Search NASA⌕ Search

SEARCH · Search NASA

Results for “campus”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Pacific Northwest National Laboratory Regional Populations – 2020 Census: Richland Campus and Sequim Campus

The U.S. Department of Energy conducts radiological operations in south-central (Richland) and northwestern (Sequim) Washington State. Collective dose estimates to regional populations must be performed to provide a measure of the impact from site radiological releases. Results of the U.S. 2020 Census and, for the Sequim location only, the Canada 2021 Census, were used to determine counts and distributions for the residential population located within 50 miles (80 kilometers) of the Pacific Northwest National Laboratory Richland Campus and the Sequim Campus. Since the 2010 Census, total regional populations increased 25–40 percent. This revision updates and expands the data presented in the prior report by the addition of PNNL-Richland Campus population distribution information.

2020 census↗

Data Quality Objectives Supporting Radiological Air Emissions Monitoring for the PNNL-Richland Campus: North Campus Construction (Rev. 3)

Starting in fiscal year 2023, the north area of the PNNL-Richland Campus will undergo development. Initially, infrastructure (water, electrical) improvements will be installed. Later development includes the construction of several new office buildings. The area to be developed currently contains no buildings but does have two existing solar-powered ambient air sampling stations. Under the requirements of Washington State Department of Health Radioactive Air Emissions License -005, the PNNL-Richland Campus must operate and maintain a radiological air monitoring program. This revision documents and evaluates how the new North Campus construction impacts ambient air surveillance stations within the development region. This revision also considers current stack configurations and uses an updated environmental dispersion model and updated meteorological data. The DQO team concluded that one sampling station in the construction area will be relocated and the other remain in place. The evaluations conducted for this DQO also identified a third sampling station outside the development area that is recommended for relocation as a result of updated dispersion modeling. Recommended sites for the relocations are presented. Considerations for sampling in and around a construction zone are also addressed. Additionally, programmatic improvements to the ambient air sampling program were identified in the DQO process.

54 ENVIRONMENTAL SCIENCES↗

Earth Source Heat: A Cascaded Systems Approach to DDU of Geothermal Energy on the Cornell Campus

This report documents the completion of the DOE study DE-EE0008103: Earth Source Heat: A Cascaded Systems Approach to DDU of Geothermal Energy on the Cornell Campus. This study involved a comprehensive evaluation of the potential for Earth Source Heat (ESH), Cornell’s specific application of Deep Direct Use (DDU) geothermal energy, to create a viable renewable source of thermal energy for its Ithaca, NY campus district heating system. The study included stochastic modeling that married each of two potential subsurface resources (two specific geological reservoirs) to documented campus heating operations based on hourly campus heating profiles and proposed integrated equipment controls (variable speed pumps and heat pumps). The outputs of the subsurface modeling were used as inputs for a Cornell-developed surface heat use Excel-based modeling program (the program was named “Modeled ENergy Use”, or “MEnU”). This allowed Cornell to compute realistic annual totals of extractable and useable heat for the campus, including details like heat losses, minimum summer demand, and controllable building temperature settings. The Cornell team then evaluated the costs and benefits of each modeled scenario. The primary evaluation was a standard “single bottom line” economic calculation for the Levelized Cost of Heat (LCOH). This represents the annualized cost (per unit heat) for Cornell. Additional valuations were also computed based on the benefit to the environment and to the regional economy (i.e., economic benefits external to campus). The results of this study demonstrate that if suitable reservoir flow can be attained, Earth Source Heat would be a viable technology to supply Cornell’s district heating system. This viability is based on the following criteria: (1) The modeled system produced a total useable heat output that exceeded the minimum annual campus heat load determined at the onset of the project (i.e., offsetting at least 20% of the annual campus thermal load). The output range is substantial depending on both the subsurface resource and the surface applications; at the high end, our modeled solutions produced up to ~70% of existing campus heat load with a single well pair producing 70 kg/s with integrated high-temperature heat pumps, and (2) Modeling demonstrated that multiple geothermal reservoirs could provide economically viable results when heat pumps were strategically integrated, a design that has been proven in at least one European installation already. In this context, “economically viable” means that the LCOH for the project is less than the regional commercial price of heat that would be generated using natural gas (the most common and cheapest fossil alternative in our area). Based on a single-bottom-line (LCOH) valuation, our results show that economic success is likely for any reservoir deeper than about 2.25 km where a sufficient permeability exists (or can be created with stimulation or similar engineering enhancement) and reasonable production temperatures sustained over time. The LCOH values of $\$ 4.77$ to $\$ 6.46$ per MMBtu are all lower than the comparable cost of providing heat energy with a natural gas boiler for a facility in the Northeast U.S. that obtains natural gas at commercial rates (Commercial heat costs would include at least $\$ 9.41$ in fuel costs, representing total boiler/transfer efficiency of 85% using gas at $\$ 8.00$ per MMBtu; LCOH would be higher if capital equipment and other operating costs were included). In addition to LCOH, Cornell’s scope also included evaluation of the Environmental value and Regional Economic value of each scenario. When considering the environmental and regional economic value of such a project, the overall “triple bottom line” cost (i.e., the LCOH less the LCOH ENV and LCOH REG values) is even lower and in some cases negative; i.e., in some cases a project achieving the listed performance would have higher value to the environment and to the regional economy than the total project costs over the 30-year project timeframe.

