Search NASA⌕ Search

SEARCH · Search NASA

Results for “campus master plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Los Alamos National Laboratory Campus Master Plan Communication Strategy

The purpose of this Campus Master Plan (CMP) Communication Strategy is to establish an appropriate approach to communication that ensures the comprehensive site planning (henceforth campus master planning) process and associated products for the Los Alamos National Laboratory (LANL) site are effective and sustainable.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

DOE Environmental Management and Newport News Nuclear BWXT Briefing - LANL’s Campus Master Plan [Slides]

Triad proposed a robust integrated planning effort during the bidding process and began this effort soon after the LANL contract transition. Within months of Triad commencing this planning process, NA-LA delivered a Contracting Officer (CO) letter requiring: (1) Area Development Plan for the Pajarito Corridor delivered by end of FY19 (completed), and (2) The Campus Master Plan (CMP) to be delivered by end of FY21 (completed).

42 ENGINEERING↗

Sequim Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of ten U.S. Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences, and data analytics laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the- art equipment, and mission-ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and other federal agencies and industry through strategic partnership projects on a not-to-interfere basis. Currently operated by Battelle Memorial Institute, PNNL occupies more than 2.3 million gross square feet (GSF) of buildings and employs approximately 4,700 staff members. PNNL has implemented a rolling 10-year campus strategy, initiated in fiscal year 2013, designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. This strategy is incorporated into PNNL’s annual Laboratory Plan, which serves as DOE-SC’s equivalent of the Five- Year Site Plan required by DOE Order 430.1C Chg. 1, Real Property Asset Management. The PNNL Sequim Campus is located in Clallam County, just outside of Sequim, Washington. PNNL Sequim builds upon a rich history of research related to marine and coastal resources, environmental chemistry, water resources modeling, ecotoxicology, biotechnology, and national security. Facilities at the PNNL Sequim Campus were designed to take advantage of two unique locational assets: the pristine coastal ocean water in Sequim Bay and the region’s exceptionally clean air. Research facilities on the waterfront are supplied with up to 200 gallons per minute (gpm) of seawater and/or groundwater that enables research on aquatic systems ranging from fully seawater to fresh water, with an onsite water treatment system that removes all biological and hazardous chemical residues prior to discharge. Multiple large seawater tanks outside the waterfront laboratories, along with a boat ramp, pier, and floating dock, enable lab-to-field research. The uplands facility takes advantage of the amazing air quality and is built and operated to enable ultratrace chemical/radiological analytical chemistry. This combination of capabilities is not available at any other marine laboratory in the nation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Comprehensive Land Use and Environmental Stewardship

Comprehensive Land Use and Environmental Stewardship (CLUES) Report serves as a summary document of the land use and environmental stewardship activities occurring on the Idaho National Laboratory (INL) Site (Desert) and the Research and Education Campus (REC) within Idaho Falls. Land and facility use planning and decisions at the INL Site are guided by a comprehensive planning process in accordance with the United States (U.S.) Department of Energy (DOE) Order 430.1C, “Real Property Asset Management,” which states "Establish a data-driven, risk-informed, performance-based approach to the life-cycle management of real property assets that aligns the real property portfolio with DOE mission needs; acquire, manage, positively account for, and dispose of real property assets in a safe, secure, cost-effective, and sustainable manner; and ensure the real property portfolio is appropriately sized, aligned, and in the proper condition to support efficient mission execution." Land use planning, like Campus Master Planning and 5-Year Facility Planning, provides a means for better, more sustainable use of the INL Site in a coordinated effort to ensure current and future mission needs are met, including acquisition, recapitalization, maintenance, disposition, real property utilization and long-term stewardship. This document and all functions of INL are guided by the DOE Vision for INL and the INL Mission and builds on the baseline established in the FY 2015 CLUES Report. However, it delivers a revised structure with focus on new resource management zones, which provide organization of key management considerations and access restrictions to optimize land use and environmental stewardship. A new set of thematic Guiding Principles presented in this report provide the intent and sustainable management direction to protect the INL Site natural environment. They demonstrate that the mission and vision of DOE and INL can be realized with inclusion of first of a kind technology, private sector development, and globally recognized testing and demonstration. This CLUES Report encourages comprehensive management decision-making with additional resource discussions for sustainability, the built environment, and the ecological landscape at the INL Site. Enhanced resource considerations and trends emphasize the importance of air, land use, environmental, subsurface, and cultural resources. The INL Site supports exceptional and interdependent resources. A diversity of bat species are accommodated by culturally significant caves distributed around the Site. Big game species like elk, deer, and moose seek vegetation communities which are protected by long-term stewardship and monitoring programs.

