manual methods to ensure that the cables avoid mooring system components and approach the substation with adequate clearances. We confirmed the suitability of each reference array's layout by comparing the wake losses at each wind heading angle to the wind rose, observing that the optimized layouts largely avoid wake losses in the predominant wind directions. These reference arrays provide open-source baseline designs to enable future research and innovation of floating wind technology at the array scale.

17 WIND ENERGY

FAD-Toolset (Floating Array Design Toolset) [SWR-26-056]

The Floating Array Design (FAD) Toolset is a collection of tools for modeling and designing arrays of floating offshore structures. It was originally designed for floating wind systems but has applicability for many offshore applications. A core part of the FAD Toolset is the floating array model, which serves as a high-level library for efficiently modeling a floating array, such as a floating wind array. It combines site condition information and a description of the floating array design, and contains functions for evaluating the array's behavior considering the site conditions. For example, it combines information about site soil conditions, mooring line loads, and an array's anchor characteristics to estimate the holding capacity of each anchor. The library works in conjunction with the tools RAFT, MoorPy, and FLORIS to model floating platforms, wind turbines, mooring systems, power cables, and array wakes respectively. Layered on top of the floating array model is a set of design tools that can be used for algorithmically adjusting or optimizing parts of the a floating array. Specific tools existing for mooring lines, shared mooring systems, dynamic power cables, static power cable routing, and overall array layout. These capabilities work with the design representation and evaluation functions in the floating array model, and they can be applied by users in various combinations to suit different purposes. In addition to standalone uses of the FAD Toolset, a coupling has been made with Ard, (https://github.com/NLRWindSystems/Ard) a sophisticated and flexible wind farm optimization tool. This coupling allows Ard to use certain mooring system capabilities from FAD to perform layout optimization of floating wind farms with Ard's more advanced layout optimization capabilities. The FAD Toolset works with the IEA Wind Task 49 Ontology (https://github.com/IEAWindTask49/Ontology), which provides a standardized format for describing floating wind farm sites and designs. See example use cases in our examples folder (https://github.com/NLRWindSystems/FAD-Toolset/blob/main/examples/README.md) For working with the library, it is important to understand the floating array model structure, which is described more here: https://github.com/NLRWindSystems/FAD-Toolset/blob/main/fad/README.md.

Sirkis, Leah [National Laboratory of the Rockies (

PIP-II LB650 Cryomodule Mockup

Fermilab’s PIP-II project requires accurate cable routing in the LB650 cryomodule, a confined and difficult-to-access system. We designed a full-scale mockup using a 15-ft, 7-ft 8020 frame and twenty-three PLA interfaces. CAD modeling and lifting analysis has been verified for safe assembly With all components ordered, the mockup will allow technicians to rehearse routing and identify issues before working on the real cryomodule.

Oribello, Francis [Northern Illinois U.]

Layout and Cabling Considerations for a Large Communications Antenna Array

Layout considerations for a large deep space communications antenna array are discussed. A novel fractal geometry for the antenna layout is described that provides optimal packing of antenna elements, efficient cable routing, and logical division of the array into identical sub-arrays.

R T Logan, Jr.

Snow ALbedo eVOlution (SALVO) Campaign Spectral Albedo and Related Measurements from April - June, 2024 in Utqiagivk, AK

A field-portable spectroradiometer, referred to herein as an ‘ASD’, was used to make spatially-distributed spectral albedo (350 – 2500 nm) measurements on tundra and sea ice surfaces. The ASD detector is carried in a backpack and controlled via a computer mounted on the front of the operator (see Figure 1). The ASD measures the spectral irradiance from a fiber optic cable that is routed from the backpack to a custom, gooseneck cosine collector mounted on the end of a 1-m long boom (Grenfell and Perovich, 2008). The boom was held at hip height (approximately 1 m) and had an integrated bubble level for levelling. To make an albedo measurement, first the operator collect an incident (down-welling) irradiance, followed by a reflected (up-welling) measurement. The time between incident and reflected measurements was typically between 11 and 26 seconds (interquartile range). For each measurement, 10 spectra are averaged together. Albedo is calculated as the ratio of the reflected to incident measurement, which obviates the need for absolute radiometric calibration. Albedo measurements were taken parallel to the 200-m albedo lines at 5-m increments (41 measurements) ~1 m south of the line. While the ASD operator was making measurements, an assistant kept notes on the scan number associated with each measurement, the surface type (see below), and collected photos of each measurement (see companion oblique photos data archive). Measurements were made within 3 hours of solar noon.