15 GEOTHERMAL ENERGY↗

Transactive Campus Energy Systems: An R&D Testbed for Renewables, Integration, Efficiency, and Grid Services (CRADA 356 / Amendment 1)

The Clean Energy and Transactive Campus (CETC) work described in this report was done as part of Amendment 1 to Campus Cooperative Research and Development Agreement (CRADA) 356, the Transactive Campus CRADA with the Washington State Department of Commerce (Commerce) between the U.S. Department of Energy’s (DOE’s), Pacific Northwest National Laboratory (PNNL) and the Commerce through the Clean Energy Fund (CEF). The original project team consisted of PNNL, the University of Washington (UW) and Washington State University (WSU), to connect the PNNL, UW, and WSU campuses to construct and operate the testbed as both a regional flexibility resource and as a platform for research and development (R&D) for buildings/grid integration. Building on the foundational transactive system established by the Pacific Northwest Smart Grid Demonstration (PNWSGD), the purpose of the project was to construct the testbed as both a regional flexibility resource and as a platform for R&D on buildings/grid integration and information-based energy efficiency. The testbed supports the integration of renewables and other regional needs, using the flexibility provided by building loads, energy storage, and smart inverters for batteries and photovoltaic (PV) solar systems, at four physical scales: multiple campuses, campus, microgrid and building.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SARS-CoV-2 raw wastewater surveillance from student residences on an urban university campus

The COVID-19 pandemic brought about an urgent need to monitor the community prevalence of infection and detect the presence of SARS-CoV-2. Testing individual people is the most reliable method to measure the spread of the virus in any given community, but it is also the most expensive and time-consuming. Wastewater-based epidemiology (WBE) has been used since the 1960s when scientists implemented monitoring to measure the effectiveness of the Polio vaccine. Since then, WBE has been used to monitor populations for various pathogens, drugs, and pollutants. In August 2020, the University of Tennessee-Knoxville implemented a SARS-CoV-2 surveillance program that began with raw wastewater surveillance of the student residence buildings on campus, the results of which were shared with another lab group on campus that oversaw the pooled saliva testing of students. Sample collection began at 8 am, and the final RT-qPCR results were obtained by midnight. The previous day’s results were presented to the campus administrators and the Student Health Center at 8 am the following morning. The buildings surveyed included all campus dormitories, fraternities, and sororities, 46 buildings in all representing an on-campus community of over 8,000 students. The WBE surveillance relied upon early morning “grab” samples and 24-h composite sampling. Because we only had three Hach AS950 Portable Peristaltic Sampler units, we reserved 24-h composite sampling for the dormitories with the highest population of students. Samples were pasteurized, and heavy sediment was centrifuged and filtered out, followed by a virus concentration step before RNA extraction. Each sample was tested by RT-qPCR for the presence of SARS-CoV-2, using the CDC primers for N Capsid targets N1 and N3. The subsequent pooled saliva tests from sections of each building allowed lower costs and minimized the total number of individual verification tests that needed to be analyzed by the Student Health Center. Our WBE results matched the trend of the on-campus cases reported by the student health center. The highest concentration of genomic copies detected in one sample was 5.06 × 10 7 copies/L. Raw wastewater-based epidemiology is an efficient, economical, fast, and non-invasive method to monitor a large community for a single pathogen or multiple pathogen targets.