99 GENERAL AND MISCELLANEOUS↗

Finding of No Adverse Effect for the Façade Alteration of Building 23-117, Administration Building, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to update the façade of Building 23-117 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15256), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada. The purpose of the undertaking is to incorporate Building 23-117 into the new Mercury campus in accordance with the master plan for the modernization of Mercury. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-117 was built in 1982 as the architect-engineer Administration Building1 for Holmes & Narver, a government contractor who helped design and engineer the town of Mercury and other areas on the NNSS from its inception until the termination of their contract in 1990. The building continued to be used by subsequent government contractors and is currently still in use by MSTS. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-117 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and is subject to the stipulations of the Mercury PA. The NNSA/NFO requested that Desert Research Institute (DRI), cultural resource subject matter experts, analyze the effects of the proposed project on historic properties in the Area of Potential Effect (APE) and make a recommended finding for the undertaking in accordance with Section 106 of the NHPA and the Mercury PA. The purpose of this letter report is to submit documentation related to the mitigation of the façade alteration of Building 23-117 (Nevada State Historic Preservation Office [SHPO] Resource No. B15256) in the Mercury Historic District (MHD, SHPO Resource No. D230). This submission is intended to comply with the stipulations in the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

The Center Master Plan For NASA Glenn Research Center

The Center Master Plan for NASA Glenn Research Center is a comprehensive survey of NASA Glenn's current facility assets and a vision of how we see the facilities will change over the next 20 years in order to support the changing NASA Mission. This Center Master Plan is a vital management tool used by all organizations for making near term decisions and in future planning. During the summer of 2004, I worked with Joseph Morris, the Chief Architect in the Facilities Division, on beginning this Center Master Planning Process. The previous Master Plan was completed by the Center in 1985 and contained general information on the background of the facility as well as maps detailing environmental and historic records, land use, utilities, etc. The new Master Plan is required for the Center by NASA headquarters and will include similar types of information as used in the past. The new study will provide additional features including showing how individual buildings are linked to the programs and missions that they serve. The Master Plan will show practical future options for the facility s assets with a twenty year look ahead. The Plan will be electronically retrievable so that it becomes a communications tool for Center personnel. A Center Master Plan, although required, is very beneficial to NASA Glenn Research Center in aiding management with the future direction of the campus. Keeping up-to-date information and future plans readily available to all of NASA Glenn will insure that future real property development efficiently and effectively supports the missions camed out and supported by the Center. A Center Master Plan will also facilitate coordination with Center supported programs, stakeholders, and customers. In addition, it will provide a basis for cooperative planning with local and other governmental organizations and ultimately ensure that future budgets include the Center program needs described in the plan. This will ensure that development plans are safe, practical, and cost effective. To properly formulate any future plans, background information and research are required. Before bringing in a consultant to tackle the three year process anticipated to prepare a Center Master Plan, my job was to gather information on different organizations contributions to the NASA mission, their facility needs, consistent trends they observe, etc. I conducted numerous interviews with personnel such as Directorate Representatives, Division Chiefs, Branch Chiefs, System Managers and Building Managers. I documented the information I received from them for future use. I used the information to create various color-coded maps layering the different data. This was done with the ending objective being to collect the information and place it in a database that will be linked with Aperture (a computer program that generates color-coded map layers from database information) and made electronically retrievable to the Planning Consultant, NASA personnel, program stakeholders, and other governmental agencies. My goal this summer was to gather information and ideas appropriate for use in NASA Glenn Research Center s Master Plan and organize them for future application by the Planning Consultant. By the end of the summer, after completion of my goal, I will utilize my knowledge and create an array of preliminary future plans for the facility that can be passed along as a guidance tool.

Bigach, Kristin M.↗

A Guide to Energy Master Planning of High-Performance Districts and Communities

This guide was developed with partners throughout the United States to demonstrate how implementing district-scale high-performance strategies can be successful and scalable approaches to achieving deep energy savings that increase affordability, improve resilience, reduce emissions, and foster economic development. This document serves as a framework for districts, campuses, and communities, illustrating an iterative process of building support for, planning, and implementing high-performance districts by engaging stakeholders, setting aggressive energy goals, completing technical and financial planning, and implementing a high-performance energy master plan. The information in this guide is based on a 3-year U.S. Department of Energy Zero Energy District Accelerator and a range of real-world examples of emerging high-performance districts. It is particularly useful for architects, planners, engineers, local government agencies, and real estate developers in the early phases of planning a district with high-performance or other deep energy goals. For the purposes of this guide, a high-performance district is a multibuilding development that achieves aggressive energy and related goals such as zero energy, carbon neutrality, sustainability, ultra-efficiency, etc. High-performance districts optimize energy efficiency to reduce energy loads and use renewable energy resources to meet the remaining loads whenever possible. The Energy Independence and Security Act of 2007 defines a high-performance building as “a building that integrates and optimizes on a life cycle basis all major high-performance attributes, including energy conservation, environment, safety, security, durability, accessibility, cost-benefit, productivity, sustainability, functionality, and operational considerations.” High-performance districts are collections of such buildings that take advantage of the synergies available when energy consumption and production are considered at a district level rather than one building at a time.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