ASD Spectroradiometer

Elliptic Aperture CCT Coils for HTS Dipole Magnets

High-temperature REBa$_{2}$Cu$_{3}$O$_{7-x}$ (REBCO) superconductors are a route to increase the field of accelerator magnets beyond the 15-16T practical limit of Nb$_{3}$Sn. REBCO cabled in a CORC geometry is a promising fit for this application, enabling the design of low inductance magnets with conductor transposition. However, the use of CORC in coils with the tight conductor bending radii typical of accelerator magnets remains a key challenge, with on-going research both on the conductor development and coil design fronts seeking to address this issue. Here, in this work we explore the tradeoffs between circular and elliptic aperture canted-cosine-theta (CCT) coils when the conductor minimum bending radius is a key consideration, concluding that aperture ellipticity is an important free parameter in the optimization of magnetically efficient CORC dipole magnets. In particular, we show that elliptic bore designs enable a regime of smaller aperture HTS coils, an important result for LTS-HTS hybrid magnets and more generally for accelerator applications benefiting from non-circular magnet apertures. To this end we present an elliptic aperture dipole design optimized for hybrid testing within the US Magnet Development Program (US-MDP) and share 77 K test results of a prototype coil which provides first experimental confirmation of the advantages.

Brouwer, L. [Lawrence Berkeley National Laboratory

Helium recovery system at IB3a

The increasing need for optimal and sustainable use of cryogenic resources to support Fermilab’s scientific mission has highlighted the necessity of improving the Laboratory’s helium management practices. An assessment of cryogenic test facilities identified the Technical Division’s Industrial Building 3a (IB3A) as a key site requiring upgrades to integrate a helium recovery system. The IB3A facility is essential for characterizing and testing superconductors, cables, and coils for various R&D projects, including the US High-Luminosity LHC Accelerator Upgrade Project (AUP), Mu2e, and other external collaborations. Currently, the facility relies on 500 L helium Dewars and vents the vaporized helium directly into the atmosphere, leading to significant helium loss. Given the non-renewable nature of helium, recovering and reusing this resource is critical for the sustainability of Fermilab’s operations. To address this challenge, a project has been initiated to connect IB3A to an existing helium purification station and refrigeration system located in another building via a dedicated pipeline pass over the roof of several buildings. This solution will enable the efficient capture of vented helium, its transfer to the purification station, and subsequent liquefaction for reuse in future operations. The project includes a detailed design phase, specifying the pipeline route, flow control mechanisms, and integration with the existing cryogenic infrastructure, followed by phased implementation and commissioning. By implementing this pipeline connection and upgrading IB3A, Fermilab aims to significantly reduce helium waste, lower operational costs, and align with its commitment to sustainability. This initiative provides a model for resource-efficient cryogenic operations and reinforces the Laboratory’s capacity to support its science mission for the long term.

Porwisiak, D. [Fermilab]

Helium recovery system at IB3A

The growing demand for sustainable cryogenic operations at Fermilab has underscored the need to improve helium management, particularly at the Industrial Building 3A (IB3A) test facility. IB3A characterizes and tests superconductors, cables, and coils for projects such as the HL-LHC AUP and Mu2e, yet currently relies on 500 L Dewars whose boil-off is vented to atmosphere, wasting a critical, non-renewable resource and increasing the cost of testing. A project is therefore under way to link IB3A to an existing purification and liquefaction station in a neighboring building through a dedicated pipeline. Captured helium will be transferred, purified, reliquefied, and returned for reuse, cutting losses and operating costs. This paper details the first two project phases: "Design and Engineering" and "Procurement and Installation." The design phase finalizes pipeline specifications, establishes flow-control requirements, and resolves integration challenges with existing cryogenic infrastructure. The procurement and installation phase covers material sourcing, pipeline construction, and deployment of control and monitoring systems to assure reliable, efficient operation. Key technical hurdles-route optimization, pressure drop mitigation, and interface compatibility-are discussed alongside implemented solutions. Implementing the pipeline and upgrading IB3A will dramatically reduce helium consumption and therefore testing cost, strengthening Fermilab's capacity to support frontier science far into the future.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]