60 APPLIED LIFE SCIENCES↗

University of Wisconsin-Madison Campus-Wide Deep Dive

In June 2019, staff members from the Engagement and Performance Operations Center (EPOC) and the University of Wisconsin–Madison Division of Information Technology (UW DoIT) met with researchers for the purpose of a Campus-Wide Deep Dive. The goal of this meeting was to help characterize the requirements for a number of research and educational activities, and to enable cyberinfrastructure support staff to better understand the needs of researchers. Material for this event includes both the written documentation from nine projects, and the campus technology organization, but also a writeup of the discussion that took place in person. The Case Studies highlighted the ongoing challenges that the University of Wisconsin–Madison will face in the coming years to support, encourage, and grow several emerging and established use cases. The University of Wisconsin–Madison received an NSF award to help support upgrading the campus network in 2012, specifically to include a Science DMZ and monitoring equipment. However, there is a currently identified need to refresh equipment and identify and work more closely with current campus researchers. Updates to the state network, as well as the campus, are being planned and were discussed during this event. As part of the overall review, the necessity of working more closely with research teams as they are still in the planning phase was discussed so that DoIT can better understand and adapt to changes in requirements as the research demands grow over time . Additional challenges with securing sensitive data, cybersecurity, and supporting collaborations were also discussed.

97 MATHEMATICS AND COMPUTING↗

Baylor University Campus-Wide Deep Dive

In January 2020, staff members from the Engagement and Performance Operations Center (EPOC) and the Lonestar Education And Research Network (LEARN) met with researchers and staff at Baylor University for the purpose of a Campus-Wide Deep Dive into research drivers. The goal of this meeting was to help characterize the requirements for five campus research use cases and to enable cyberinfrastructure support staff to better understand the needs of the researchers they support. Profiled scientific use cases included: - Experimental High Energy Physics (HEP) - Proton Computed Tomography (pCT) - Nutrition and Relation to Digestive Microbiome - Baylor University Core Research Facilities - Molecular Quantum-dot Cellular Automata (QCA), and Material Science of Quantum Computing - Modeling and Simulation of Low-Dimensional and Nano-Structured Materials - Computational Fluid Dynamics Material for this event included the written documentation from each of the research areas at Baylor University, documentation about the current state of technology support, and a write-up of the discussion that took place in person. The Case Studies highlighted the ongoing challenges that Baylor University has in supporting a cross-section of established and emerging research use cases. Each Case Study mentioned unique challenges which were summarized into common needs. These included: - Tradeoffs for network/software security, and usability of the resulting infrastructure. Better communication to set expectations and understand realities is required. - Computation use on campus is widespread and healthy. While no major problems were uncovered, upgrades to maintain current usage patterns and encourage growth will be required. - Storage is a critical need for enterprise use cases and research. In particular, a campus wide ‘storage architecture’ to support research use cases (e.g. instruments, data sharing) is required in the 2-5 year time window. - Instrumentation on campus is healthy and expanding. Technology must scale with this in the form of computation and storage. - Working with LEARN to upgrade network capacity (in multiples of 10G, or upgrades to 100G) will be required in the 1-3 year time frame. - Network monitoring and visibility will help to establish external science use cases. - Data sharing via portal systems is not currently a critical need, but growing in scope. EPOC can assist Baylor with options.

99 GENERAL AND MISCELLANEOUS↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2019

This report documents radionuclide air emissions that result in the 2019 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2019 from PNNL Richland Campus sources is 1.4E-5 mrem (1.4E-7 mSv) EDE. The dose from all fugitive sources is 1.3E-6 mrem (1.3E-8 mSv) EDE. The dose from radon emissions is 1.5E-10 mrem (1.5E-12 mSv) EDE. No nonroutine emissions occurred in 2019. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.5E-5 mrem (1.5E-7 mSv) EDE, or more than 10,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2020

This report documents radionuclide air emissions that result in the 2020 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2020 from PNNL Richland Campus sources is 1.5E-5 mrem (1.5E-7 mSv) EDE. The dose from all fugitive sources is 2.0E-6 mrem (2.0E-8 mSv) EDE. The dose from radon emissions is 9.3E-9 mrem (9.3E-11 mSv) EDE. No nonroutine emissions occurred in 2020. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.7E-5 mrem (1.7E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2021

This report documents radionuclide air emissions that result in the 2021 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2021 from PNNL Richland Campus sources is 1.7E-5 mrem (1.7E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 2.1E-9 mrem (2.1E-11 mSv) EDE. No nonroutine emissions occurred in 2021. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.8E-5 mrem (1.8E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2022

This report documents radionuclide air emissions that result in the 2022 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2022 from PNNL Richland Campus sources is 2.1E-5 mrem (2.1E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 9.2E-9 mrem (9.2E-11 mSv) EDE. No nonroutine emissions occurred in 2022. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 2.3E-5 mrem (2.3E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart↗

PNNL Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2020

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2020 was 3.5E-05 mrem (3.5E-07 mSv). No non-routine emissions occurred in 2020. The Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

PNNL Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2021

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2021 was 5.4E-05 mrem (5.4E-07 mSv). No non-routine emissions occurred in 2021. The Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

PNNL-Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2022

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL-Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2022 was 7.5E-07 mrem (7.5E-09 mSv). No non-routine emissions occurred in 2022. The PNNL-Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2023

This report documents radionuclide air emissions that result in the 2023 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL-Richland campus MEI from routine emissions sources, excluding radon, in 2023 from campus sources is 2.0E-5 mrem (2.0E-7 mSv) EDE. The dose from radon emissions is 4.0E-7 mrem (4.0E-09 mSv) EDE. No nonroutine emissions occurred in 2023. The total radiological dose to the MEI from all PNNL-Richland campus radionuclide emissions, including fugitive emissions and radon, is 2.1E-5 mrem (2.1E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL-Richland campus is in compliance.

40 CFR 61 Subpart H↗

University of Central Florida Campus-Wide Deep Dive

EPOC uses the Deep Dive process to discuss and analyze current and planned science use cases and anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Deep Dives help ensure that key stakeholders have a common understanding of the issues and the actions that a campus or regional network may need to undertake to offer solutions. The EPOC team leads the effort and relies on collaboration with the hosting site or network, and other affiliated entities that participate in the process. EPOC organizes, convenes, executes, and shares the outcomes of the review with all stakeholders. Between December 2020 and August 2021, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff at University of Central Florida (UCF) for the purpose of a Campus-Wide Deep Dive into research drivers. The goal of this meeting was to help characterize the requirements for five campus research use cases and to enable cyberinfrastructure support staff to better understand the needs of the researchers they support.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Fermilab’s Muon Campus: Status, Experiments, and Future

The Fermilab Muon Campus, repurposed Tevatron-era Antiproton Source facilities, is currently the home to the g-2 and Mu2e muon experiments. Collecting data since 2017, the g-2 experiment is wrapping up a final run before the Muon Campus transitions to Mu2e operation. Currently in the commissioning process, the Mu2e experiment is expected to begin calibration and data collection in fiscal year 2024. A majority of the Muon Campus is shared between the two experiments, however the modes of operation for each are significantly different. An 8 GeV primary proton beam strikes a target to produce a 3.1 GeV/c secondary muon beam for g-2, while the Mu2e experiment uses the Delivery Ring, formerly the Antiproton Accumulator Ring, for a pulsed, resonantly extracted, 8 kW, 8 GeV proton beam incident on a target in the experiment's target hall to produce a muon beam for the experiment. The design and current state of the Muon Campus and the current and future plans of the g-2 and Mu2e experiments, including the transition between operating modes, will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